- FASE-0: Diagnostic audit of 500+ files, 33 findings cataloged (7P0/8P1/12P2/6P3) - FASE-1: Resolved 7 P0 critical conflicts (ports, paths, dedup OQI-010/ADR-002, orphan schemas) - FASE-2: Resolved 8 P1 issues (traces, README/CLAUDE.md, DEPENDENCY-GRAPH v2.0, DDL drift, stack versions, DoR/DoD) - FASE-3: Resolved 12 P2 issues (archived tasks indexed, RNFs created, OQI-010 US/RF/ET, AGENTS v2.0) - FASE-4: Purged 3 obsolete docs to _archive/, fixed MODELO-NEGOCIO.md broken ref - FASE-5: Cross-layer validation (DDL→OQI 66%, OQI→BE 72%, BE→FE 78%, Inventories 95%) - FASE-6: INFORME-FINAL, SA-INDEX (18 subagents), METADATA COMPLETED 27/33 findings resolved (82%), 6 P3 deferred to backlog. 18 new files created, 40+ modified, 4 archived. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
10 KiB
10 KiB
Referencias a Tareas Completadas - Trading Platform
Generado: 2026-02-06 Version: 1.0.0 Proposito: Indice de referencia rapida a deliverables de tareas completadas que contienen matrices, contratos, planes y analisis reutilizables.
TASK-2026-01-25-FRONTEND-ANALYSIS
- Tipo: Analysis (CAPVED completo)
- Fecha: 2026-01-25
- Agente: Claude Opus 4.5 (5+8 subagentes paralelos)
- Deliverables:
- 5 especificaciones frontend: ET-AUTH-006, ET-ML-008, ET-LLM-007, ET-PFM-008, ET-MKT-003
- 8 historias de usuario: US-AUTH-013, US-AUTH-014, US-ML-008, US-ML-009, US-ML-010, US-LLM-011, US-PFM-013, US-PFM-014
- API-FRONTEND-COVERAGE-MATRIX.md (85% cobertura)
- FILE-GENERATION-SPEC.md
- DEPENDENCY-GRAPH.yml actualizado con epicas
- Inventarios actualizados: MASTER_INVENTORY, FRONTEND_INVENTORY, BACKEND_INVENTORY
- 6 documentos CAPVED (01-CONTEXTO a 06-DOCUMENTACION)
- SUMMARY.md con resumen ejecutivo
- Ubicacion:
orchestration/tareas/_archive/2026-01/TASK-2026-01-25-FRONTEND-ANALYSIS/ - Estado: Archivada (hallazgos integrados en inventarios y specs)
- Metricas: 8773 LOC, 20+ archivos creados/modificados, 26 entregables totales
- Relevancia actual: Las ET specs y US siguen siendo referencia valida para definiciones de modulos OQI-001/006/007/008/009
TASK-2026-01-25-002-FRONTEND-COMPREHENSIVE-AUDIT
- Tipo: Audit (CAPVED completo)
- Fecha: 2026-01-25 a 2026-01-30
- Agente: Claude Opus 4.5 (9 subagentes paralelos)
- Deliverables:
entregables/COMPONENTS-MASTER-MATRIX.md-- Matriz de 123 componentes auditados (8000+ lineas)entregables/API-CONTRACTS-MASTER-MATRIX.md-- Contratos de 113 APIs con schemas req/res (6000+ lineas)entregables/MULTIMEDIA-MASTER-MATRIX.md-- Analisis multimedia completo (4000+ lineas)entregables/DEPENDENCY-GRAPH.md-- Grafo de dependencias con Mermaid (7000+ lineas)entregables/PURGE-PLAN.md-- Plan de limpieza documental (2500+ lineas)entregables/INTEGRATION-PLAN.md-- 58 items de integracion faltantes (3500+ lineas)entregables/RECOMMENDATIONS.md-- Recomendaciones por rol PM/Eng/QA/DevOps/UX (10000+ lineas)EXECUTIVE-SUMMARY.md-- Resumen ejecutivo (5000+ lineas)SUMMARY.md-- Resumen con metricas finalesVALIDACION-GOBERNANZA.md-- Checklist de gobernanza- 6 documentos CAPVED
- 48 documentos de analisis por subagentes (organizados por OQI-001 a OQI-009)
- Ubicacion:
orchestration/tareas/2026-01-25/TASK-2026-01-25-002-FRONTEND-COMPREHENSIVE-AUDIT/ - Estado: Completada (inventarios FRONTEND_INVENTORY v2.0 y MASTER_INVENTORY actualizados)
- Metricas: 19,117 LOC de analisis, 48 documentos, 123 componentes, 113 APIs, 9 epics
- Hallazgos clave:
- Progreso global real: 38% (auditorias previas sobreestimaban)
- 30 gaps criticos P0-P1 identificados
- 2,457 horas de trabajo pendiente ($216K inversion, +165% ROI Year 1)
- 0 dependencias circulares
- Blockers P0: token refresh manual, PCI-DSS non-compliant, video upload, MT4 Gateway 0%
- Relevancia actual: COMPONENTS-MASTER-MATRIX y API-CONTRACTS-MASTER-MATRIX son las referencias definitivas para el frontend. DEPENDENCY-GRAPH es esencial para planificacion.
TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN
- Tipo: Analysis + Execution (CAPVED completo)
- Fecha: 2026-01-26
- Agente: Claude Sonnet 4.5 (5 subagentes Explore paralelos)
- Deliverables:
01-CONTEXTO.md-- Contexto integral (800 lineas)02-ANALISIS.md-- Analisis exhaustivo (2500 lineas)03-PLAN.md-- Plan de integracion (3000 lineas)EXECUTIVE-SUMMARY.md-- Resumen ejecutivo (500 lineas)ST4.2-PCI-DSS-COMPLETE.md-- Reporte PCI-DSS compliance implementadoST4.3-VIDEO-UPLOAD-COMPLETE.md-- Reporte Video Upload implementadoVALIDATION-DOCUMENTACION-SIMCO.md-- Validacion SIMCO- PCI-DSS architecture spec:
docs/02-definicion-modulos/OQI-005-payments-stripe/especificaciones/ET-PAY-006-pci-dss-architecture.md - PCI-DSS audit:
docs/02-definicion-modulos/OQI-005-payments-stripe/security/PCI-DSS-SAQ-A-AUDIT-2026.md - Developer guidelines:
docs/02-definicion-modulos/OQI-005-payments-stripe/DEVELOPER-GUIDELINES.md - E2E tests: payments-pci-dss.test.ts, payments-stripe-elements.test.tsx
- Video Upload: videos.sql DDL, storage.service.ts, video.service.ts, video.controller.ts, video-processing.service.ts
- Video Upload spec: ET-EDU-008-video-upload-multipart.md
- Ubicacion:
orchestration/tareas/_archive/2026-01/TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN/ - Estado: Archivada (PCI-DSS y Video Upload implementados; gaps de coherencia pendientes)
- Metricas: 7.5h ejecucion real (vs 12h estimadas), 58K LOC produccion, 16 tareas analizadas
- Hallazgos clave:
- 7 gaps de coherencia DDL-Backend-Frontend (E-COH-001 a E-COH-007)
- 32 blockers P0-P1 (2,457h trabajo pendiente)
- Roadmap 4 fases: Q1 Security (201h), Q2 Core Features (362h), Q3 Scalability (380h), Q4 Advanced (1514h)
- Relevancia actual: Roadmap y gaps de coherencia siguen siendo referencia para planificacion. PCI-DSS y Video Upload ya ejecutados.
TASK-2026-02-05-ANALISIS-VALIDACION-MODELADO-BD
- Tipo: Analysis (CAPVED completo, 6 fases)
- Fecha: 2026-02-05
- Agente: Claude Code (Opus 4.6), 9+ subagentes
- Deliverables:
analisis/ANALISIS-MAESTRO.md-- Documento principal de analisisanalisis/PLAN-FASES-DETALLADO.yml-- Plan 6 fases, 24 subtareas, 68 atomicas CAPVEDanalisis/GAPS-CONSOLIDADO.yml-- 37 gaps catalogados (3 resueltos, 34 pendientes)entregables/REPORTE-CONSOLIDADO-FASE2.md-- Reporte consolidado con metricasentregables/RECOMENDACIONES-MODELADO.md-- 9 recomendaciones tecnicas priorizadasentregables/FASE3-INTEGRIDAD-AUDITORIA.yml-- Auditoria FK/constraints/functions/triggers (2603 lineas)entregables/FASE4-DDL-BACKEND-MATRIX.yml-- Mapeo completo DDL-Backendentregables/ENTITIES-CREATION-PLAN.yml-- Plan creacion 31 entities faltantesentregables/PURGA-DOCUMENTAL.yml-- Catalogo de purga (201 archivos analizados)entregables/PLAN-MAESTRO-REMEDIACION.yml-- Plan 4 sprints, 204h esfuerzo (~93h paralelo)entregables/REMEDIATION-CHECKLIST.md-- Checklist ejecutable por sprintsubagentes/SA-01-EDUCATION-VALIDATION-SUMMARY.mdsubagentes/SA-05-ENUM-VALIDATION-REPORT.md
- Ubicacion:
orchestration/tareas/TASK-2026-02-05-ANALISIS-VALIDACION-MODELADO-BD/ - Estado: Completada (hallazgos integrados, remediacion parcial ejecutada)
- Metricas:
- 101 tablas DDL validadas (11 schemas)
- 37 gaps catalogados: 3 resueltos, 34 pendientes
- 17 integrity issues: 2 CRITICAL, 5 HIGH, 6 MEDIUM, 4 LOW
- Coherencia DDL-Backend: type interfaces 84% (85/101), services 75% (76/101), controllers 61% (62/101)
- Integridad: 80 FKs, 89 CHECKs, 32 UNIQUEs, 36 funciones, 46 triggers, 42 enums
- 13 entregables totales
- Hallazgos criticos:
- CRIT-001: trigger
create_user_trading_defaultscomentado - CRIT-002: Missing CHECK constraints en orders/positions/bots
- 3 conflictos de enum (transaction_type, risk_profile, timeframe)
- Backend usa raw SQL con pg Pool (NO TypeORM) - hallazgo que corrigio metricas previas
- feature_flags y audit schemas con 0% cobertura backend
- 15 FKs faltantes identificados
- CRIT-001: trigger
- Remediacion ejecutada (post-analisis):
- Backend: +3071 lineas (audit module, 2FA, market-data, bots)
- Database: +79 lineas (enums, price_alerts)
- Frontend: +16897 lineas (auth, payments, portfolio, trading, marketplace)
- Relevancia actual: PLAN-MAESTRO-REMEDIACION.yml y REMEDIATION-CHECKLIST.md son la guia activa para siguiente sprint. GAPS-CONSOLIDADO.yml es el tracking SSOT de gaps.
