docs: Remove obsolete planning directory
Removed docs/planning/ (dated 2026-01-04) containing: - Board.md (obsolete Kanban board) - config.yml (old configuration) - REESTRUCTURACION-PROGRESS.md (old GAMILIT restructuring) Part of ST3.2 Documentation Purge. Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
parent
c5e33555be
commit
a9224c661a
@ -1,142 +0,0 @@
|
|||||||
---
|
|
||||||
id: "Board"
|
|
||||||
title: "Tablero Kanban - Trading Platform (Trading Platform)"
|
|
||||||
type: "Documentation"
|
|
||||||
project: "trading-platform"
|
|
||||||
version: "1.0.0"
|
|
||||||
updated_date: "2026-01-04"
|
|
||||||
---
|
|
||||||
|
|
||||||
# Tablero Kanban - Trading Platform (Trading Platform)
|
|
||||||
|
|
||||||
**Sprint Actual:** Sprint 1 (Fase Inicial)
|
|
||||||
**Ultima actualizacion:** 2026-01-04
|
|
||||||
**Velocity Objetivo:** 40 SP
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Resumen del Sprint
|
|
||||||
|
|
||||||
| Metrica | Valor |
|
|
||||||
|---------|-------|
|
|
||||||
| Story Points Planificados | 0 |
|
|
||||||
| Story Points Completados | 0 |
|
|
||||||
| Tareas Pendientes | 0 |
|
|
||||||
| Tareas En Progreso | 0 |
|
|
||||||
| Tareas Completadas | 0 |
|
|
||||||
| Bugs Abiertos | 0 |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Backlog
|
|
||||||
|
|
||||||
Items pendientes de planificacion para futuros sprints.
|
|
||||||
|
|
||||||
| ID | Titulo | Tipo | SP | Prioridad |
|
|
||||||
|----|--------|------|-----|-----------|
|
|
||||||
| - | Ver `/docs/04-fase-backlog/` | - | - | - |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Por Hacer (To Do)
|
|
||||||
|
|
||||||
Items planificados para el sprint actual, pendientes de iniciar.
|
|
||||||
|
|
||||||
| ID | Titulo | Asignado | SP | Prioridad | Epic |
|
|
||||||
|----|--------|----------|-----|-----------|------|
|
|
||||||
| - | - | - | - | - | - |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## En Progreso (In Progress)
|
|
||||||
|
|
||||||
Items actualmente en desarrollo.
|
|
||||||
|
|
||||||
| ID | Titulo | Asignado | SP | Inicio | Epic |
|
|
||||||
|----|--------|----------|-----|--------|------|
|
|
||||||
| - | - | - | - | - | - |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Bloqueado (Blocked)
|
|
||||||
|
|
||||||
Items bloqueados esperando dependencias o decision.
|
|
||||||
|
|
||||||
| ID | Titulo | Asignado | Bloqueado Por | Desde |
|
|
||||||
|----|--------|----------|---------------|-------|
|
|
||||||
| - | - | - | - | - |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## En Revision (Review)
|
|
||||||
|
|
||||||
Items completados pendientes de validacion.
|
|
||||||
|
|
||||||
| ID | Titulo | Asignado | Revisor | SP |
|
|
||||||
|----|--------|----------|---------|-----|
|
|
||||||
| - | - | - | - | - |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Hecho (Done)
|
|
||||||
|
|
||||||
Items completados y validados en este sprint.
