- FASE-0: Diagnostic audit of 500+ files, 33 findings cataloged (7P0/8P1/12P2/6P3) - FASE-1: Resolved 7 P0 critical conflicts (ports, paths, dedup OQI-010/ADR-002, orphan schemas) - FASE-2: Resolved 8 P1 issues (traces, README/CLAUDE.md, DEPENDENCY-GRAPH v2.0, DDL drift, stack versions, DoR/DoD) - FASE-3: Resolved 12 P2 issues (archived tasks indexed, RNFs created, OQI-010 US/RF/ET, AGENTS v2.0) - FASE-4: Purged 3 obsolete docs to _archive/, fixed MODELO-NEGOCIO.md broken ref - FASE-5: Cross-layer validation (DDL→OQI 66%, OQI→BE 72%, BE→FE 78%, Inventories 95%) - FASE-6: INFORME-FINAL, SA-INDEX (18 subagents), METADATA COMPLETED 27/33 findings resolved (82%), 6 P3 deferred to backlog. 18 new files created, 40+ modified, 4 archived. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
147 lines
5.2 KiB
YAML
147 lines
5.2 KiB
YAML
---
|
|
# METADATA - TASK-2026-02-06-ANALISIS-INTEGRAL-DOCUMENTACION
|
|
version: "1.0.0"
|
|
created: "2026-02-06"
|
|
updated: "2026-02-06"
|
|
system: "SIMCO v4.0.0 + NEXUS v4.0"
|
|
|
|
task:
|
|
id: "TASK-2026-02-06-ANALISIS-INTEGRAL-DOCUMENTACION"
|
|
title: "Analisis Integral de Documentacion - Trading Platform"
|
|
type: "ANALYSIS"
|
|
mode: "@ANALYSIS"
|
|
priority: "CRITICAL"
|
|
status: "COMPLETED"
|
|
phase: "FASE-6 COMPLETED"
|
|
|
|
project:
|
|
name: "trading-platform"
|
|
type: "STANDALONE"
|
|
path: "projects/trading-platform/"
|
|
|
|
scope:
|
|
description: >
|
|
Analisis exhaustivo de toda la documentacion del proyecto trading-platform,
|
|
incluyendo requerimientos, definiciones, estructura, planeacion, trazabilidad,
|
|
coherencia entre capas, y plan de remediacion documental.
|
|
areas:
|
|
- orchestration/ (directivas, inventarios, trazas, tareas, analisis)
|
|
- docs/ (vision, arquitectura, modulos OQI, backlog, ADRs, guias, analisis)
|
|
- Root docs (README.md, CLAUDE.md, AGENTS.md)
|
|
- Inventarios (MASTER, DATABASE, BACKEND, FRONTEND)
|
|
- Trazabilidad (trazas, dependency-graph, context-map)
|
|
- Tareas (activas y archivadas)
|
|
objectives:
|
|
- Detectar incoherencias, duplicados, y documentacion obsoleta
|
|
- Validar metricas y datos cruzados entre documentos
|
|
- Integrar definiciones faltantes (US, RF, ET)
|
|
- Planificar purga documental segura
|
|
- Asegurar trazabilidad completa req->def->impl
|
|
- Corregir conflictos criticos (puertos, paths, IDs)
|
|
- Actualizar inventarios y trazas
|
|
|
|
methodology: "CAPVED"
|
|
phases:
|
|
- id: "FASE-0"
|
|
name: "Diagnostico"
|
|
status: "COMPLETED"
|
|
description: "Reconocimiento y analisis del estado actual"
|
|
deliverables:
|
|
- "ANALISIS-DIAGNOSTICO-COMPLETO.md"
|
|
- "HALLAZGOS-CONSOLIDADOS.yml"
|
|
subagents_used: 4
|
|
|
|
- id: "FASE-1"
|
|
name: "Resolucion Conflictos Criticos (P0)"
|
|
status: "COMPLETED"
|
|
completed_date: "2026-02-06"
|
|
description: "Resolver 7 problemas criticos bloqueantes"
|
|
subtasks: 7
|
|
subtasks_completed: 7
|
|
subagents_used: 1
|
|
files_modified: 12
|
|
summary: "All 7 P0 issues resolved: ports unified, Linux paths fixed, PROJECT-STATUS rewritten, MASTER_INVENTORY synced, OQI-010 dedup, ADR-002 dedup, orphan schemas assigned"
