erp-core/orchestration/analisis/F7-REPORTE-EJECUCION-DOCUMENTACION-2026-01-10.md
rckrdmrd 0086695b4c
Some checks failed
ERP Core CI / Backend Lint (push) Has been cancelled
ERP Core CI / Backend Unit Tests (push) Has been cancelled
ERP Core CI / Backend Integration Tests (push) Has been cancelled
ERP Core CI / Frontend Lint (push) Has been cancelled
ERP Core CI / Frontend Unit Tests (push) Has been cancelled
ERP Core CI / Frontend E2E Tests (push) Has been cancelled
ERP Core CI / Database DDL Validation (push) Has been cancelled
ERP Core CI / Backend Build (push) Has been cancelled
ERP Core CI / Frontend Build (push) Has been cancelled
ERP Core CI / CI Success (push) Has been cancelled
Performance Tests / Lighthouse CI (push) Has been cancelled
Performance Tests / Bundle Size Analysis (push) Has been cancelled
Performance Tests / k6 Load Tests (push) Has been cancelled
Performance Tests / Performance Summary (push) Has been cancelled
[SIMCO-V38] feat: Actualizar a SIMCO v3.8.0 + cambios backend
- HERENCIA-SIMCO.md actualizado con directivas v3.7 y v3.8
- Actualizaciones en modulos CRM y OpenAPI

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-10 08:53:05 -06:00

9.2 KiB

FASE 7: REPORTE DE EJECUCION

Estandarizacion de Documentacion - ERP Core


METADATOS

Campo Valor
Fase 7 - Ejecucion del Plan
Proyecto ERP Core
Fecha Inicio 2026-01-10
Metodologia CAPVED + SIMCO v3.8
Estado EN_PROGRESO

1. RESUMEN DE EJECUCION

1.1 Estado General

PLAN TOTAL:                 7 dias, 105 horas
EJECUTADO:                  En progreso
SPRINTS COMPLETADOS:        0/3 (Sprint 1 en curso)

1.2 Progreso por Sprint

Sprint Estado Tareas Completadas Tareas Pendientes
Sprint 1 (Criticos) EN_PROGRESO 1 17
Sprint 2 (Nomenclatura) PENDIENTE 0 9
Sprint 3 (Mejoras) PENDIENTE 0 8

2. TAREAS COMPLETADAS

2.1 Bloque A: Inventarios

Tarea Archivo Estado Notas
A1 MASTER_INVENTORY.yml COMPLETADO Error YAML corregido (lineas 1053-1105)
A2 BACKEND_INVENTORY.yml PENDIENTE Agregar MGN-005 a MGN-010
A3 FRONTEND_INVENTORY.yml PENDIENTE Agregar MGN-005 a MGN-009
A4 DEPENDENCY_GRAPH.yml PENDIENTE Actualizar (36 dias desactualizado)
A5 TRACEABILITY_MATRIX.yml PENDIENTE Actualizar metricas

Detalle A1:

  • Problema: Mezcla de propiedades escalares y lista en metricas_ddl
  • Solucion: Separar en metricas_ddl (propiedades) y archivos_ddl_extensiones (lista)
  • Validacion: python3 -c "import yaml; yaml.safe_load(open('MASTER_INVENTORY.yml'))" = OK

3. TAREAS PENDIENTES - SPRINT 1

3.1 Bloque A Restante

A2_BACKEND_INVENTORY:
  accion: Agregar secciones para MGN-005 a MGN-010
  esfuerzo: 2h
  prioridad: ALTA

A3_FRONTEND_INVENTORY:
  accion: Agregar secciones para MGN-005 a MGN-009
  esfuerzo: 2h
  prioridad: ALTA

A4_DEPENDENCY_GRAPH:
  accion: Actualizar modulos y dependencias
  esfuerzo: 1.5h
  prioridad: ALTA

A5_TRACEABILITY_MATRIX:
  accion: Actualizar test_coverage (0% → ~82%), sprints
  esfuerzo: 1.5h
  prioridad: ALTA

3.2 Bloque B: ET Existentes

B1_ET_AUTH:
  archivo: docs/01-fase-foundation/MGN-001-auth/especificaciones/ET-auth-backend.md
  accion: Agregar 6 servicios nuevos (mfa, trusted-devices, email-verification, permission-cache, apiKeys, oauth)
  esfuerzo: 4h
  prioridad: ALTA

