workspace/projects/gamilit/docs
rckrdmrd 513a86ceee
Some checks are pending
CI Pipeline / changes (push) Waiting to run
CI Pipeline / core (push) Blocked by required conditions
CI Pipeline / trading-backend (push) Blocked by required conditions
CI Pipeline / trading-data-service (push) Blocked by required conditions
CI Pipeline / trading-frontend (push) Blocked by required conditions
CI Pipeline / erp-core (push) Blocked by required conditions
CI Pipeline / erp-mecanicas (push) Blocked by required conditions
CI Pipeline / gamilit-backend (push) Blocked by required conditions
CI Pipeline / gamilit-frontend (push) Blocked by required conditions
Major update: orchestration system, catalog references, and multi-project enhancements
Core:
- Add catalog reference implementations (auth, payments, notifications, websocket, etc.)
- New agent profiles: Database Auditor, Integration Validator, LLM Agent, Policy Auditor, Trading Strategist
- Update SIMCO directives and add escalation/git guidelines
- Add deployment inventory and audit execution reports

Projects:
- erp-suite: DevOps configs, Dockerfiles, shared libs, vertical enhancements
- gamilit: Test structure, admin controllers, service refactoring, husky/commitlint
- trading-platform: MT4 gateway, auth controllers, admin frontend, deployment scripts
- platform_marketing_content: Full DevOps setup, tests, Docker configs
- betting-analytics/inmobiliaria-analytics: Initial app structure

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2025-12-12 22:53:55 -06:00
..
00-vision-general feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
01-fase-alcance-inicial feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
02-fase-robustecimiento feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
03-fase-extensiones feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
04-fase-backlog feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
90-transversal feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
95-guias-desarrollo feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
96-quick-reference feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
97-adr feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
98-standards feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
99-finiquito feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
database feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
frontend/especificaciones feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
sistema-recompensas feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
student-portal feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
API.md Major update: orchestration system, catalog references, and multi-project enhancements 2025-12-12 22:53:55 -06:00
ARCHITECTURE.md Major update: orchestration system, catalog references, and multi-project enhancements 2025-12-12 22:53:55 -06:00
DEPLOYMENT.md Major update: orchestration system, catalog references, and multi-project enhancements 2025-12-12 22:53:55 -06:00
PLAN-REORGANIZACION-DOCUMENTACION-2025-11-29.md feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00
README.md feat: Initial workspace structure with multi-level Git configuration 2025-12-08 10:44:23 -06:00

📚 Documentación del Proyecto GAMILIT

Proyecto: GAMILIT - Plataforma Educativa Gamificada Período: Agosto 2024 - Noviembre 2025 Presupuesto Total: $601,600 MXN (incluye $15,000 USD @ $20/USD) Story Points: 714 SP Estado: 75% Completado (12/16 épicas completas MVP) Última actualización: 2025-11-29


🎯 ALCANCE MVP DEFINIDO

EN ALCANCE MVP

Componente Alcance Estado
Módulos Educativos Módulos 1-3 (15 ejercicios) Implementados
Portal Student 10 páginas funcionales Core completo
Portal Teacher 10 páginas funcionales (US-PM-000 a US-PM-006) Funcional
Portal Admin 7 páginas funcionales (P0+P1: AE-000 a AE-008) Funcional
Épicas MVP EXT-001 a EXT-006 (100%) Completas
Sistema Gamificación Rangos Maya, ML Coins, Achievements v2.3.0
Base de Datos 14 schemas modulares Migrada

RECIENTEMENTE IMPLEMENTADO (2025-11-29)

Componente Descripción Estado
Módulos 4-5 Lectura Digital + Producción (8 ejercicios) Implementados (revisión manual)
Admin P2 US-AE-005, US-AE-007 Implementados

EN BACKLOG (Fuera del MVP)

Componente Descripción Estado
Épicas Parciales EXT-007 a EXT-011 (30-50%) Parciales
10 tipos ejercicios Mecánicas avanzadas Documentados

