Some checks are pending
CI/CD Pipeline / Backend CI (push) Waiting to run
CI/CD Pipeline / Frontend CI (push) Waiting to run
CI/CD Pipeline / WhatsApp Service CI (push) Waiting to run
CI/CD Pipeline / Mobile CI (push) Waiting to run
CI/CD Pipeline / Docker Build (./apps/backend, ./apps/backend/Dockerfile, backend) (push) Blocked by required conditions
CI/CD Pipeline / Docker Build (./apps/frontend, ./apps/frontend/Dockerfile, frontend) (push) Blocked by required conditions
CI/CD Pipeline / Docker Build (./apps/whatsapp-service, ./apps/whatsapp-service/Dockerfile, whatsapp-service) (push) Blocked by required conditions
CI/CD Pipeline / Deploy to Production (push) Blocked by required conditions
- Move 7 non-standard folders to _archive/ - Archive 3 extra root files - Update _MAP.md with standardized structure Standard: SIMCO-ESTANDAR-ORCHESTRATION v1.0.0 Level: CONSUMER (L2) Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
218 lines
7.0 KiB
Markdown
218 lines
7.0 KiB
Markdown
# VALIDACION DEL PLAN DE PURGA DOCUMENTAL
|
|
|
|
**Proyecto:** MiChangarrito
|
|
**Fecha:** 2026-01-10
|
|
**Proposito:** Verificar que el plan de ejecucion cubre todos los hallazgos del analisis
|
|
|
|
---
|
|
|
|
## 1. MATRIZ DE COBERTURA: HALLAZGOS vs TAREAS
|
|
|
|
### 1.1 Discrepancias Especificaciones (T-001)
|
|
|
|
| Hallazgo | Tarea Asignada | Cubierto |
|
|
|----------|----------------|----------|
|
|
| 5 archivos listados que NO existen | Tarea 3.1 (Actualizar _MAP.md) | PASS |
|
|
| 5 archivos reales NO listados | Tarea 3.1 (Actualizar _MAP.md) | PASS |
|
|
| INTEGRACIONES-PAGOS vs INTEGRACIONES-EXTERNAS | Tarea 3.1 (Actualizar _MAP.md) | PASS |
|
|
| CALCULADORA-CAMBIO.md faltante | Tarea 4.1 (Crear documento) | PASS |
|
|
| Contenido distribuido sin consolidar | Tarea 4.2 (Crear INDICE-ARQUITECTURA) | PASS |
|
|
|
|
**Cobertura T-001:** 5/5 = **100%**
|
|
|
|
---
|
|
|
|
### 1.2 Duplicados de Arquitectura (T-002)
|
|
|
|
| Hallazgo | Tarea Asignada | Cubierto |
|
|
|----------|----------------|----------|
|
|
| ARQUITECTURA-DATABASE.md duplicado en 90-transversal | Tarea 2.1, 2.2 (Extraer y eliminar) | PASS |
|
|
| Conflicto: 8 vs 9 schemas | Tarea 3.3 (Actualizar ARQUITECTURA-TECNICA) | PASS |
|
|
| Conflicto: Nombres servicios WA | Tarea 3.4 (Documentar credenciales) | PASS |
|
|
| Almacenamiento credenciales ambiguo | Tarea 3.4 (Documentar credenciales) | PASS |
|
|
| 41% contenido duplicado general | Tareas 2.1, 2.2, 3.4 | PASS |
|
|
|
|
**Cobertura T-002:** 5/5 = **100%**
|
|
|
|
---
|
|
|
|
### 1.3 Coherencia de Epicas (T-003)
|
|
|
|
| Hallazgo | Tarea Asignada | Cubierto |
|
|
|----------|----------------|----------|
|
|
| IDs desplazados MCH-012 a MCH-021 | Tarea 3.2 (Actualizar CONTEXT-MAP.yml) | PASS |
|
|
| MCH-022 a MCH-028 faltan en CONTEXT-MAP | Tarea 3.2 (Agregar fase6 y fase7) | PASS |
|
|
| Nombres incompletos (chat-llm vs chat-llm-dueno) | Tarea 3.2 (Corregir nombres) | PASS |
|
|
| 25% epicas con discrepancias | Tarea 3.2 (Correccion completa) | PASS |