|
|
||||||
|
|
||||||
| ID | Titulo | Completado Por | SP | Fecha |
|
|
||||||
|----|--------|----------------|-----|-------|
|
|
||||||
| - | - | - | - | - |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Bugs Abiertos
|
|
||||||
|
|
||||||
| ID | Titulo | Severidad | Modulo | Asignado |
|
|
||||||
|----|--------|-----------|--------|----------|
|
|
||||||
| - | - | - | - | - |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Notas del Sprint
|
|
||||||
|
|
||||||
- **2026-01-04:** Inicializacion de infraestructura SCRUM
|
|
||||||
- Creado AGENTS.md (guia de agentes)
|
|
||||||
- Creado config.yml (configuracion del proyecto)
|
|
||||||
- Creado Board.md (tablero Kanban)
|
|
||||||
- Creadas carpetas: planning/, 04-fase-backlog/, 96-quick-reference/, archivados/
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Historico de Sprints
|
|
||||||
|
|
||||||
| Sprint | Fechas | Velocity | Completado |
|
|
||||||
|--------|--------|----------|------------|
|
|
||||||
| Sprint 0 | Pre-2026-01 | N/A | Desarrollo inicial |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Modulos del Proyecto
|
|
||||||
|
|
||||||
| Epica | Nombre | US | RF | ET | Estado |
|
|
||||||
|-------|--------|-----|-----|-----|--------|
|
|
||||||
| OQI-001 | Fundamentos Auth | 12 | 5 | 5 | Implementado |
|
|
||||||
| OQI-002 | Education | 8 | 6 | 6 | Implementado |
|
|
||||||
| OQI-003 | Trading Charts | 18 | 8 | 8 | Implementado |
|
|
||||||
| OQI-004 | Investment Accounts | 14 | 6 | 7 | Implementado |
|
|
||||||
| OQI-005 | Payments Stripe | 6 | 6 | 6 | Implementado |
|
|
||||||
| OQI-006 | ML Signals | 10 | 5 | 5 | Implementado |
|
|
||||||
| OQI-007 | LLM Agent | 10 | 6 | 6 | Implementado |
|
|
||||||
| OQI-008 | Portfolio Manager | 12 | 7 | 7 | Implementado |
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Referencias
|
|
||||||
|
|
||||||
- **Backlog completo:** `/docs/04-fase-backlog/README.md`
|
|
||||||
- **Configuracion:** `/docs/planning/config.yml`
|
|
||||||
- **Guia de agentes:** `/AGENTS.md`
|
|
||||||
- **Mapa de documentacion:** `/docs/_MAP.md`
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
**Mantenido por:** Scrum Master / Architecture Team
|
|
||||||
**Actualizacion:** Al cambiar estado de cualquier item
|
|
||||||
@ -1,209 +0,0 @@
|
|||||||
---
|
|
||||||
id: "REESTRUCTURACION-PROGRESS"
|
|
||||||
title: "Progreso de Reestructuracion - Trading Platform"
|
|
||||||
type: "Documentation"
|
|
||||||
project: "trading-platform"
|
|
||||||
version: "1.0.0"
|
|
||||||
updated_date: "2026-01-04"
|
|
||||||
---
|
|
||||||
|
|
||||||
# Progreso de Reestructuracion - Trading Platform
|
|
||||||
|
|
||||||
**Fecha:** 2026-01-04
|
|
||||||
**Estandar:** GAMILIT (SIMCO)
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Resumen Ejecutivo
|
|
||||||
|
|
||||||
Se ha realizado la reestructuracion de documentacion del proyecto trading-platform siguiendo el estandar GAMILIT.
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## ETAPA 1: Infraestructura SCRUM - COMPLETADA
|
|
||||||
|
|
||||||
### Archivos Creados
|
|
||||||
|
|
||||||
| Archivo | Estado | Descripcion |
|
|
||||||
