trading-platform/orchestration/tareas/_archive/INDICE-TAREAS-ARCHIVADAS.md
Adrian Flores Cortes 8f0235c096 [TASK-2026-02-06-ANALISIS-INTEGRAL-DOCUMENTACION] docs: Complete 6-phase documentation analysis
- FASE-0: Diagnostic audit of 500+ files, 33 findings cataloged (7P0/8P1/12P2/6P3)
- FASE-1: Resolved 7 P0 critical conflicts (ports, paths, dedup OQI-010/ADR-002, orphan schemas)
- FASE-2: Resolved 8 P1 issues (traces, README/CLAUDE.md, DEPENDENCY-GRAPH v2.0, DDL drift, stack versions, DoR/DoD)
- FASE-3: Resolved 12 P2 issues (archived tasks indexed, RNFs created, OQI-010 US/RF/ET, AGENTS v2.0)
- FASE-4: Purged 3 obsolete docs to _archive/, fixed MODELO-NEGOCIO.md broken ref
- FASE-5: Cross-layer validation (DDL→OQI 66%, OQI→BE 72%, BE→FE 78%, Inventories 95%)
- FASE-6: INFORME-FINAL, SA-INDEX (18 subagents), METADATA COMPLETED

27/33 findings resolved (82%), 6 P3 deferred to backlog.
18 new files created, 40+ modified, 4 archived.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-06 10:57:03 -06:00

14 KiB

Indice de Tareas Archivadas - Trading Platform

Generado: 2026-02-06 Total: 21 tareas archivadas (en carpeta _archive/2026-01/) Clasificacion: 5 INTEGRAR, 10 PRESERVAR, 6 PURGAR Nota: Existen ademas 5 tareas en subcarpetas por fecha (2026-01-25/, 2026-01-27/, 2026-01-30/) que no estan en la carpeta _archive pero pertenecen al mismo periodo.


Resumen por Clasificacion

Clasificacion Cantidad Descripcion
INTEGRAR 5 Contiene definiciones (US, RF, ET, matrices) valiosas que deben extraerse hacia docs/
PRESERVAR 10 Referencia util para contexto historico; no requiere extraccion
PURGAR 6 Obsoleta, supersedida, cancelada o sin contenido relevante

