trading-platform/docs/90-transversal/REFERENCIAS-TAREAS-COMPLETADAS.md
Adrian Flores Cortes 8f0235c096 [TASK-2026-02-06-ANALISIS-INTEGRAL-DOCUMENTACION] docs: Complete 6-phase documentation analysis
- FASE-0: Diagnostic audit of 500+ files, 33 findings cataloged (7P0/8P1/12P2/6P3)
- FASE-1: Resolved 7 P0 critical conflicts (ports, paths, dedup OQI-010/ADR-002, orphan schemas)
- FASE-2: Resolved 8 P1 issues (traces, README/CLAUDE.md, DEPENDENCY-GRAPH v2.0, DDL drift, stack versions, DoR/DoD)
- FASE-3: Resolved 12 P2 issues (archived tasks indexed, RNFs created, OQI-010 US/RF/ET, AGENTS v2.0)
- FASE-4: Purged 3 obsolete docs to _archive/, fixed MODELO-NEGOCIO.md broken ref
- FASE-5: Cross-layer validation (DDL→OQI 66%, OQI→BE 72%, BE→FE 78%, Inventories 95%)
- FASE-6: INFORME-FINAL, SA-INDEX (18 subagents), METADATA COMPLETED

27/33 findings resolved (82%), 6 P3 deferred to backlog.
18 new files created, 40+ modified, 4 archived.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-06 10:57:03 -06:00

10 KiB

Referencias a Tareas Completadas - Trading Platform

Generado: 2026-02-06 Version: 1.0.0 Proposito: Indice de referencia rapida a deliverables de tareas completadas que contienen matrices, contratos, planes y analisis reutilizables.


TASK-2026-01-25-FRONTEND-ANALYSIS

  • Tipo: Analysis (CAPVED completo)
  • Fecha: 2026-01-25
  • Agente: Claude Opus 4.5 (5+8 subagentes paralelos)
  • Deliverables:
    • 5 especificaciones frontend: ET-AUTH-006, ET-ML-008, ET-LLM-007, ET-PFM-008, ET-MKT-003
    • 8 historias de usuario: US-AUTH-013, US-AUTH-014, US-ML-008, US-ML-009, US-ML-010, US-LLM-011, US-PFM-013, US-PFM-014
    • API-FRONTEND-COVERAGE-MATRIX.md (85% cobertura)
    • FILE-GENERATION-SPEC.md
    • DEPENDENCY-GRAPH.yml actualizado con epicas
    • Inventarios actualizados: MASTER_INVENTORY, FRONTEND_INVENTORY, BACKEND_INVENTORY
    • 6 documentos CAPVED (01-CONTEXTO a 06-DOCUMENTACION)
    • SUMMARY.md con resumen ejecutivo
  • Ubicacion: orchestration/tareas/_archive/2026-01/TASK-2026-01-25-FRONTEND-ANALYSIS/
  • Estado: Archivada (hallazgos integrados en inventarios y specs)
  • Metricas: 8773 LOC, 20+ archivos creados/modificados, 26 entregables totales
  • Relevancia actual: Las ET specs y US siguen siendo referencia valida para definiciones de modulos OQI-001/006/007/008/009

TASK-2026-01-25-002-FRONTEND-COMPREHENSIVE-AUDIT

  • Tipo: Audit (CAPVED completo)
  • Fecha: 2026-01-25 a 2026-01-30
  • Agente: Claude Opus 4.5 (9 subagentes paralelos)
  • Deliverables:
    • entregables/COMPONENTS-MASTER-MATRIX.md -- Matriz de 123 componentes auditados (8000+ lineas)
    • entregables/API-CONTRACTS-MASTER-MATRIX.md -- Contratos de 113 APIs con schemas req/res (6000+ lineas)
    • entregables/MULTIMEDIA-MASTER-MATRIX.md -- Analisis multimedia completo (4000+ lineas)
    • entregables/DEPENDENCY-GRAPH.md -- Grafo de dependencias con Mermaid (7000+ lineas)
    • entregables/PURGE-PLAN.md -- Plan de limpieza documental (2500+ lineas)
    • entregables/INTEGRATION-PLAN.md -- 58 items de integracion faltantes (3500+ lineas)
    • entregables/RECOMMENDATIONS.md -- Recomendaciones por rol PM/Eng/QA/DevOps/UX (10000+ lineas)
    • EXECUTIVE-SUMMARY.md -- Resumen ejecutivo (5000+ lineas)
    • SUMMARY.md -- Resumen con metricas finales
    • VALIDACION-GOBERNANZA.md -- Checklist de gobernanza
    • 6 documentos CAPVED
    • 48 documentos de analisis por subagentes (organizados por OQI-001 a OQI-009)
  • Ubicacion: orchestration/tareas/2026-01-25/TASK-2026-01-25-002-FRONTEND-COMPREHENSIVE-AUDIT/
  • Estado: Completada (inventarios FRONTEND_INVENTORY v2.0 y MASTER_INVENTORY actualizados)
  • Metricas: 19,117 LOC de analisis, 48 documentos, 123 componentes, 113 APIs, 9 epics
  • Hallazgos clave:
    • Progreso global real: 38% (auditorias previas sobreestimaban)
    • 30 gaps criticos P0-P1 identificados
    • 2,457 horas de trabajo pendiente ($216K inversion, +165% ROI Year 1)
    • 0 dependencias circulares
    • Blockers P0: token refresh manual, PCI-DSS non-compliant, video upload, MT4 Gateway 0%
  • Relevancia actual: COMPONENTS-MASTER-MATRIX y API-CONTRACTS-MASTER-MATRIX son las referencias definitivas para el frontend. DEPENDENCY-GRAPH es esencial para planificacion.

TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN

  • Tipo: Analysis + Execution (CAPVED completo)
  • Fecha: 2026-01-26
  • Agente: Claude Sonnet 4.5 (5 subagentes Explore paralelos)
  • Deliverables:
    • 01-CONTEXTO.md -- Contexto integral (800 lineas)
    • 02-ANALISIS.md -- Analisis exhaustivo (2500 lineas)
    • 03-PLAN.md -- Plan de integracion (3000 lineas)
    • EXECUTIVE-SUMMARY.md -- Resumen ejecutivo (500 lineas)
    • ST4.2-PCI-DSS-COMPLETE.md -- Reporte PCI-DSS compliance implementado
    • ST4.3-VIDEO-UPLOAD-COMPLETE.md -- Reporte Video Upload implementado
    • VALIDATION-DOCUMENTACION-SIMCO.md -- Validacion SIMCO
    • PCI-DSS architecture spec: docs/02-definicion-modulos/OQI-005-payments-stripe/especificaciones/ET-PAY-006-pci-dss-architecture.md
    • PCI-DSS audit: docs/02-definicion-modulos/OQI-005-payments-stripe/security/PCI-DSS-SAQ-A-AUDIT-2026.md
    • Developer guidelines: docs/02-definicion-modulos/OQI-005-payments-stripe/DEVELOPER-GUIDELINES.md
    • E2E tests: payments-pci-dss.test.ts, payments-stripe-elements.test.tsx
    • Video Upload: videos.sql DDL, storage.service.ts, video.service.ts, video.controller.ts, video-processing.service.ts
    • Video Upload spec: ET-EDU-008-video-upload-multipart.md
  • Ubicacion: orchestration/tareas/_archive/2026-01/TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN/
  • Estado: Archivada (PCI-DSS y Video Upload implementados; gaps de coherencia pendientes)
  • Metricas: 7.5h ejecucion real (vs 12h estimadas), 58K LOC produccion, 16 tareas analizadas
  • Hallazgos clave:
    • 7 gaps de coherencia DDL-Backend-Frontend (E-COH-001 a E-COH-007)
    • 32 blockers P0-P1 (2,457h trabajo pendiente)
    • Roadmap 4 fases: Q1 Security (201h), Q2 Core Features (362h), Q3 Scalability (380h), Q4 Advanced (1514h)
  • Relevancia actual: Roadmap y gaps de coherencia siguen siendo referencia para planificacion. PCI-DSS y Video Upload ya ejecutados.

TASK-2026-02-05-ANALISIS-VALIDACION-MODELADO-BD

  • Tipo: Analysis (CAPVED completo, 6 fases)
  • Fecha: 2026-02-05
  • Agente: Claude Code (Opus 4.6), 9+ subagentes
  • Deliverables:
    • analisis/ANALISIS-MAESTRO.md -- Documento principal de analisis
    • analisis/PLAN-FASES-DETALLADO.yml -- Plan 6 fases, 24 subtareas, 68 atomicas CAPVED
    • analisis/GAPS-CONSOLIDADO.yml -- 37 gaps catalogados (3 resueltos, 34 pendientes)
    • entregables/REPORTE-CONSOLIDADO-FASE2.md -- Reporte consolidado con metricas
    • entregables/RECOMENDACIONES-MODELADO.md -- 9 recomendaciones tecnicas priorizadas
    • entregables/FASE3-INTEGRIDAD-AUDITORIA.yml -- Auditoria FK/constraints/functions/triggers (2603 lineas)
    • entregables/FASE4-DDL-BACKEND-MATRIX.yml -- Mapeo completo DDL-Backend
    • entregables/ENTITIES-CREATION-PLAN.yml -- Plan creacion 31 entities faltantes
    • entregables/PURGA-DOCUMENTAL.yml -- Catalogo de purga (201 archivos analizados)
    • entregables/PLAN-MAESTRO-REMEDIACION.yml -- Plan 4 sprints, 204h esfuerzo (~93h paralelo)
    • entregables/REMEDIATION-CHECKLIST.md -- Checklist ejecutable por sprint
    • subagentes/SA-01-EDUCATION-VALIDATION-SUMMARY.md
    • subagentes/SA-05-ENUM-VALIDATION-REPORT.md
  • Ubicacion: orchestration/tareas/TASK-2026-02-05-ANALISIS-VALIDACION-MODELADO-BD/
  • Estado: Completada (hallazgos integrados, remediacion parcial ejecutada)
  • Metricas:
    • 101 tablas DDL validadas (11 schemas)
    • 37 gaps catalogados: 3 resueltos, 34 pendientes
    • 17 integrity issues: 2 CRITICAL, 5 HIGH, 6 MEDIUM, 4 LOW
    • Coherencia DDL-Backend: type interfaces 84% (85/101), services 75% (76/101), controllers 61% (62/101)
    • Integridad: 80 FKs, 89 CHECKs, 32 UNIQUEs, 36 funciones, 46 triggers, 42 enums
    • 13 entregables totales
  • Hallazgos criticos:
    • CRIT-001: trigger create_user_trading_defaults comentado
    • CRIT-002: Missing CHECK constraints en orders/positions/bots
    • 3 conflictos de enum (transaction_type, risk_profile, timeframe)
    • Backend usa raw SQL con pg Pool (NO TypeORM) - hallazgo que corrigio metricas previas
    • feature_flags y audit schemas con 0% cobertura backend
    • 15 FKs faltantes identificados
  • Remediacion ejecutada (post-analisis):
    • Backend: +3071 lineas (audit module, 2FA, market-data, bots)
    • Database: +79 lineas (enums, price_alerts)
    • Frontend: +16897 lineas (auth, payments, portfolio, trading, marketplace)
  • Relevancia actual: PLAN-MAESTRO-REMEDIACION.yml y REMEDIATION-CHECKLIST.md son la guia activa para siguiente sprint. GAPS-CONSOLIDADO.yml es el tracking SSOT de gaps.