|
|
|
|
**Cobertura T-003:** 4/4 = **100%**
|
|
|
|
---
|
|
|
|
### 1.4 Analisis Historicos (T-004)
|
|
|
|
| Hallazgo | Tarea Asignada | Cubierto |
|
|
|----------|----------------|----------|
|
|
| 5 archivos obsoletos a archivar | Tarea 0.2, 1.1 (Crear carpeta y mover) | PASS |
|
|
| 6 archivos vigentes a mantener | No requiere accion (mantener) | PASS |
|
|
| 4 archivos historicos referencia | No requiere accion (mantener) | PASS |
|
|
| Crear resumen consolidado | Tarea 4.3 (RESUMEN-ANALISIS-HISTORICO) | PASS |
|
|
|
|
**Cobertura T-004:** 4/4 = **100%**
|
|
|
|
---
|
|
|
|
## 2. MATRIZ DE COBERTURA: ACCIONES vs TAREAS
|
|
|
|
### 2.1 Acciones ELIMINAR
|
|
|
|
| ID | Archivo | Tarea | Cubierto |
|
|
|----|---------|-------|----------|
|
|
| E-001 | 90-transversal/arquitectura/ARQUITECTURA-DATABASE.md | Tarea 2.2 | PASS |
|
|
|
|
**Cobertura ELIMINAR:** 1/1 = **100%**
|
|
|
|
---
|
|
|
|
### 2.2 Acciones ARCHIVAR
|
|
|
|
| ID | Archivo | Tarea | Cubierto |
|
|
|----|---------|-------|----------|
|
|
| A-001 | ANALISIS-FASE1-2026-01-06.md | Tarea 1.1 | PASS |
|
|
| A-002 | DEPENDENCIAS-ARCHIVOS-2026-01-06.md | Tarea 1.1 | PASS |
|
|
| A-003 | PLAN-FASE2-DETALLADO-2026-01-06.md | Tarea 1.1 | PASS |
|
|
| A-004 | PLAN-REFINADO-FINAL-2026-01-06.md | Tarea 1.1 | PASS |
|
|
| A-005 | VALIDACION-PLAN-VS-ANALISIS-2026-01-06.md | Tarea 1.1 | PASS |
|
|
|
|
**Cobertura ARCHIVAR:** 5/5 = **100%**
|
|
|
|
---
|
|
|
|
### 2.3 Acciones ACTUALIZAR
|
|
|
|
| ID | Archivo | Tarea | Cubierto |
|
|
|----|---------|-------|----------|
|
|
| U-001 | docs/_MAP.md (seccion especificaciones) | Tarea 3.1 | PASS |
|
|
| U-002 | CONTEXT-MAP.yml (epicas MCH-012 a MCH-021) | Tarea 3.2 | PASS |
|
|
| U-003 | CONTEXT-MAP.yml (fase6 y fase7) | Tarea 3.2 | PASS |
|
|
| U-004 | ARQUITECTURA-TECNICA.md (schemas) | Tarea 3.3 | PASS |
|
|
| U-005 | ARQUITECTURA-TECNICA.md (credenciales) | Tarea 3.4 | PASS |
|
|
|
|
**Cobertura ACTUALIZAR:** 5/5 = **100%**
|
|
|
|
---
|
|
|
|
### 2.4 Acciones CREAR
|
|
|
|
| ID | Archivo | Tarea | Cubierto |
|
|
|----|---------|-------|----------|
|
|
| C-001 | CALCULADORA-CAMBIO.md | Tarea 4.1 | PASS |
|
|
| C-002 | INDICE-ARQUITECTURA.md | Tarea 4.2 | PASS |
|
|
| C-003 | orchestration/analisis/historico/ | Tarea 0.2 | PASS |
|
|
| C-004 | RESUMEN-ANALISIS-HISTORICO.md | Tarea 4.3 | PASS |
|
|
|
|
**Cobertura CREAR:** 4/4 = **100%**
|
|
|
|
---
|
|
|
|
### 2.5 Acciones CONSOLIDAR
|
|
|
|
| ID | Documentos | Tarea | Cubierto |
|
|
|----|------------|-------|----------|
|
|
| CO-001 | Fusion ARQUITECTURA-DATABASE | Tarea 2.1 (extraer) + mantener canonico | PASS |
|
|
|
|
**Cobertura CONSOLIDAR:** 1/1 = **100%**
|
|
|
|
---
|
|
|
|
## 3. VALIDACION DE DEPENDENCIAS
|
|
|
|
### Orden de Ejecucion Correcto
|
|
|
|
| Tarea | Depende De | Validado |
|
|
|-------|------------|----------|
|
|
| Tarea 0.1 (Backup) | Ninguna | PASS |
|
|
| Tarea 0.2 (Carpeta historico) | Ninguna | PASS |
|
|
| Tarea 1.1 (Mover obsoletos) | Tarea 0.2 | PASS |
|
|