|---------|--------|-------------|
|
|
||||||
| `/AGENTS.md` | Creado | Guia para agentes IA con prefijos OQI-* |
|
|
||||||
| `/docs/planning/Board.md` | Creado | Tablero Kanban |
|
|
||||||
| `/docs/planning/config.yml` | Creado | Configuracion del proyecto |
|
|
||||||
| `/docs/04-fase-backlog/README.md` | Creado | Indice del backlog |
|
|
||||||
| `/docs/04-fase-backlog/DEFINITION-OF-READY.md` | Creado | Criterios DoR |
|
|
||||||
| `/docs/04-fase-backlog/DEFINITION-OF-DONE.md` | Creado | Criterios DoD |
|
|
||||||
|
|
||||||
### Carpetas Creadas
|
|
||||||
|
|
||||||
- `/docs/planning/tasks/`
|
|
||||||
- `/docs/planning/bugs/`
|
|
||||||
- `/docs/04-fase-backlog/`
|
|
||||||
- `/docs/96-quick-reference/`
|
|
||||||
- `/docs/archivados/`
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## ETAPA 2: YAML Front-Matter - EN PROGRESO
|
|
||||||
|
|
||||||
### Modulos Completados
|
|
||||||
|
|
||||||
| Modulo | US | RF | ET | Total | Estado |
|
|
||||||
|--------|-----|-----|-----|-------|--------|
|
|
||||||
| OQI-001 (Auth) | 12 | 5 | 5 | 22 | COMPLETADO |
|
|
||||||
| OQI-002 (Education) | 8 | 6 | 6 | 20 | COMPLETADO |
|
|
||||||
| OQI-003 (Trading) | 18 | 7 | 0 | 25 | PARCIAL (faltan ET) |
|
|
||||||
| OQI-004 (Investment) | 0 | 0 | 0 | 0 | PENDIENTE |
|
|
||||||
| OQI-005 (Payments) | 0 | 0 | 0 | 0 | PENDIENTE |
|
|
||||||
| OQI-006 (ML) | 0 | 0 | 0 | 0 | PENDIENTE |
|
|
||||||
| OQI-007 (LLM) | 0 | 0 | 0 | 0 | PENDIENTE |
|
|
||||||
| OQI-008 (Portfolio) | 0 | 0 | 0 | 0 | PENDIENTE |
|
|
||||||
|
|
||||||
**Total procesados:** ~67 archivos
|
|
||||||
**Total pendientes:** ~120 archivos
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## ETAPA 3: DoR/DoD - COMPLETADA
|
|
||||||
|
|
||||||
Los archivos de Definition of Ready y Definition of Done han sido creados basados en el estandar de gamilit.
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Commits Pendientes
|
|
||||||
|
|
||||||
Los siguientes commits deben realizarse manualmente:
|
|
||||||
|
|
||||||
### Commit 1: Infraestructura SCRUM
|
|
||||||
```bash
|
|
||||||
git add AGENTS.md docs/planning/ docs/04-fase-backlog/
|
|
||||||
git commit -m "feat(docs): Add SCRUM infrastructure - GAMILIT standard
|
|
||||||
|
|
||||||
ETAPA 1 - Infraestructura SCRUM:
|
|
||||||
- Add AGENTS.md (AI agent guide for trading-platform)
|
|
||||||
- Create docs/planning/Board.md (Kanban board)
|
|
||||||
- Create docs/planning/config.yml (project configuration)
|
|
||||||
- Create docs/04-fase-backlog/ with DoR/DoD
|
|
||||||
|
|
||||||
🤖 Generated with [Claude Code](https://claude.com/claude-code)
|
|
||||||
|
|
||||||
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>"
|
|
||||||
```
|
|
||||||
|
|
||||||
### Commit 2: YAML Front-Matter OQI-001
|
|
||||||
```bash
|
|
||||||
git add docs/02-definicion-modulos/OQI-001-fundamentos-auth/
|
|
||||||
git commit -m "feat(docs): Add YAML front-matter to OQI-001 Auth module
|
|
||||||
|
|
||||||
Add standardized YAML front-matter to:
|
|
||||||
- 12 User Stories (US-AUTH-*)
|
|
||||||
- 5 Requirements (RF-AUTH-*)
|
|
||||||
- 5 Specifications (ET-AUTH-*)
|
|
||||||
|
|
||||||
🤖 Generated with [Claude Code](https://claude.com/claude-code)