TASK-2026-01-25-ML-TRAINING-ENHANCEMENT (Referencia ML)

  • Tipo: Analysis (plan estrategico ML)
  • Fecha: 2026-01-25
  • Deliverables:
    • ML-TRAINING-ENHANCEMENT-SPEC.md (spec de arquitectura ML avanzada)
    • 6 documentos CAPVED
    • Plan con 9 subtareas delegadas (5 estrategias, attention, LLM integration, data pipeline, backtesting)
  • Ubicacion: orchestration/tareas/_archive/2026-01/TASK-2026-01-25-ML-TRAINING-ENHANCEMENT/
  • Estado: Archivada (plan de referencia, ejecucion pendiente)
  • Relevancia actual: Referencia para desarrollo ML futuro (OQI-006). Las 5 estrategias de trading y la integracion LLM son el roadmap ML.

TASK-2026-01-30-ANALISIS-INTEGRACION (Referencia Integracion)

  • Tipo: Analysis
  • Fecha: 2026-01-30
  • Deliverables:
    • GAPS-MATRIX-CONSOLIDATED.md
    • COHERENCE-INVENTARIOS-WORKSPACE-PROYECTO.md
    • DOCUMENTATION-GAP-ANALYSIS.md
    • EXECUTION-PLAN-HIERARCHICAL.md
    • PLAN-MAESTRO.md
    • PURGE-CANDIDATES-LIST.md
    • TEMPLATE-SAAS-INTEGRATION-MATRIX.md
    • VALIDATION-CHECKLIST-COMPLETED.md
  • Ubicacion: orchestration/tareas/2026-01-30/TASK-2026-01-30-ANALISIS-INTEGRACION/
  • Estado: Completada (supersede TASK-2026-01-27-MASTER-ANALYSIS-PLAN)
  • Relevancia actual: GAPS-MATRIX-CONSOLIDATED y EXECUTION-PLAN-HIERARCHICAL son referencias de planificacion. TEMPLATE-SAAS-INTEGRATION-MATRIX es clave para alineacion con template-saas.

Indice Rapido de Deliverables Clave

Deliverable Tarea Origen Tipo Uso Principal
COMPONENTS-MASTER-MATRIX.md TASK-002-AUDIT Matriz Referencia de 123 componentes frontend
API-CONTRACTS-MASTER-MATRIX.md TASK-002-AUDIT Matriz Contratos de 113 endpoints
DEPENDENCY-GRAPH.md TASK-002-AUDIT Grafo Arquitectura de dependencias
PLAN-MAESTRO-REMEDIACION.yml TASK-2026-02-05-BD Plan Sprint plan activo (4 sprints, 204h)
REMEDIATION-CHECKLIST.md TASK-2026-02-05-BD Checklist Ejecucion por sprint
GAPS-CONSOLIDADO.yml TASK-2026-02-05-BD Tracking SSOT de 37 gaps
FASE3-INTEGRIDAD-AUDITORIA.yml TASK-2026-02-05-BD Auditoria FKs, constraints, triggers
FASE4-DDL-BACKEND-MATRIX.yml TASK-2026-02-05-BD Mapeo Coherencia DDL-Backend
ML-TRAINING-ENHANCEMENT-SPEC.md TASK-ML-TRAINING Spec Roadmap ML (5 estrategias)
GAPS-MATRIX-CONSOLIDATED.md TASK-2026-01-30 Matriz Gaps cross-layer
EXECUTION-PLAN-HIERARCHICAL.md TASK-2026-01-30 Plan Plan de ejecucion general

Documento generado: 2026-02-06 | Sistema SIMCO v4.0.0 | CAPVED