B2_ET_FIN:
  archivo: docs/02-fase-core-business/MGN-010-financial/especificaciones/ET-FIN-backend.md
  accion: Agregar 8 servicios nuevos (invoices, payments, payment-methods, payment-terms, journal-entries, reconcile-models, taxes, incoterms)
  esfuerzo: 5h
  prioridad: ALTA

3.3 Bloque C: ET Verticales (Crear nuevas)

Tarea Modulo Servicios Archivo a Crear
C1 MGN-011 Sales 5 docs/03-fase-vertical/MGN-011-sales/especificaciones/ET-SALES-backend.md
C2 MGN-012 Purchases 2 docs/03-fase-vertical/MGN-012-purchases/especificaciones/ET-PURCHASES-backend.md
C3 MGN-013 Inventory 9 docs/03-fase-vertical/MGN-013-inventory/especificaciones/ET-INVENTORY-backend.md
C4 MGN-014 HR 7 docs/03-fase-vertical/MGN-014-hr/especificaciones/ET-HR-backend.md
C5 MGN-015 CRM 4 docs/03-fase-vertical/MGN-015-crm/especificaciones/ET-CRM-backend.md
C6 MGN-016 Projects 3 docs/03-fase-vertical/MGN-016-projects/especificaciones/ET-PROJECTS-backend.md
C7 MGN-017 Partners 2 docs/03-fase-vertical/MGN-017-partners/especificaciones/ET-PARTNERS-backend.md
C8 MGN-018 Companies 1 docs/03-fase-vertical/MGN-018-companies/especificaciones/ET-COMPANIES-backend.md

4. TAREAS PENDIENTES - SPRINT 2

4.1 Bloque D: Nomenclatura

Tarea Descripcion Archivos Esfuerzo
D1 Renombrar FASE-X 30 1.5h
D2 Normalizar ET UPPERCASE 8 0.5h
D3 Estandarizar DDL-SPEC 25 1.5h
D4 Numerar directorios 59 2h
D5 Prefijos restantes 96 3h

4.2 Bloque E: Estructura

Tarea Descripcion Esfuerzo
E1 Mover archivos huerfanos 1h
E2 Crear _MAP.md por fase 1h
E3 Verificar estructura modulos 1h
E4 Sincronizar conteos inventarios 1h

4.3 Bloque F: Sincronizacion

Tarea Descripcion Esfuerzo
F3 Verificar DDL vs ORM 3h

5. TAREAS PENDIENTES - SPRINT 3

5.1 Bloque G: Mejoras

Tarea Descripcion Esfuerzo
G1 Documentar integraciones (Stripe, OAuth, Email, WebSocket) 3h
G2 Prefijo REF- archivos referencia 0.5h
G3 Indices tematicos 1.5h
G4 Script validacion cruzada 2h
G5-G8 Tareas menores 2h

6. TEMPLATE PARA ET VERTICALES

El siguiente template debe usarse para crear las ET de los modulos verticales (C1-C8):

# ET-{MODULO}-BACKEND
# Especificacion Tecnica Backend - {Nombre Modulo}

---

## METADATOS

| Campo | Valor |
|-------|-------|
| **Modulo** | MGN-0XX |
| **Version** | 1.0.0 |
| **Fecha** | 2026-01-10 |
| **Estado** | Borrador |
| **Autor** | Claude Code |

---

## 1. SERVICIOS

### 1.1 {nombre}.service.ts

**Ubicacion:** `/backend/src/modules/{modulo}/{nombre}.service.ts`

**Metodos:**
| Metodo | Descripcion | Parametros | Retorno |
|--------|-------------|------------|---------|
| findAll() | Listar todos | filters: FilterDto | Promise<Entity[]> |
| findOne(id) | Buscar por ID | id: string | Promise<Entity> |
| create(dto) | Crear nuevo | dto: CreateDto | Promise<Entity> |
| update(id, dto) | Actualizar | id: string, dto: UpdateDto | Promise<Entity> |
| remove(id) | Eliminar | id: string | Promise<void> |

---

## 2. ENTIDADES

### 2.1 {nombre}.entity.ts

**Ubicacion:** `/backend/src/modules/{modulo}/entities/{nombre}.entity.ts`

**Columnas:**
| Campo | Tipo | Nullable | Descripcion |
|-------|------|----------|-------------|
| id | uuid | NO | Primary key |
| tenant_id | uuid | NO | FK a tenants |
| name | varchar(255) | NO | Nombre |
| created_at | timestamptz | NO | Fecha creacion |
| updated_at | timestamptz | NO | Fecha actualizacion |