Tareas en _archive/2026-01/

# ID Titulo Fecha Tipo Clasificacion Motivo Deliverables Valiosos
1 TASK-001-SPRINT1-P0-TRADING-AGENTS Sprint 1: P0 Gaps - Trading Agents UI 2026-01-28 FEATURE PRESERVAR Codigo implementado, ya en codebase; metadata documenta 2212 LOC creados (7 archivos frontend trading agents) METADATA.yml con lista de archivos creados
2 TASK-002-SPRINT2-P1-GAPS Sprint 2: P1 Gaps - Market Data, ML Overlays, 2FA 2026-01-28 FEATURE PRESERVAR Codigo implementado (3 gaps resueltos: market-data service, ML overlays, 2FA frontend); 2118 LOC, 13 archivos METADATA.yml con lista de archivos
3 TASK-003-SPRINT3-P2-GAPS Sprint 3: P2 Gaps - Audit, Currency, Risk, Reviews 2026-01-28 FEATURE PRESERVAR 4 modulos backend nuevos implementados (audit, currency, risk, reviews); 3571 LOC, 18 archivos METADATA.yml detallado
4 TASK-2026-01-25-FRONTEND-ANALYSIS Analisis y Documentacion Frontend Trading Platform 2026-01-25 ANALYSIS INTEGRAR Contiene 5 especificaciones frontend (ET-AUTH-006, ET-ML-008, ET-LLM-007, ET-PFM-008, ET-MKT-003), 8 historias de usuario nuevas, API-Frontend coverage matrix (85%) SUMMARY.md, 01-06 CAPVED, 5 ET specs, 8 US
5 TASK-2026-01-25-FRONTEND-COMPONENTS-OQI-004-006-007 Creacion de 12 Componentes Frontend OQI-004/006/007 2026-01-25 FEATURE PRESERVAR 12 componentes creados (4 ML, 4 Investment, 4 Assistant); metadata muy detallada con lineas, tipos, commits METADATA.yml completo
6 TASK-2026-01-25-ML-DATA-MIGRATION Migracion MySQL a PostgreSQL y Entrenamiento ML 2026-01-25 FEATURE PRESERVAR 12 modelos ML entrenados, script Polygon API, 469K bars ingestados; scripts en apps/data-service/ y ml-engine/ METADATA.yml, SUMMARY.md
7 TASK-2026-01-25-ML-TRAINING-ENHANCEMENT Mejora Integral Modelos ML - Arquitectura Avanzada 2026-01-25 ANALYSIS INTEGRAR Plan maestro ML con 5 estrategias de trading (Price Variation, Momentum Regime, Volatility Breakout, Market Structure, Multi-Timeframe), mecanismos de atencion, integracion LLM. Objetivo: 80% efectividad METADATA.yml, ML-TRAINING-ENHANCEMENT-SPEC.md, 6 CAPVED docs
8 TASK-2026-01-25-NOTIFICACIONES-COMPLETAS Sistema de Notificaciones Completo 2026-01-25 FEATURE PRESERVAR Implementacion full-stack: 4 tablas DDL, FCM/Web Push, tests, frontend NotificationCenter; ~2500 LOC, 14 archivos METADATA.yml con lista archivos
9 TASK-2026-01-25-OQI-002-EDUCATION-ADVANCED OQI-002 Education Advanced Components 2026-01-25 FEATURE PURGAR 4 componentes frontend UI-only (VideoUploadForm, CreatorDashboard, CertificateGenerator, LiveStreamPlayer); sin integracion backend, build N/A. Supersedido por analisis posteriores METADATA.yml
10 TASK-2026-01-25-OQI-003-TRADING-ADVANCED OQI-003 Trading Advanced - Market Depth y Screener 2026-01-25 FEATURE PURGAR 4 componentes frontend (OrderBookDepth, MarketDepthPanel, SymbolComparison, TradingScreener); build N/A, sin validacion real METADATA.yml
11 TASK-2026-01-25-OQI-003-TRADING-PANELS OQI-003 Trading Panels - Alerts, Stats, OrderBook 2026-01-25 FEATURE PRESERVAR AlertsPanel, TradingStatsPanel, OrderBookPanel implementados con integracion a Trading.tsx; funcionalidades detalladas METADATA.yml detallado
12 TASK-2026-01-25-OQI-004-ACCOUNT-DETAIL OQI-004 Investment Module Frontend Completo 2026-01-25 FEATURE PRESERVAR 5 paginas investment (AccountDetail, Withdrawals, Transactions, Reports, ProductDetail) + investment.service.ts; rutas configuradas METADATA.yml
13 TASK-2026-01-25-OQI-004-INVESTMENT-ADVANCED OQI-004 Investment Advanced Components 2026-01-25 FEATURE PURGAR 4 componentes UI-only (CreateAccountWizard, RiskAnalysisPanel, PortfolioOptimizerWidget, AccountTransferModal); build N/A, sin integracion backend METADATA.yml
14 TASK-2026-01-25-OQI-005-PAYMENTS-ADVANCED OQI-005 Payments Advanced - Stripe Integration 2026-01-25 FEATURE PRESERVAR StripeElementsWrapper (PCI-DSS base), InvoicePreview, RefundRequestModal, RefundList; pattern PCI-DSS compliance METADATA.yml
15 TASK-2026-01-25-OQI-008-PORTFOLIO-MANAGER OQI-008 Portfolio Manager Completo 2026-01-25 FEATURE INTEGRAR Implementacion full-stack: 4 repos PostgreSQL, WebSocket real-time, 5 paginas frontend, store con WS; 3500 LOC, 18 archivos. 90% funcional METADATA.yml, SUMMARY.md
16 TASK-2026-01-25-PHASE1-MVP Phase 1 MVP - Notificaciones y Distribucion 2026-01-25 FEATURE PURGAR Servicios de notificaciones y distribution job; supersedido por TASK-NOTIFICACIONES-COMPLETAS que implemento lo mismo con mas alcance METADATA.yml
17 TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN Analisis Integral y Plan de Integracion 2026-01-26 ANALYSIS INTEGRAR Analisis exhaustivo post-mejoras: 7 gaps coherencia, 32 blockers P0-P1, roadmap 4 fases (Q1-Q4), 2457h trabajo pendiente. Incluye PCI-DSS docs + Video Upload implementation 01-CONTEXTO, 02-ANALISIS, 03-PLAN, ST4.2-PCI-DSS, ST4.3-VIDEO-UPLOAD, VALIDATION
18 TASK-2026-01-26-OQI-006-ML-UTILITY-PANELS OQI-006 ML Utility Panels 2026-01-26 FEATURE PURGAR 3 componentes frontend (ModelSelector, EnsemblePanel, ICTAnalysisPanel); build N/A, sin integracion backend METADATA.yml
19 TASK-2026-01-26-OQI-007-LLM-ASSISTANT-PANELS OQI-007 LLM Assistant Panels 2026-01-26 FEATURE PURGAR 4 componentes utilidad (ErrorBoundary, ConnectionStatus, TokenUsageDisplay, PromptLibrary); build pendiente, sin validacion METADATA.yml, 6 CAPVED docs
20 TASK-2026-01-27-E2E-VIDEO-UPLOAD E2E Tests Video Upload 2026-01-27 TESTING PRESERVAR 153 tests en 7 suites (form, service, integration, controller, service, storage, E2E flow); 2500 LOC METADATA.yml
21 TASK-2026-01-27-PLATFORM-VALIDATION Platform Validation: TS Build, Auth, WebSocket, ML Data 2026-01-27 VALIDATION INTEGRAR Validacion integral: builds OK (0 errores), WS URLs verificados, 1.08M bars OHLCV ingestados (7 simbolos, 2 anos) METADATA.yml