|
|
|
|
- id: "FASE-2"
|
|
name: "Actualizacion Metricas y Datos (P1)"
|
|
status: "COMPLETED"
|
|
completed_date: "2026-02-06"
|
|
description: "Actualizar 8 areas con datos correctos"
|
|
subtasks: 8
|
|
subtasks_completed: 8
|
|
subagents_used: 4
|
|
files_modified: 20+
|
|
summary: "All 8 P1 issues resolved: 3 traces updated, README/CLAUDE.md metrics corrected, DEPENDENCY-GRAPH rebuilt (117→647 lines), OQI-009 progress fixed, DDL drift documented in all 8 OQIs (101/101 tables), stack versions updated, DoR/DoD expanded"
|
|
|
|
- id: "FASE-3"
|
|
name: "Integracion y Consolidacion Documental (P2)"
|
|
status: "COMPLETED"
|
|
completed_date: "2026-02-06"
|
|
description: "Integrar definiciones, consolidar tareas archivadas"
|
|
subtasks: 10
|
|
subtasks_completed: 10
|
|
subagents_used: 4
|
|
files_created: 16
|
|
files_modified: 8
|
|
summary: "11/12 P2 issues resolved: archived tasks indexed (21 classified), deliverables referenced, Curso_Basico relocated, YAML dates synced, timelines 2025→2026, analysis docs classified, 4 RNF docs created, 9 OQI-010 US/RF/ET created, AGENTS.md v2.0.0. P2-009 deferred to FASE-4"
|
|
|
|
- id: "FASE-4"
|
|
name: "Purga Documental"
|
|
status: "COMPLETED"
|
|
completed_date: "2026-02-06"
|
|
description: "Purgar documentos obsoletos/duplicados de forma segura"
|
|
subtasks: 4
|
|
subtasks_completed: 4
|
|
subagents_used: 0
|
|
files_moved: 3
|
|
files_modified: 6
|
|
summary: "3 OBSOLETE docs moved to _archive/ (40.8KB, 1177 lines). P2-009 broken MODELO-NEGOCIO.md ref removed from 2 files. Cross-refs updated in _MAP.md, PLAN-IMPLEMENTACION-CORRECCIONES.md. _archive/README.md v2.0.0"
|
|
|
|
- id: "FASE-5"
|
|
name: "Validacion de Coherencia"
|
|
status: "COMPLETED"
|
|
completed_date: "2026-02-06"
|
|
description: "Validar coherencia cross-layer completa"
|
|
subtasks: 4
|
|
subtasks_completed: 4
|
|
subagents_used: 4
|
|
files_created: 1
|
|
files_modified: 1
|
|
summary: "Cross-layer validation: DDL→OQI 66% (gaps known from TASK-2026-02-05), OQI→Backend 72% (investment 0 controllers = P0), Backend→Frontend 78% (76 orphaned endpoints), Inventories 95% (A-). MASTER_INVENTORY module count fixed 18→19. 6 new findings (1 P0, 2 P1, 3 P2). Validation report created"
|
|
|
|
- id: "FASE-6"
|
|
name: "Documentacion y Cierre"
|
|
status: "COMPLETED"
|
|
completed_date: "2026-02-06"
|
|
description: "Inventarios finales, informe, commit+push"
|
|
subtasks: 4
|
|
subtasks_completed: 4
|
|
subagents_used: 0
|
|
files_created: 2
|
|
summary: "INFORME-FINAL.md created, METADATA set to COMPLETED, SA-INDEX finalized with FASE-5+6, commit+push"
|
|
|
|
metrics:
|
|
files_analyzed: 500+
|
|
issues_found:
|
|
total: 85+
|
|
p0_critical: 7
|
|
p1_high: 8
|
|
p2_medium: 12
|
|
p3_low: 6
|
|
documents_audited:
|
|
orchestration: 9
|
|
oqi_modules: 11
|
|
inventories: 5
|
|
trazas: 3
|
|
active_tasks: 11
|
|
archived_tasks: 22
|
|
docs_directory: 64
|
|
subagents:
|
|
fase0: 4
|
|
total_planned: 20+
|
|
|
|
agent:
|
|
role: "Arquitecto de Documentacion / Orquestador Principal"
|
|
model: "claude-opus-4-6"
|
|
subagent_model: "claude-sonnet-4-5"
|