workspace/projects/gamilit/docs/00-vision-general/migracion
rckrdmrd 608e1e2a2e
Some checks are pending
CI Pipeline / changes (push) Waiting to run
CI Pipeline / core (push) Blocked by required conditions
CI Pipeline / trading-backend (push) Blocked by required conditions
CI Pipeline / trading-data-service (push) Blocked by required conditions
CI Pipeline / trading-frontend (push) Blocked by required conditions
CI Pipeline / erp-core (push) Blocked by required conditions
CI Pipeline / erp-mecanicas (push) Blocked by required conditions
CI Pipeline / gamilit-backend (push) Blocked by required conditions
CI Pipeline / gamilit-frontend (push) Blocked by required conditions
Multi-project update: gamilit, orchestration, trading-platform
Gamilit:
- Backend: Teacher services, assignments, gamification, exercise submissions
- Frontend: Admin/Teacher/Student portals, module 4-5 mechanics, monitoring
- Database: DDL functions, seeds for dev/prod, auth/gamification schemas
- Docs: Architecture, features, guides cleanup and reorganization

Core/Orchestration:
- New workspace directives index
- Documentation directive

Trading-platform:
- Database seeds and inventory updates
- Tech leader validation report

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2025-12-18 07:17:46 -06:00
..
_MAP-FASE-5.md Multi-project update: gamilit, orchestration, trading-platform 2025-12-18 07:17:46 -06:00
README-FASE-5.md feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
README.md feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00

Migracion de Documentacion - Fase 5

Este directorio contiene la documentacion relacionada con la migracion de documentacion del proyecto GAMILIT (Sistema SIMCO).

Archivos

  • README-FASE-5.md - Descripcion de la Fase 5 de migracion
  • _MAP-FASE-5.md - Mapa de navegacion de la Fase 5

Contexto

La "Fase 5" se refiere a la consolidacion de guias de desarrollo, referencias rapidas, ADRs y estandares del proyecto.

Las carpetas incluidas en Fase 5:

  • 00-vision-general/
  • 95-guias-desarrollo/
  • 96-quick-reference/
  • 97-adr/
  • 98-standards/

Ultima actualizacion: 2025-11-29