TASK-2026-01-25-ML-TRAINING-ENHANCEMENT (Referencia ML)
- Tipo: Analysis (plan estrategico ML)
- Fecha: 2026-01-25
- Deliverables:
- ML-TRAINING-ENHANCEMENT-SPEC.md (spec de arquitectura ML avanzada)
- 6 documentos CAPVED
- Plan con 9 subtareas delegadas (5 estrategias, attention, LLM integration, data pipeline, backtesting)
- Ubicacion:
orchestration/tareas/_archive/2026-01/TASK-2026-01-25-ML-TRAINING-ENHANCEMENT/ - Estado: Archivada (plan de referencia, ejecucion pendiente)
- Relevancia actual: Referencia para desarrollo ML futuro (OQI-006). Las 5 estrategias de trading y la integracion LLM son el roadmap ML.
TASK-2026-01-30-ANALISIS-INTEGRACION (Referencia Integracion)
- Tipo: Analysis
- Fecha: 2026-01-30
- Deliverables:
- GAPS-MATRIX-CONSOLIDATED.md
- COHERENCE-INVENTARIOS-WORKSPACE-PROYECTO.md
- DOCUMENTATION-GAP-ANALYSIS.md
- EXECUTION-PLAN-HIERARCHICAL.md
- PLAN-MAESTRO.md
- PURGE-CANDIDATES-LIST.md
- TEMPLATE-SAAS-INTEGRATION-MATRIX.md
- VALIDATION-CHECKLIST-COMPLETED.md
- Ubicacion:
orchestration/tareas/2026-01-30/TASK-2026-01-30-ANALISIS-INTEGRACION/ - Estado: Completada (supersede TASK-2026-01-27-MASTER-ANALYSIS-PLAN)
- Relevancia actual: GAPS-MATRIX-CONSOLIDATED y EXECUTION-PLAN-HIERARCHICAL son referencias de planificacion. TEMPLATE-SAAS-INTEGRATION-MATRIX es clave para alineacion con template-saas.
Indice Rapido de Deliverables Clave
| Deliverable | Tarea Origen | Tipo | Uso Principal |
|---|---|---|---|
| COMPONENTS-MASTER-MATRIX.md | TASK-002-AUDIT | Matriz | Referencia de 123 componentes frontend |
| API-CONTRACTS-MASTER-MATRIX.md | TASK-002-AUDIT | Matriz | Contratos de 113 endpoints |
| DEPENDENCY-GRAPH.md | TASK-002-AUDIT | Grafo | Arquitectura de dependencias |
| PLAN-MAESTRO-REMEDIACION.yml | TASK-2026-02-05-BD | Plan | Sprint plan activo (4 sprints, 204h) |
| REMEDIATION-CHECKLIST.md | TASK-2026-02-05-BD | Checklist | Ejecucion por sprint |
| GAPS-CONSOLIDADO.yml | TASK-2026-02-05-BD | Tracking | SSOT de 37 gaps |
| FASE3-INTEGRIDAD-AUDITORIA.yml | TASK-2026-02-05-BD | Auditoria | FKs, constraints, triggers |
| FASE4-DDL-BACKEND-MATRIX.yml | TASK-2026-02-05-BD | Mapeo | Coherencia DDL-Backend |
| ML-TRAINING-ENHANCEMENT-SPEC.md | TASK-ML-TRAINING | Spec | Roadmap ML (5 estrategias) |
| GAPS-MATRIX-CONSOLIDATED.md | TASK-2026-01-30 | Matriz | Gaps cross-layer |
| EXECUTION-PLAN-HIERARCHICAL.md | TASK-2026-01-30 | Plan | Plan de ejecucion general |
Documento generado: 2026-02-06 | Sistema SIMCO v4.0.0 | CAPVED