Some checks are pending
CI/CD Pipeline / Backend CI (push) Waiting to run
CI/CD Pipeline / Frontend CI (push) Waiting to run
CI/CD Pipeline / WhatsApp Service CI (push) Waiting to run
CI/CD Pipeline / Mobile CI (push) Waiting to run
CI/CD Pipeline / Docker Build (./apps/backend, ./apps/backend/Dockerfile, backend) (push) Blocked by required conditions
CI/CD Pipeline / Docker Build (./apps/frontend, ./apps/frontend/Dockerfile, frontend) (push) Blocked by required conditions
CI/CD Pipeline / Docker Build (./apps/whatsapp-service, ./apps/whatsapp-service/Dockerfile, whatsapp-service) (push) Blocked by required conditions
CI/CD Pipeline / Deploy to Production (push) Blocked by required conditions
- Move 7 non-standard folders to _archive/ - Archive 3 extra root files - Update _MAP.md with standardized structure Standard: SIMCO-ESTANDAR-ORCHESTRATION v1.0.0 Level: CONSUMER (L2) Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
4.1 KiB
4.1 KiB
Fase C: CONTEXTO
Task ID: TASK-2026-01-20-001 Fecha: 2026-01-20 Agente: Orquestador Fase: Contexto (C) del ciclo CAPVED
1. Origen de la Solicitud
1.1 Solicitante
- Tipo: Orquestador
- Fuente: Planificacion de Sprint 8
1.2 Solicitud Original
Completar la integracion del frontend web con todas las APIs del backend. El Sprint 7 dejo 6 paginas con APIs conectadas. Este sprint debe:
- Conectar las 8 paginas restantes
- Implementar Dark Mode
- Habilitar PWA
- Agregar exportacion PDF/Excel
- Documentar componentes
2. Clasificacion de la Tarea
2.1 Tipo
- Feature (nueva funcionalidad)
- Bugfix (correccion de error)
- Refactor (mejora sin cambio funcional)
- Documentation (solo documentacion)
- Analysis (investigacion/analisis)
- Migration (migracion de datos/codigo)
- Security (fix de seguridad)
2.2 Prioridad
- P0 - Critico (produccion afectada)
- P1 - Alta (bloquea desarrollo)
- P2 - Media (planificado)
- P3 - Baja (cuando haya tiempo)
2.3 Nivel de Impacto
- Workspace (afecta multiples proyectos)
- Proyecto (afecta un proyecto completo)
- Modulo (afecta un modulo especifico)
- Archivo (cambio localizado)
3. Contexto Tecnico
3.1 Proyecto(s) Afectado(s)
| Proyecto | Modulo | Capa |
|---|---|---|
| michangarrito | frontend | frontend |
| michangarrito | backend | backend |
| michangarrito | docs | docs |
3.2 Estado Actual
- Frontend: 6/14 paginas conectadas a APIs (43%)
- Settings: Sin backend endpoints
- Dark Mode: No implementado
- PWA: No habilitado
- Exportacion: No disponible
3.3 Comportamiento Esperado
- Frontend: 14/14 paginas conectadas (100%)
- Settings: Completamente funcional
- Dark Mode: Toggle funcional con persistencia
- PWA: Instalable en dispositivos
- Exportacion: PDF y Excel disponibles
4. Referencias Consultadas
4.1 Documentacion
- orchestration/PROXIMA-ACCION.md - Estado actual del proyecto
- orchestration/inventarios/FRONTEND_INVENTORY.yml - Lista de paginas
- docs/_definitions/ESTADO-REAL-EPICAS.md - Estado de epicas
4.2 Codigo Existente
- frontend/src/pages/ - Paginas a modificar
- frontend/src/lib/api.ts - APIs existentes
- backend/src/modules/ - Modulos backend
4.3 Directivas Aplicables
- @SIMCO-TAREA (punto de entrada)
- @SIMCO-FRONTEND (modificaciones frontend)
- @SIMCO-BACKEND (nuevos endpoints)
5. Vinculacion
5.1 Epica/User Story
- Epica: MCH-021 - Dashboard Web
- User Story: N/A
5.2 Tareas Relacionadas
| Task ID | Relacion | Estado |
|---|---|---|
| Sprint 7 | predecesor | completado |
6. Restricciones y Consideraciones
6.1 Restricciones Tecnicas
- Backend debe soportar todos los endpoints requeridos
- PWA requiere HTTPS en produccion
- Dark mode debe ser compatible con todos los componentes
6.2 Restricciones de Negocio
- Debe completarse en un dia
- No debe romper funcionalidad existente
6.3 Riesgos Identificados
| Riesgo | Probabilidad | Impacto | Mitigacion |
|---|---|---|---|
| Endpoints faltantes | Media | Alto | Crear endpoints primero |
| Incompatibilidad dark mode | Baja | Medio | Probar componente por componente |
| PWA no funciona | Baja | Bajo | Es mejora opcional |
7. Criterios de Exito
- 14/14 paginas conectadas a APIs
- Dark Mode funcional con toggle
- PWA instalable
- Exportacion PDF/Excel disponible
- Build pasa sin errores
- Documentacion actualizada
8. Decision de Continuacion
8.1 Modo de Ejecucion Seleccionado
- @FULL - Ciclo CAPVED completo
- @QUICK - Solo E+D
- @ANALYSIS - Solo investigacion
8.2 Justificacion
Sprint completo requiere analisis, planeacion y validacion adecuada
8.3 Siguiente Fase
- Contexto (C) - COMPLETADA
- Analisis (A) - COMPLETADA
- Plan (P) - COMPLETADA
- Validacion (V) - COMPLETADA
- Ejecucion (E) - COMPLETADA
- Documentacion (D) - COMPLETADA
Fase C completada: 2026-01-20 08:00 Agente: Orquestador