Tareas en subcarpetas por fecha (NO en _archive pero del mismo periodo)

# ID Titulo Fecha Tipo Clasificacion Estado
A TASK-2026-01-25-002-FRONTEND-COMPREHENSIVE-AUDIT Auditoria Comprehensiva Frontend 2026-01-25 AUDIT INTEGRAR Completada - 48 docs, 19K LOC analisis
B TASK-2026-01-25-FRONTEND-MODULE-DOCS Documentacion Modulos Frontend 2026-01-25 DOCS PURGAR Cancelada - 0% progreso, P3
C TASK-2026-01-27-BLOCKER-001-TOKEN-REFRESH Token Refresh Improvements 2026-01-27 REFACTOR PRESERVAR Postergada - 0% progreso, no bloqueante
D TASK-2026-01-27-MASTER-ANALYSIS-PLAN Analisis Maestro Integral 2026-01-27 ANALYSIS PURGAR Supersedida por TASK-2026-01-30-ANALISIS-INTEGRACION
E TASK-2026-01-30-ANALISIS-INTEGRACION Analisis de Integracion 2026-01-30 ANALYSIS INTEGRAR Completada - gaps matrix, purge candidates, execution plan

Detalle por Tarea

TASK-001-SPRINT1-P0-TRADING-AGENTS (PRESERVAR)

Sprint 1 de remediacion de gaps P0. Implemento la UI de Trading Agents (7 archivos frontend, 2212 LOC). Resolvio GAP-P0-003 (Trading Agents UI). Verifico que GAP-P0-001 (Password Recovery) y GAP-P0-002 (User Profile) ya existian. Codigo ya integrado en el codebase.

