- FASE-0: Diagnostic audit of 500+ files, 33 findings cataloged (7P0/8P1/12P2/6P3) - FASE-1: Resolved 7 P0 critical conflicts (ports, paths, dedup OQI-010/ADR-002, orphan schemas) - FASE-2: Resolved 8 P1 issues (traces, README/CLAUDE.md, DEPENDENCY-GRAPH v2.0, DDL drift, stack versions, DoR/DoD) - FASE-3: Resolved 12 P2 issues (archived tasks indexed, RNFs created, OQI-010 US/RF/ET, AGENTS v2.0) - FASE-4: Purged 3 obsolete docs to _archive/, fixed MODELO-NEGOCIO.md broken ref - FASE-5: Cross-layer validation (DDL→OQI 66%, OQI→BE 72%, BE→FE 78%, Inventories 95%) - FASE-6: INFORME-FINAL, SA-INDEX (18 subagents), METADATA COMPLETED 27/33 findings resolved (82%), 6 P3 deferred to backlog. 18 new files created, 40+ modified, 4 archived. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
142 lines
3.7 KiB
Markdown
142 lines
3.7 KiB
Markdown
---
|
|
id: "DEFINITION-OF-READY"
|
|
title: "Definition of Ready (DoR) - Trading Platform (Trading Platform)"
|
|
type: "Documentation"
|
|
project: "trading-platform"
|
|
version: "1.0.0"
|
|
updated_date: "2026-02-06"
|
|
---
|
|
|
|
# Definition of Ready (DoR) - Trading Platform (Trading Platform)
|
|
|
|
**Proyecto:** Trading Platform - Plataforma de Trading con IA
|
|
**Ultima actualizacion:** 2026-01-04
|
|
|
|
---
|
|
|
|
## Proposito
|
|
|
|
El Definition of Ready (DoR) define los criterios que un item del backlog debe cumplir antes de que pueda ser trabajado en un Sprint.
|
|
|
|
---
|
|
|
|
## Criterios Generales
|
|
|
|
Un item del backlog esta "Ready" cuando:
|
|
|
|
### 1. Claridad
|
|
|
|
- [ ] El titulo es claro y descriptivo
|
|
- [ ] La descripcion del problema/necesidad esta documentada
|
|
- [ ] Los criterios de aceptacion estan definidos
|
|
- [ ] No hay ambiguedades en los requisitos
|
|
|
|
### 2. Alcance
|
|
|
|
- [ ] El scope esta claramente delimitado
|
|
- [ ] Las dependencias estan identificadas
|
|
- [ ] Los items bloqueantes estan resueltos
|
|
- [ ] El item es lo suficientemente pequeno para un Sprint
|
|
|
|
### 3. Estimacion
|
|
|
|
- [ ] El equipo ha estimado story points
|
|
- [ ] La complejidad tecnica esta evaluada
|
|
- [ ] Los riesgos estan identificados
|
|
|
|
### 4. Documentacion
|
|
|
|
- [ ] Existe RF (Requerimiento Funcional) asociado
|
|
- [ ] Existe ET (Especificacion Tecnica) si aplica
|
|
- [ ] Los mockups/wireframes estan disponibles (si aplica)
|
|
|
|
---
|
|
|
|
## Checklist por Tipo de Item
|
|
|
|
### User Story
|
|
|
|
- [ ] Formato "Como [rol], quiero [funcionalidad], para [beneficio]"
|
|
- [ ] Criterios de aceptacion en formato Given-When-Then o checklist
|
|
- [ ] RF relacionado identificado
|
|
- [ ] Story points estimados
|
|
- [ ] Sin bloqueos activos
|
|
|
|
### Bug Fix
|
|
|
|
- [ ] Pasos para reproducir documentados
|
|
- [ ] Comportamiento esperado vs actual documentado
|
|
- [ ] Severidad/Prioridad asignada
|
|
- [ ] Ambiente donde se reproduce identificado
|
|
|
|
### Technical Task
|
|
|
|
- [ ] Objetivo tecnico claro
|
|
- [ ] Impacto en el sistema documentado
|
|
- [ ] Criterios de completitud definidos
|
|
- [ ] Rollback plan si aplica
|
|
|
|
---
|
|
|
|
## Criterios de Prioridad
|
|
|
|
| Prioridad | Descripcion |
|
|
|-----------|-------------|
|
|
| P0 - Critical | Bloqueante para produccion, seguridad |
|
|
| P1 - High | Funcionalidad core, deadline cercano |
|
|
| P2 - Medium | Mejoras importantes, puede esperar |
|
|
| P3 - Low | Nice-to-have, mejoras menores |
|
|
|
|
---
|
|
|
|
## Criterios Especificos por Modulo
|
|
|
|
### Autenticacion (OQI-001)
|
|
|
|
- [ ] Flujos de OAuth documentados con proveedores
|
|
- [ ] Requisitos de seguridad especificados
|
|
- [ ] Tokens y sesiones definidos
|
|
|
|
### Trading (OQI-003)
|
|
|
|
- [ ] Fuentes de datos de mercado identificadas
|
|
- [ ] Indicadores tecnicos especificados
|
|
- [ ] Latencia aceptable definida
|
|
|
|
### ML Signals (OQI-006)
|
|
|
|
- [ ] Datos de entrenamiento disponibles
|
|
- [ ] Metricas de accuracy definidas
|
|
- [ ] Pipeline de inferencia especificado
|
|
|
|
### LLM Strategy Agent (OQI-007)
|
|
|
|
- [ ] LLM API documentada (Claude/GPT endpoints, auth, rate limits)
|
|
- [ ] Schema de conversaciones definido (messages, tool_calls, tokens)
|
|
- [ ] Definiciones de tools completas (get_signal, analyze_chart, execute_trade)
|
|
- [ ] Prompt templates listos y revisados
|
|
|
|
### Portfolio Manager (OQI-008)
|
|
|
|
- [ ] Schema de portfolio definido (allocations, goals, snapshots)
|
|
- [ ] Algoritmos de allocation documentados (risk-based, target-based)
|
|
- [ ] Modelo de riesgo especificado (risk profiles, drift thresholds)
|
|
|
|
### Marketplace (OQI-009)
|
|
|
|
- [ ] Schema de catalogo de productos definido (products, pricing, subscriptions)
|
|
- [ ] Integracion Stripe documentada (checkout, webhooks, refunds)
|
|
- [ ] Modelo de precios aprobado (planes, comisiones, advisory fees)
|
|
|
|
---
|
|
|
|
## Notas
|
|
|
|
- Items que no cumplan DoR no entran al Sprint
|
|
- El PO es responsable de asegurar que el backlog este "Ready"
|
|
- El equipo puede rechazar items que no cumplan DoR en Planning
|
|
|
|
---
|
|
|
|
**Basado en:** Estandar SCRUM + SIMCO (Sistema Indexado Modular por Contexto)
|