|
|
||||||
|
|
||||||
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>"
|
|
||||||
```
|
|
||||||
|
|
||||||
### Commit 3: YAML Front-Matter OQI-002
|
|
||||||
```bash
|
|
||||||
git add docs/02-definicion-modulos/OQI-002-education/
|
|
||||||
git commit -m "feat(docs): Add YAML front-matter to OQI-002 Education module
|
|
||||||
|
|
||||||
Add standardized YAML front-matter to:
|
|
||||||
- 8 User Stories (US-EDU-*)
|
|
||||||
- 6 Requirements (RF-EDU-*)
|
|
||||||
- 6 Specifications (ET-EDU-*)
|
|
||||||
|
|
||||||
🤖 Generated with [Claude Code](https://claude.com/claude-code)
|
|
||||||
|
|
||||||
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>"
|
|
||||||
```
|
|
||||||
|
|
||||||
### Commit 4: YAML Front-Matter OQI-003
|
|
||||||
```bash
|
|
||||||
git add docs/02-definicion-modulos/OQI-003-trading-charts/
|
|
||||||
git commit -m "feat(docs): Add YAML front-matter to OQI-003 Trading module
|
|
||||||
|
|
||||||
Add standardized YAML front-matter to:
|
|
||||||
- 18 User Stories (US-TRD-*)
|
|
||||||
- 7 Requirements (RF-TRD-*)
|
|
||||||
- 1 Specification (ET-TRD-001)
|
|
||||||
|
|
||||||
Note: Remaining ET-TRD-* files pending
|
|
||||||
|
|
||||||
🤖 Generated with [Claude Code](https://claude.com/claude-code)
|
|
||||||
|
|
||||||
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>"
|
|
||||||
```
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Trabajo Pendiente
|
|
||||||
|
|
||||||
Para completar la reestructuracion, se deben procesar los siguientes modulos:
|
|
||||||
|
|
||||||
1. **OQI-003 (Trading):** Completar especificaciones tecnicas (ET-TRD-002 a ET-TRD-008)
|
|
||||||
2. **OQI-004 (Investment):** Procesar todos los archivos US/RF/ET
|
|
||||||
3. **OQI-005 (Payments):** Procesar todos los archivos US/RF/ET
|
|
||||||
4. **OQI-006 (ML Signals):** Procesar todos los archivos US/RF/ET
|
|
||||||
5. **OQI-007 (LLM Agent):** Procesar todos los archivos US/RF/ET
|
|
||||||
6. **OQI-008 (Portfolio):** Procesar todos los archivos US/RF/ET
|
|
||||||
|
|
||||||
### Template YAML para User Story
|
|
||||||
```yaml
|
|
||||||
---
|
|
||||||
id: "US-XXX-NNN"
|
|
||||||
title: "Titulo de la Historia"
|
|
||||||
type: "User Story"
|
|
||||||
status: "Done"
|
|
||||||
priority: "Alta"
|
|
||||||
epic: "OQI-NNN"
|
|
||||||
story_points: N
|
|
||||||
created_date: "2025-12-05"
|
|
||||||
updated_date: "2026-01-04"
|
|
||||||
---
|
|
||||||
```
|
|
||||||
|
|
||||||
### Template YAML para Requirement
|
|
||||||
```yaml
|
|
||||||
---
|
|
||||||
id: "RF-XXX-NNN"
|
|
||||||
title: "Titulo del Requerimiento"
|
|
||||||
type: "Requirement"
|
|
||||||
status: "Done"
|
|
||||||
priority: "Alta"
|
|
||||||
module: "modulo"
|
|
||||||
epic: "OQI-NNN"
|
|
||||||
version: "1.0"
|
|
||||||
created_date: "2025-12-05"
|
|
||||||
updated_date: "2026-01-04"
|
|
||||||
---
|
|
||||||
```
|
|
||||||
|
|
||||||
### Template YAML para Specification
|
|
||||||
```yaml
|
|
||||||
---
|
|
||||||
id: "ET-XXX-NNN"
|
|
||||||
title: "Titulo de la Especificacion"
|
|
||||||
type: "Specification"
|
|
||||||
status: "Done"
|
|
||||||
rf_parent: "RF-XXX-NNN"
|
|
||||||