| Tarea 2.1 (Extraer contenido) | Ninguna | PASS |
|
|
| Tarea 2.2 (Eliminar duplicado) | Tarea 2.1 | PASS |
|
|
| Tarea 3.1 (Actualizar _MAP.md) | Ninguna | PASS |
|
|
| Tarea 3.2 (Actualizar CONTEXT-MAP) | Ninguna | PASS |
|
|
| Tarea 3.3 (Actualizar ARQUITECTURA-TECNICA schemas) | Ninguna | PASS |
|
|
| Tarea 3.4 (Documentar credenciales) | Ninguna | PASS |
|
|
| Tarea 4.1 (Crear CALCULADORA-CAMBIO) | Ninguna | PASS |
|
|
| Tarea 4.2 (Crear INDICE-ARQUITECTURA) | Tareas 3.x | PASS |
|
|
| Tarea 4.3 (Crear RESUMEN-ANALISIS-HISTORICO) | Tarea 1.1 | PASS |
|
|
| Tarea 5.1 (Validar coherencia) | Todas anteriores | PASS |
|
|
| Tarea 5.2 (Verificar referencias) | Tarea 2.2 | PASS |
|
|
| Tarea 5.3 (Validar YAML) | Tarea 3.2 | PASS |
|
|
| Tarea 6.1, 6.2 (Documentar cierre) | Fase 5 | PASS |
|
|
|
|
**Cobertura Dependencias:** 16/16 = **100%**
|
|
|
|
---
|
|
|
|
## 4. VALIDACION DE RIESGOS
|
|
|
|
| Riesgo | Mitigacion en Plan | Validado |
|
|
|--------|-------------------|----------|
|
|
| Perder informacion al eliminar | Tarea 0.1 (Backup), Tarea 2.1 (Extraer primero) | PASS |
|
|
| Referencias rotas | Tarea 5.2 (Verificar referencias) | PASS |
|
|
| Inconsistencia temporal | Orden de dependencias respetado | PASS |
|
|
| Sintaxis YAML invalida | Tarea 5.3 (Validar sintaxis) | PASS |
|
|
|
|
**Cobertura Riesgos:** 4/4 = **100%**
|
|
|
|
---
|
|
|
|
## 5. VALIDACION DE METRICAS DE EXITO
|
|
|
|
| Criterio | Como se Valida | Tarea |
|
|
|----------|----------------|-------|
|
|
| Archivos duplicados = 0 | Eliminar E-001 | Tarea 2.2 |
|
|
| Referencias rotas = 0 | Verificar post-ejecucion | Tarea 5.2 |
|
|
| Coherencia epicas = 100% | Actualizar CONTEXT-MAP | Tarea 3.2 |
|
|
| Archivos obsoletos activos = 0 | Mover a historico | Tarea 1.1 |
|
|
| Documentacion faltante critica = 0 | Crear CALCULADORA-CAMBIO | Tarea 4.1 |
|
|
|
|
**Cobertura Metricas:** 5/5 = **100%**
|
|
|
|
---
|
|
|
|
## 6. RESUMEN DE VALIDACION
|
|
|
|
| Area | Cobertura |
|
|
|------|-----------|
|
|
| Hallazgos T-001 (Especificaciones) | 100% |
|
|
| Hallazgos T-002 (Duplicados) | 100% |
|
|
| Hallazgos T-003 (Epicas) | 100% |
|
|
| Hallazgos T-004 (Historicos) | 100% |
|
|
| Acciones ELIMINAR | 100% |
|
|
| Acciones ARCHIVAR | 100% |
|
|
| Acciones ACTUALIZAR | 100% |
|
|
| Acciones CREAR | 100% |
|
|
| Acciones CONSOLIDAR | 100% |
|
|
| Dependencias | 100% |
|
|
| Riesgos | 100% |
|
|
| Metricas de Exito | 100% |
|
|
|
|
---
|
|
|
|
## 7. CONCLUSION
|
|
|
|
El plan de ejecucion **CUBRE EL 100%** de los hallazgos del analisis consolidado.
|
|
|
|
### Verificaciones Completadas:
|
|
- Todos los hallazgos tienen tarea asignada
|
|
- Todas las acciones tienen tarea correspondiente
|
|
- Las dependencias estan correctamente ordenadas
|
|
- Los riesgos tienen mitigacion definida
|
|
- Las metricas de exito son verificables
|
|
|
|
### Estado: **PLAN VALIDADO - LISTO PARA EJECUCION**
|
|
|
|
---
|
|
|
|
**Fecha de validacion:** 2026-01-10
|
|
**Validado por:** Arquitecto de Documentacion
|