🗺️ Mapa de Navegación

Documentación Organizada por Fases

El proyecto está documentado en 4 fases consecutivas más carpetas de implementación específica y referencia:

docs/
├── 00-vision-general/           (Referencia - Visión y Arquitectura)
├── 01-fase-alcance-inicial/     (Fase 1 - Fundamentos MVP)
├── 02-fase-robustecimiento/     (Fase 2 - BD Modular MVP)
├── 03-fase-extensiones/         (Fase 3 - Features Enterprise MVP)
├── 04-fase-backlog/             (Fase 4 - ⏳ Backlog Futuro)
├── sistema-recompensas/         (Implementación v2.3.0)
├── student-portal/              (Portal Estudiante)
├── database/                    (Documentación BD)
├── 90-transversal/              (Documentación Transversal)
├── 95-guias-desarrollo/         (Guías de Desarrollo)
├── 96-quick-reference/          (Referencias Rápidas)
├── 97-adr/                      (Architecture Decision Records)
└── 98-standards/                (Estándares del Proyecto)

📂 Fase 1: Alcance Inicial

Duración: Mes 1 (Agosto 2024) Presupuesto: $110,000 MXN Story Points: 230 SP Épicas: 5 completas

📁 01-fase-alcance-inicial/

Objetivo: Establecer fundamentos de la plataforma

Épica Descripción Estado Documentación
EAI-001 Fundamentos (Auth, Infraestructura) 100% 📂
EAI-002 Actividades (6 mecánicas de ejercicios) 100% 📂
EAI-003 Gamificación (XP, ML Coins, Rangos Maya) 100% 📂
EAI-004 Analytics (Métricas básicas) 100% 📂
EAI-005 Admin Base (Panel básico) 100% 📂

Resultados Fase 1:

  • Arquitectura base implementada
  • 6 módulos backend funcionales
  • ~60 componentes frontend
  • 6 schemas de BD
  • ⚠️ Test coverage: 18% (vs 88% objetivo)

📄 Ver detalles completos: Fase 1 README


📂 Fase 2: Robustecimiento y Migración BD

Duración: Mes 2 (Septiembre 2024) Presupuesto: $50,000 MXN Story Points: 80 SP Épicas: 1 técnica

📁 02-fase-robustecimiento/

Objetivo: Transformar BD de plana a modular

Épica Descripción Estado Documentación
EMR-001 Migración BD (1 → 14 schemas) 100% 📂

Transformación realizada:

  • Antes: 1 schema, 44 tablas, estructura plana
  • Después: 14 schemas, 101 tablas, arquitectura modular

Logros destacados:

  • Zero downtime migration (blue-green deployment)
  • Performance +65% mejora
  • 45 políticas RLS implementadas
  • 127 índices estratégicos

Métricas de Performance:

  • Query promedio: 250ms → 87ms (-65%)
  • Joins complejos: 1200ms → 320ms (-73%)
  • Throughput: 100 req/s → 280 req/s (+180%)

📄 Ver detalles completos: Fase 2 README


📂 Fase 3: Extensiones (MVP)

Duración: Mes 3-4 (Octubre-Noviembre 2024) Presupuesto: $141,600 MXN Story Points: 304 SP Épicas MVP: 6 completas

📁 03-fase-extensiones/

Objetivo: Features enterprise-ready para MVP

Épicas MVP (100% Completas)

Épica Descripción Estado Documentación
EXT-001 Portal Maestros (Dashboard completo) 100% 📂
EXT-002 Admin Extendido (Tools avanzadas) 100% 📂
EXT-003 Notificaciones (Multi-canal) 100% 📂
EXT-004 Perfiles Avanzados 100% 📂
EXT-005 Reportería (PDF/Excel) 100% 📂
EXT-006 CMS de Contenido 100% 📂

Resultados Fase 3 MVP:

  • Portal maestros funcional (crítico para adopción institucional)
  • Admin tools enterprise
  • Sistema de notificaciones multi-canal
  • 6/6 épicas MVP completadas

📄 Ver detalles completos: Fase 3 README


📂 Fase 4: Backlog (Fuera del MVP)

Estado: Planificación y Diseño Épicas: 5 parciales (30-50%) Módulos: 2 pendientes (Módulos 4-5)

📁 04-fase-backlog/

Objetivo: Funcionalidad futura diseñada pero no implementada en MVP

Épicas Parciales (Backlog)

Épica Descripción Avance Documentación
EXT-007 LTI Integration 40% 📂
EXT-008 White Label 30% 📂
EXT-009 Peer Challenges 50% 📂
EXT-010 Parent Notifications 35% 📂
EXT-011 Parent Portal 35% 📂

Módulos Educativos M4-M5 (Implementados 2025-11-29)

Módulo Descripción Ejercicios Estado
Módulo 4 Lectura Digital y Multimodal 5 Implementado (revisión manual por docentes)
Módulo 5 Producción y Expresión 3 Implementado (revisión manual por docentes)

Nota: M4-M5 requieren evaluación manual por docentes. Ver ReviewPanel para el panel de revisión.