TASK-002-SPRINT2-P1-GAPS (PRESERVAR)

Sprint 2 de remediacion de gaps P1. Implemento Market Data OHLCV Service (backend), ML Chart Overlays (frontend), y 2FA Frontend Flow. 2118 LOC, 13 archivos creados. 3 gaps resueltos, 1 ya existia.

TASK-003-SPRINT3-P2-GAPS (PRESERVAR)

Sprint 3 de remediacion de gaps P2. Creo 4 modulos backend nuevos: Audit System, Currency Exchange, Risk Assessment, Course Reviews. 3571 LOC, 18 archivos. Incluye DDL para review_helpful_votes.

TASK-2026-01-25-FRONTEND-ANALYSIS (INTEGRAR)

Analisis frontend con CAPVED completo. Genero 5 especificaciones tecnicas frontend (ET-AUTH-006, ET-ML-008, ET-LLM-007, ET-PFM-008, ET-MKT-003), 8 historias de usuario nuevas (US-AUTH-013/014, US-ML-008/009/010, US-LLM-011, US-PFM-013/014), API-Frontend coverage matrix al 85%, y dependency graph actualizado. Total: 8773 LOC en 20+ archivos.

TASK-2026-01-25-FRONTEND-COMPONENTS-OQI-004-006-007 (PRESERVAR)

Creacion de 12 componentes frontend avanzados distribuidos en 3 modulos: ML (ConfidenceMeter, SignalPerformanceTracker, ModelAccuracyDashboard, BacktestResultsVisualization), Investment (AccountSummaryCard, ProductComparisonTable, PerformanceWidgetChart, AccountSettingsPanel), Assistant (AnalysisRequestForm, StrategyTemplateSelector, LLMConfigPanel, ContextMemoryDisplay). 3 commits separados.

TASK-2026-01-25-ML-DATA-MIGRATION (PRESERVAR)

Migracion de ML Engine de MySQL a PostgreSQL. Creo script fetch_polygon_data.py, modulo database.py, actualizo configs. Entrenamiento de 12 modelos de atencion (Level 0) para 6 simbolos (XAUUSD, EURUSD, BTCUSD, GBPUSD, USDJPY, AUDUSD) en 2 timeframes (5m, 15m). Total: 469,217 bars ingestados.

TASK-2026-01-25-ML-TRAINING-ENHANCEMENT (INTEGRAR)

Plan estrategico de mejora ML con 5 estrategias de trading, mecanismos de atencion, y meta-modelos ensemble. Delego a 9 subtareas especializadas. Objetivo: 80% efectividad en operaciones. Referencia clave para desarrollo ML futuro. Exploracion del proyecto antiguo (WorkspaceOld/trading) para migrar conocimiento.

TASK-2026-01-25-NOTIFICACIONES-COMPLETAS (PRESERVAR)

Implementacion completa del sistema de notificaciones: 4 tablas DDL (notifications, user_push_tokens, distribution_history, distribution_runs), Firebase FCM/Web Push, 2 test suites, frontend NotificationCenter con bell+dropdown+page+store. ~2500 LOC, 14 archivos creados, 6 modificados.

TASK-2026-01-25-OQI-002-EDUCATION-ADVANCED (PURGAR)

4 componentes frontend UI-only para modulo educativo. Sin integracion backend, build N/A, sin tests. Los componentes (VideoUploadForm, CreatorDashboard, CertificateGenerator, LiveStreamPlayer) requieren APIs que no existian. Supersedido por analisis posteriores del modulo.

TASK-2026-01-25-OQI-003-TRADING-ADVANCED (PURGAR)

4 componentes frontend para trading avanzado. Build N/A, sin validacion de compilacion. Componentes de Market Depth y Screener con Canvas rendering. Metadata util pero componentes pueden no estar integrados.

