workspace-v1/projects/gamilit/docs/03-fase-extensiones/EXT-005-reportes/implementacion/TRACEABILITY.yml
Adrian Flores Cortes 967ab360bb Initial commit: Workspace v1 with 3-layer architecture
Structure:
- control-plane/: Registries, SIMCO directives, CI/CD templates
- projects/: Gamilit, ERP-Suite, Trading-Platform, Betting-Analytics
- shared/: Libs catalog, knowledge-base

Key features:
- Centralized port, domain, database, and service registries
- 23 SIMCO directives + 6 fundamental principles
- NEXUS agent profiles with delegation rules
- Validation scripts for workspace integrity
- Dockerfiles for all services
- Path aliases for quick reference

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2025-12-23 00:35:19 -06:00

75 lines
2.1 KiB
YAML

# TRACEABILITY.yml - EXT-005: Reportes
epic_code: EXT-005
epic_name: Reportería Avanzada
phase: 3
budget_mxn: 12000
story_points: 50
status: completed
implementation:
database:
tables:
- name: reports_templates
type: new
description: Templates de reportes custom
- name: report_schedules
type: new
description: Reportes programados
views:
- student_progress_summary (materialized)
- classroom_engagement_metrics (materialized)
- achievement_distribution (regular)
backend:
module: reports
services:
- report-builder.service.ts
- report-export.service.ts (PDF, CSV, XLSX)
- report-scheduler.service.ts
- chart-data.service.ts
endpoints:
- GET /api/v1/reports/templates
- POST /api/v1/reports/generate
- POST /api/v1/reports/export/:format
- POST /api/v1/reports/schedule
frontend:
components:
- ReportBuilder.tsx
- ReportTemplates.tsx
- ChartRenderer.tsx
- ExportPanel.tsx
- SchedulerConfig.tsx
metrics:
avg_generation_time_seconds: 3.5
export_success_rate: 98%
# ============================================================================
# TESTING
# ============================================================================
testing:
coverage:
overall: 12% # REAL (actualizado 2025-11-23)
backend: 15% # REAL (actualizado 2025-11-23)
frontend: 8% # REAL (actualizado 2025-11-23)
database: 0% # REAL (actualizado 2025-11-23)
meta_original: 90% # Estimación inicial del proyecto
gap_actual: -78% # Diferencia entre meta y realidad
ultima_medicion: "2025-11-23"
nota: |
Coverage REAL actualizado por Architecture-Analyst (2025-11-23).
Valores previos eran ESTIMACIONES optimistas del inicio del proyecto.
Sistema de reportes funcional con alta tasa de éxito, pero pocos tests.
Gap actual requiere plan de mejora (ver orchestration/roadmap/ROADMAP-TEST-COVERAGE.md).
Próxima medición: Mensual (Q1 2026).
status:
completion: 100%
completion_date: "2024-11-15"