epic: "OQI-NNN"
|
|
||||||
version: "1.0"
|
|
||||||
created_date: "2025-12-05"
|
|
||||||
updated_date: "2026-01-04"
|
|
||||||
---
|
|
||||||
```
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Notas
|
|
||||||
|
|
||||||
- El contenido existente de los archivos NO fue modificado
|
|
||||||
- Solo se agrego YAML front-matter al inicio de cada archivo
|
|
||||||
- Se mantiene la estructura de carpetas original (02-definicion-modulos/ con OQI-001 a OQI-008)
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
**Generado por:** Claude Opus 4.5
|
|
||||||
**Fecha:** 2026-01-04
|
|
||||||
@ -1,186 +0,0 @@
|
|||||||
# Configuracion del Sistema de Planificacion Trading Platform (Trading Platform)
|
|
||||||
# Basado en: Estandar-SCRUM.md (Principio SIMCO)
|
|
||||||
# Version: 1.0
|
|
||||||
# Fecha: 2026-01-04
|
|
||||||
|
|
||||||
project:
|
|
||||||
name: "Trading Platform"
|
|
||||||
description: "Plataforma de Trading con IA - Trading Platform"
|
|
||||||
version: "1.0.0"
|
|
||||||
repository: "trading-platform"
|
|
||||||
|
|
||||||
# Estados validos para elementos de trabajo
|
|
||||||
states:
|
|
||||||
user_story:
|
|
||||||
- "Backlog"
|
|
||||||
- "To Do"
|
|
||||||
- "In Progress"
|
|
||||||
- "In Review"
|
|
||||||
- "Done"
|
|
||||||
task:
|
|
||||||
- "To Do"
|
|
||||||
- "In Progress"
|
|
||||||
- "Blocked"
|
|
||||||
- "Done"
|
|
||||||
bug:
|
|
||||||
- "Open"
|
|
||||||
- "In Progress"
|
|
||||||
- "Fixed"
|
|
||||||
- "Done"
|
|
||||||
- "Won't Fix"
|
|
||||||
|
|
||||||
# Prioridades
|
|
||||||
priorities:
|
|
||||||
- id: "P0"
|
|
||||||
name: "Critico"
|
|
||||||
description: "Bloqueante para produccion o seguridad"
|
|
||||||
sla_hours: 4
|
|
||||||
- id: "P1"
|
|
||||||
name: "Alto"
|
|
||||||
description: "Funcionalidad core, deadline cercano"
|
|
||||||
sla_hours: 24
|
|
||||||
- id: "P2"
|
|
||||||
name: "Medio"
|
|
||||||
description: "Mejoras importantes, puede esperar"
|
|
||||||
sla_hours: 72
|
|
||||||
- id: "P3"
|
|
||||||
name: "Bajo"
|
|
||||||
description: "Nice-to-have, mejoras menores"
|
|
||||||
sla_hours: null
|
|
||||||
|
|
||||||
# Prefijos de nomenclatura
|
|
||||||
naming:
|
|
||||||
epic_prefix: "OQI"
|
|
||||||
user_story: "US"
|
|
||||||
task: "TASK"
|
|
||||||
bug: "BUG"
|
|
||||||
requirement: "RF"
|
|
||||||
specification: "ET"
|
|
||||||
adr: "ADR"
|
|
||||||
|
|
||||||
# Subcategorias de User Stories por modulo
|
|
||||||
us_categories:
|
|
||||||
- prefix: "AUTH"
|
|
||||||
epic: "OQI-001"
|
|
||||||
description: "Autenticacion"
|
|
||||||
- prefix: "EDU"
|
|
||||||
epic: "OQI-002"
|
|
||||||
description: "Educacion"
|
|
||||||
- prefix: "TRD"
|
|
||||||
epic: "OQI-003"
|
|
||||||
description: "Trading Charts"
|
|
||||||
- prefix: "INV"
|
|
||||||
epic: "OQI-004"
|
|
||||||
description: "Investment Accounts"
|
|
||||||
- prefix: "PAY"
|
|
||||||
epic: "OQI-005"
|
|
||||||
description: "Payments Stripe"
|
|
||||||
- prefix: "ML"
|
|
||||||
epic: "OQI-006"
|
|
||||||
description: "ML Signals"
|
|
||||||
- prefix: "LLM"
|
|
||||||
epic: "OQI-007"
|
|
||||||
description: "LLM Agent"
|
|
||||||
- prefix: "PFM"
|
|
||||||
epic: "OQI-008"
|
|
||||||