Admin Portal P2 (Implementado 2025-11-28)

User Story Descripción Estado
US-AE-005 Parametrización Gamificación Implementado
US-AE-007 Asignación de Grupos a Maestros Implementado

Nota: Ver Manual Portal Admin para documentación completa.

📄 Ver detalles completos: Fase 4 README


📂 Sistema de Recompensas (Implementación Detallada)

Versión: v2.3.0 (Noviembre 2025) Épica origen: EAI-003 (Gamificación) Test Coverage: 95% backend, 88% frontend Estado: PRODUCCIÓN

📁 sistema-recompensas/

Objetivo: Documentación exhaustiva de la implementación del sistema de recompensas automatizado

Esta carpeta contiene la implementación v2.3.0 del sistema que gestiona:

  • Cálculo automático de XP y ML Coins
  • Actualización de estadísticas vía trigger de BD
  • Tracking de progreso por módulo
  • Performance optimizado (<200ms)

Documentos clave:

Documento Descripción Completitud
README.md Índice maestro y quick start 100%
00-INVENTARIO-CAMBIOS.md Trazabilidad de 15 archivos 100%
01-ARQUITECTURA-SISTEMA.md 6 patrones de diseño 95%
02-FLUJO-END-TO-END.md 12 pasos + timeline 98%
03-API-ENDPOINTS.md 6 endpoints + JSON 95%
04-DATABASE-SCHEMA.md 3 tablas + SQL trigger 100%
05-TEST-RESULTS.md 10/10 tests passed 98%
06-SEEDS-Y-DATOS-INICIALES.md 10 usuarios demo 95%

Evolución del sistema:

Versión Fecha Performance Test Coverage Bugs
v1.0 Ago 2024 450ms 25% 51 bugs
v2.0 Oct 2024 250ms 45% 24 bugs
v2.3.0 Nov 2025 85ms 95% 9 bugs

Resultados v2.3.0:

  • Performance: -86% vs v1.0
  • Tests: 10/10 passed (100%)
  • Bugs críticos: 0
  • NPS: 85 (Excelente)

🔗 Conexión con EAI-003: Ver: EVOLUCION-SISTEMA-RECOMPENSAS.md


📊 Resumen Consolidado del Proyecto

Cifras Globales MVP

Métrica MVP Backlog Total
Archivos Markdown 145+ 20+ 165+
Épicas Completadas 12 (100%) - 12
Épicas Parciales (Backlog) - 5 (30-50%) 5
Módulos Educativos 3 2 5
Story Points MVP 614 SP 100 SP 714 SP
Schemas BD 14 - 14
Tablas BD 101 - 101
Endpoints API MVP 125+ 20+ 145+
Componentes Frontend 200+ 30+ 230+

Alcance MVP Claro

Componente MVP Backlog
Módulos Educativos M1-M3 (15 ejercicios) M4-M5 (8 ejercicios)
Épicas EXT-001 a EXT-006 EXT-007 a EXT-011
Portal Admin P0+P1 (7 páginas) P2 (2 páginas)
Tipos de Ejercicios 15 mecánicas 10 mecánicas

Estado de Test Coverage

Componente Fase 1 Fase 2 Fase 3 v2.3.0 Sistema Recompensas
Backend 18% ⚠️ N/A 18% ⚠️ 95%
Frontend 18% ⚠️ N/A 18% ⚠️ 88%
BD/Triggers 0% 60% 60% 100%

⚠️ Brecha Crítica: Test coverage general 18% vs 88% objetivo (-70%)


🎯 Métricas de Éxito

Completitud de Funcionalidades

Categoría Completo Parcial Pendiente Total
Autenticación 100% - - 1/1
Contenido Educativo 100% - - 1/1
Gamificación 100% - - 1/1
Analytics 100% - - 1/1
Admin Tools 100% - - 2/2
Portal Maestros 100% - - 1/1
Notificaciones 100% - - 1/1
Reportería 100% - - 1/1
CMS 100% - - 1/1
Perfiles 100% - - 1/1
BD Modular 100% - - 1/1
LTI Integration - 🟡 40% - 0/1
White Label - 🟡 30% - 0/1
Peer Challenges - 🟡 50% - 0/1
Parent Portal - 🟡 35% - 0/1
TOTAL 12 4 0 16