---

## 3. DTOs

### 3.1 Create{Nombre}Dto
### 3.2 Update{Nombre}Dto
### 3.3 {Nombre}ResponseDto

---

## 4. ENDPOINTS

| Metodo | Ruta | Descripcion | Auth |
|--------|------|-------------|------|
| GET | /{modulo} | Listar | JWT |
| GET | /{modulo}/:id | Obtener por ID | JWT |
| POST | /{modulo} | Crear | JWT + RBAC |
| PATCH | /{modulo}/:id | Actualizar | JWT + RBAC |
| DELETE | /{modulo}/:id | Eliminar | JWT + RBAC |

---

## 5. TESTS

**Ubicacion:** `/backend/src/modules/{modulo}/__tests__/{nombre}.service.spec.ts`

| Test | Descripcion | Estado |
|------|-------------|--------|
| findAll | Listar todos | PENDIENTE |
| findOne | Buscar por ID | PENDIENTE |
| create | Crear nuevo | PENDIENTE |
| update | Actualizar | PENDIENTE |
| remove | Eliminar | PENDIENTE |

---

## 6. DEPENDENCIAS

| Modulo | Tipo | Descripcion |
|--------|------|-------------|
| auth | Hard | Autenticacion requerida |
| tenants | Hard | Multi-tenant obligatorio |

---

7. INSTRUCCIONES PARA CONTINUAR

7.1 Para completar Sprint 1 Bloque B (ET existentes)

  1. Leer archivo ET actual
  2. Identificar servicios faltantes vs codigo backend
  3. Agregar seccion por cada servicio nuevo
  4. Documentar entidades, DTOs y endpoints

7.2 Para completar Sprint 1 Bloque C (ET verticales)

  1. Crear directorio si no existe: docs/03-fase-vertical/MGN-0XX-{modulo}/especificaciones/
  2. Usar template de seccion 6
  3. Listar servicios del backend: ls backend/src/modules/{modulo}/*.service.ts
  4. Documentar cada servicio con metodos, entidades, DTOs

7.3 Para completar Sprint 2 Bloque D (Nomenclatura)

# D1: Renombrar FASE-X
cd /home/isem/workspace-v1/projects/erp-core/orchestration
for f in */FASE-*.md; do
  nuevo=$(echo $f | sed 's/FASE-[0-9]-//')
  mv "$f" "$nuevo"
done

# D2: Normalizar ET UPPERCASE
cd /home/isem/workspace-v1/projects/erp-core/docs
find . -name "ET-*-backend.md" -exec bash -c 'mv "$0" "$(echo $0 | tr a-z A-Z)"' {} \;

8. METRICAS DE PROGRESO

8.1 Actual vs Meta

Metrica Antes Actual Meta
Inventarios validos 5/6 6/6 6/6
Modulos con ET 10/18 10/18 18/18
Nomenclatura conforme 77% 77% 95%
Sync Codigo-Docs 40% 40% 85%

8.2 Progreso por Bloque

BLOQUE A: [#---------] 20% (1/5)
BLOQUE B: [----------] 0% (0/2)
BLOQUE C: [----------] 0% (0/8)
BLOQUE D: [----------] 0% (0/5)
BLOQUE E: [----------] 0% (0/4)
BLOQUE F: [----------] 0% (0/1)
BLOQUE G: [----------] 0% (0/5)

9. PROXIMOS PASOS INMEDIATOS

  1. Completar Bloque A: Actualizar inventarios restantes (A2-A5)
  2. Ejecutar Bloque B: Actualizar ET-auth y ET-FIN
  3. Ejecutar Bloque C: Crear 8 ET verticales usando template
  4. Continuar con Sprint 2: Nomenclatura y estructura

10. NOTAS

  • El plan esta disenado para ejecucion en 7 dias
  • La paralelizacion permite acelerar con multiples agentes
  • Los templates reducen significativamente el tiempo de creacion
  • Se recomienda validar YAML despues de cada cambio a inventarios

Reporte de ejecucion generado: 2026-01-10 Estado: EN_PROGRESO - Sprint 1 Bloque A parcialmente completado