TASK-2026-01-25-OQI-003-TRADING-PANELS (PRESERVAR)

AlertsPanel, TradingStatsPanel, y OrderBookPanel con integracion directa en Trading.tsx. Funcionalidades bien detalladas: alertas CRUD, metricas de trading, order book con depth bars. Patron de referencia para paneles de trading.

TASK-2026-01-25-OQI-004-ACCOUNT-DETAIL (PRESERVAR)

5 paginas del modulo investment (AccountDetail, Withdrawals, Transactions, Reports, ProductDetail) + investment.service.ts centralizado. Rutas configuradas en App.tsx. Resolvio link roto desde Portfolio.tsx.

TASK-2026-01-25-OQI-004-INVESTMENT-ADVANCED (PURGAR)

4 componentes UI-only para investment avanzado. Build N/A, sin tests, requieren APIs no implementadas. Patron similar a OQI-002-EDUCATION-ADVANCED.

TASK-2026-01-25-OQI-005-PAYMENTS-ADVANCED (PRESERVAR)

StripeElementsWrapper como base PCI-DSS compliance, InvoicePreview, RefundRequestModal, RefundList. Pattern de referencia importante para integracion Stripe. 1500 LOC.

TASK-2026-01-25-OQI-008-PORTFOLIO-MANAGER (INTEGRAR)

Implementacion full-stack del portfolio manager: 4 repositorios PostgreSQL, WebSocket real-time, 5 paginas frontend, store con WebSocket. 90% funcional, 3500 LOC, 18 archivos. Referencia clave para OQI-008.

TASK-2026-01-25-PHASE1-MVP (PURGAR)

Notification service y distribution job. Duplica/supersedida por TASK-NOTIFICACIONES-COMPLETAS que implemento lo mismo con alcance mayor (incluye DDL, push, tests, frontend).

TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN (INTEGRAR)

Analisis integral mas completo del periodo. 7 gaps de coherencia DDL-Backend-Frontend, 32 blockers P0-P1, roadmap 4 fases (2457h). Incluye ejecucion de ST4.2 (PCI-DSS architecture + tests) y ST4.3 (Video Upload backend completo). 5 subagentes Explore paralelos.

TASK-2026-01-26-OQI-006-ML-UTILITY-PANELS (PURGAR)

3 componentes frontend ML (ModelSelector, EnsemblePanel, ICTAnalysisPanel). Build N/A, componentes de utilidad sin integracion validada.

TASK-2026-01-26-OQI-007-LLM-ASSISTANT-PANELS (PURGAR)

4 componentes utilidad LLM assistant (ErrorBoundary, ConnectionStatus, TokenUsageDisplay, PromptLibrary). Build pendiente, 6 docs CAPVED pero sin validacion ejecutada.

TASK-2026-01-27-E2E-VIDEO-UPLOAD (PRESERVAR)

Suite de tests E2E para video upload: 153 tests en 7 suites cubriendo form, service, integration, controller, storage, y full E2E flow. 2500 LOC, estimacion >80% cobertura.

TASK-2026-01-27-PLATFORM-VALIDATION (INTEGRAR)

Validacion integral: builds TypeScript OK (0 errores backend+frontend), WebSocket URLs verificados, 1.08M bars OHLCV ingestados via Polygon API (7 simbolos, periodo 2024-01 a 2026-01). Script mejorado con batch_size=500 y reconnect logic.


Estadisticas Consolidadas

Metrica Valor
Total tareas archivadas 21 + 5 en subcarpetas = 26
LOC producidos (estimado) ~45,000
Tests escritos 153
Componentes frontend creados ~50+
Modulos backend nuevos 4 (audit, currency, risk, reviews)
Modelos ML entrenados 12
Datos ingestados 1.55M bars OHLCV
Periodo 2026-01-25 a 2026-01-30

Indice generado: 2026-02-06 | Sistema SIMCO v4.0.0