Completitud Global: 75% completas + 25% parciales = 87.5% del proyecto


🔍 Hallazgos y Recomendaciones

Fortalezas de la Documentación

  1. Estructura Modular Consistente - Fácil navegación
  2. Trazabilidad Completa - De requerimientos a implementación
  3. Documentación Técnica Exhaustiva - BD, APIs, componentes
  4. Narrativas Claras - Historias de usuario bien escritas
  5. Índices Maestros - _MAP.md en cada épica
  6. Métricas Documentadas - Presupuesto, SP, varianzas
  7. Lessons Learned - Reflexiones post-sprint

⚠️ Áreas de Mejora Identificadas

1. 🔴 CRÍTICO: Brecha de Test Coverage

Problema: Gap masivo entre estimado y real

  • Fase 1: 88% estimado → 18% real (-70%)
  • Fase 3: 92% estimado → 18% real (-74%)
  • Solo 2 tests de 320 planificados

Impacto: Deuda técnica crítica, riesgo de regresiones

Recomendación: Plan de testing urgente (2 sprints dedicados)

2. 🟡 MEDIO: Épicas Parciales Sin Roadmap

Problema: 4 épicas al 30-50% sin plan de completitud

  • EXT-007: LTI Integration (40%)
  • EXT-008: White Label (30%)
  • EXT-009: Peer Challenges (50%)
  • EXT-010: Parent Portal (35%)

Recomendación: Roadmap Q1 2025 con recursos asignados

3. 🟡 MEDIO: Documentación Operacional Faltante

Problema: Sin runbooks, troubleshooting, scaling procedures

Recomendación: Crear guías operacionales antes de producción

4. 🟡 MEDIO: Políticas RLS No Documentadas

Problema: 45 políticas sin detalle específico por tabla

Recomendación: Matriz de permisos por rol y tabla


🚀 Próximos Pasos

Corto Plazo (1-2 semanas)

  1. 🔴 Plan de Testing

    • Roadmap de 18% → 80%
    • Priorizar módulos críticos
    • 2 sprints dedicados
  2. 🔴 Consolidar Inventario BD

    • Auditoría completa de tablas
    • Validar vs producción
  3. 🟡 Documentar RLS

    • Listar políticas por tabla
    • Matriz de permisos

Mediano Plazo (1 mes)

  1. 🟡 Roadmap Épicas Parciales

    • Q1 2025 para completar 4 épicas
    • Recursos y dependencias
  2. 🟡 Runbooks Operacionales

    • Troubleshooting
    • Scaling
    • Rollback plans

Largo Plazo (2-3 meses)

  1. Performance Baselines

    • SLOs/SLAs
    • Monitoring y alertas
  2. Matriz de Dependencias

    • Grafo de épicas
    • Facilitar planificación

📚 Navegación Rápida por Tema

Por Dominio Funcional

Autenticación & Autorización

Contenido Educativo

Gamificación

Analytics & Reportes

Administración

Portal Maestros

Infraestructura

Comunicaciones

Perfiles de Usuario

Integraciones (Parciales)

Social Features (Parciales)


🏗️ Arquitectura del Proyecto

Stack Tecnológico

Backend:

  • NestJS (Node.js + TypeScript)
  • 20 módulos
  • 125+ endpoints REST
  • JWT Authentication
  • OAuth (5 proveedores)

Frontend:

  • React 18 + TypeScript
  • Zustand (state management)
  • 200+ componentes
  • Vite (build tool)

Base de Datos:

  • PostgreSQL (Supabase)
  • 14 schemas modulares
  • 101 tablas
  • 67 índices
  • 24 políticas RLS
  • 62 funciones
  • 34 triggers

Fuente de métricas BD: Ver inventarios en orchestration/inventarios/ (validación física 2025-11-11)

Testing:

  • Jest (unit tests)
  • Supertest (integration)
  • React Testing Library (frontend)

Schemas de Base de Datos

Schema Tablas Propósito
auth 1 Supabase Auth (sistema)
auth_management 11 Gestión autenticación
educational_content 8 Contenido educativo
gamification_system 12 Gamificación
progress_tracking 10 Tracking progreso
admin_dashboard 6 Dashboard admin
content_management 7 Gestión contenido
social_features 8 Features sociales
storage 5 Archivos
audit_logging 6 Logs auditoría
system_configuration 4 Configuración
lti_integration 5 Integración LTI (EXT-007)
gamilit 10 Schema principal
public 2 Público (mínimo)

📞 Contacto y Soporte

Equipo de Desarrollo:

Documentación:


Última actualización: 2025-11-29 Versión del índice: 1.1 Generado por: Equipo GAMILIT + Claude Code Actualización: Módulos M4-M5 implementados, Admin Portal P2 completado