description: "Portfolio Manager"
|
|
||||||
|
|
||||||
# Configuracion de sprints
|
|
||||||
sprint:
|
|
||||||
duration_days: 14
|
|
||||||
velocity_target: 40
|
|
||||||
current_sprint: 1
|
|
||||||
current_phase: 1
|
|
||||||
|
|
||||||
# Agentes disponibles
|
|
||||||
agents:
|
|
||||||
- id: "@Backend-Agent"
|
|
||||||
specialization: "Express, PostgreSQL, APIs"
|
|
||||||
- id: "@Frontend-Agent"
|
|
||||||
specialization: "React, TypeScript, UI/UX"
|
|
||||||
- id: "@Database-Agent"
|
|
||||||
specialization: "PostgreSQL, Migrations, Seeds"
|
|
||||||
- id: "@ML-Agent"
|
|
||||||
specialization: "Python, TensorFlow, Trading Signals"
|
|
||||||
- id: "@Integration-Agent"
|
|
||||||
specialization: "Testing, Validacion, CI/CD"
|
|
||||||
- id: "@DevOps-Agent"
|
|
||||||
specialization: "Docker, Kubernetes, Deployment"
|
|
||||||
|
|
||||||
# Columnas del tablero Kanban
|
|
||||||
kanban_columns:
|
|
||||||
- id: "backlog"
|
|
||||||
name: "Backlog"
|
|
||||||
description: "Items no planificados"
|
|
||||||
- id: "todo"
|
|
||||||
name: "Por Hacer"
|
|
||||||
description: "Planificado para sprint actual"
|
|
||||||
- id: "in_progress"
|
|
||||||
name: "En Progreso"
|
|
||||||
description: "Trabajo activo"
|
|
||||||
- id: "blocked"
|
|
||||||
name: "Bloqueado"
|
|
||||||
description: "Esperando dependencias"
|
|
||||||
- id: "review"
|
|
||||||
name: "En Revision"
|
|
||||||
description: "Pendiente de validacion"
|
|
||||||
- id: "done"
|
|
||||||
name: "Hecho"
|
|
||||||
description: "Completado y validado"
|
|
||||||
|
|
||||||
# Campos requeridos por tipo de documento
|
|
||||||
required_fields:
|
|
||||||
user_story:
|
|
||||||
- "id"
|
|
||||||
- "title"
|
|
||||||
- "status"
|
|
||||||
- "epic"
|
|
||||||
- "story_points"
|
|
||||||
task:
|
|
||||||
- "id"
|
|
||||||
- "title"
|
|
||||||
- "status"
|
|
||||||
- "priority"
|
|
||||||
bug:
|
|
||||||
- "id"
|
|
||||||
- "title"
|
|
||||||
- "status"
|
|
||||||
- "severity"
|
|
||||||
- "affected_module"
|
|
||||||
requirement:
|
|
||||||
- "id"
|
|
||||||
- "title"
|
|
||||||
- "status"
|
|
||||||
- "module"
|
|
||||||
specification:
|
|
||||||
- "id"
|
|
||||||
- "title"
|
|
||||||
- "status"
|
|
||||||
- "rf_parent"
|
|
||||||
|
|
||||||
# Rutas importantes
|
|
||||||
paths:
|
|
||||||
planning: "/docs/planning/"
|
|
||||||
tasks: "/docs/planning/tasks/"
|
|
||||||
bugs: "/docs/planning/bugs/"
|
|
||||||
board: "/docs/planning/Board.md"
|
|
||||||
backlog: "/docs/04-fase-backlog/"
|
|
||||||
modules: "/docs/02-definicion-modulos/"
|
|
||||||
adr: "/docs/97-adr/"
|
|
||||||
|
|
||||||
# Metricas del proyecto
|
|
||||||
metrics:
|
|
||||||
total_epics: 8
|
|
||||||
total_user_stories: 90
|
|
||||||
total_requirements: 47
|
|
||||||
total_specifications: 50
|
|
||||||
compliance_target: 100
|
|
||||||
current_compliance: 0
|
|
||||||
|
|
||||||
# Configuracion de validacion
|
|
||||||
validation:
|
|
||||||
require_yaml_frontmatter: true
|
|
||||||
require_acceptance_criteria: true
|
|
||||||
require_story_points: true
|
|
||||||
max_file_lines: 400
|
|
||||||
enforce_naming_convention: true
|
|
||||||
Loading…
Reference in New Issue
Block a user