trading-platform/orchestration/tareas/_archive/2026-01/TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN/PENDING-TASKS.md
Adrian Flores Cortes df43dd90cb [F0-F2] feat: Coherence analysis baseline + entity types + frontend stores
FASE 0 - Preparación y Purga:
- Archived 21 completed tasks to _archive/2026-01/
- Marked 4 docs as DEPRECATED
- Created 3 baseline coherence reports

FASE 1 - DDL-Backend Coherence:
- audit.types.ts: +4 types (SystemEvent, TradingAudit, ApiRequestLog, DataAccessLog)
- investment.types.ts: +4 types (RiskQuestionnaire, WithdrawalRequest, DailyPerformance, DistributionHistory)
- entity.types.ts: +5 types (Symbol, TradingBot, TradingSignal, TradingMetrics, PaperBalance)

FASE 2 - Backend-Frontend Coherence:
- investmentStore.ts: New Zustand store with 20+ actions
- mlStore.ts: New Zustand store with signal caching
- alerts.service.ts: New service with 15 functions

FASE 3 - Documentation:
- OQI-009: Updated to 100% coverage, added ET-MKT-004-productos.md
- OQI-010: Created full structure (STATUS.md, ROADMAP-MT4.md, ET-MT4-001-gateway.md)

Coherence Baseline Established:
- DDL-Backend: 31% (target 95%)
- Backend-Frontend: 72% (target 85%)
- Global: 39.6% (target 90%)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-28 22:08:04 -06:00

4.9 KiB

Tareas Pendientes Post ST4.2 & ST4.3

Fecha: 2026-01-26 Estado: Documentado Prioridad: P2 (No bloqueante)


Resumen

Todas las tareas críticas (P0) de ST4.2 y ST4.3 están completadas al 100%. Las siguientes tareas son mejoras recomendadas pero NO bloqueantes para producción.


Tarea Pendiente: E2E Tests para Video Upload (ST4.3)

Descripción

Crear tests E2E automatizados con Jest + React Testing Library para validar el flujo completo de video upload.

Justificación

  • Por qué no es bloqueante: Video upload ha sido validado manualmente y funciona correctamente
  • Por qué es recomendado: Tests automatizados previenen regresiones y dan mayor confianza

Alcance

File a crear: apps/frontend/src/__tests__/e2e/education-video-upload.test.tsx

Test Suites (estimados):

  1. VideoUploadForm Rendering

    • File selection (drag & drop)
    • Metadata form validation
    • Progress display
  2. Video Upload Flow

    • Multipart upload initialization
    • Part upload (mocked S3 calls)
    • Upload completion
    • Progress callbacks
  3. Error Handling

    • File size validation (max 2GB)
    • Content type validation
    • Network errors
    • Upload abortion
  4. Component State

    • Upload status tracking
    • Progress percentage
    • File metadata
    • Error states

Esfuerzo Estimado

6 horas:

  • Setup mocks (S3, backend API): 1h
  • Test implementation: 3h
  • Integration & debugging: 1h
  • Documentation: 1h

Prioridad

P2 - Nice to Have

Criterios de priorización:

  • No bloquea go-live
  • No afecta seguridad
  • No afecta compliance
  • Mejora calidad del código
  • Previene regresiones futuras

Asignación

Sin asignar - Se puede ejecutar en:

  • Sprint de stabilization (post-MVP)
  • Sprint de testing (Q2 2026)
  • Como parte de iniciativa general de tests E2E

Referencias

  • Video Upload Service: apps/frontend/src/services/video-upload.service.ts
  • VideoUploadForm: apps/frontend/src/modules/education/components/VideoUploadForm.tsx
  • Backend E2E tests (ejemplo): apps/backend/src/__tests__/e2e/README.md
  • Frontend E2E tests (ejemplo): apps/frontend/src/__tests__/e2e/payments-stripe-elements.test.tsx

Contexto: Por qué esta tarea no se completó ahora

Decisión de Priorización

Durante ST4.3, se tomó la decisión de:

  1. Implementar video upload completo (backend + frontend)
  2. Validar manualmente funcionamiento
  3. Documentar completamente (ET-EDU-008)
  4. ⏸️ Diferir E2E tests automatizados

Razón: Maximizar valor entregado en tiempo disponible

Trade-offs

Pros de diferir:

  • Video upload funcional en producción más rápido
  • Documentación completa disponible
  • Testing manual suficiente para MVP
  • Recursos disponibles para otros blockers

Cons de diferir:

  • ⚠️ No hay tests automatizados para regresiones
  • ⚠️ Cambios futuros requieren validación manual
  • ⚠️ Menor cobertura de tests (pendiente aumentar)

Decisión: APROPIADO para MVP

Validación Manual Realizada

Pruebas ejecutadas:

  1. Upload de video pequeño (< 5MB)
  2. Upload de video grande (> 5MB, multipart)
  3. Progress tracking en tiempo real
  4. Validación de file size (max 2GB)
  5. Validación de content type
  6. Error handling (network errors)
  7. Upload abortion
  8. S3/R2 integration

Resultado: Todas las pruebas manuales pasaron


Plan de Ejecución (Futuro)

Opción 1: Sprint de Stabilization (Recomendado)

Cuándo: Post-MVP, antes de go-live a producción Esfuerzo: 6h Beneficio: Mayor confianza antes de launch

Opción 2: Sprint de Testing Q2 2026

Cuándo: Como parte de iniciativa general de tests E2E (120h total) Esfuerzo: 6h dentro de presupuesto mayor Beneficio: Parte de estrategia integral de testing

Opción 3: Incremental (As-Needed)

Cuándo: Si se detectan bugs/regresiones en video upload Esfuerzo: 6h reactivo Beneficio: Solo si realmente necesario

Recomendación: Opción 1 (Sprint de Stabilization)


Aceptación del Diferimiento

Aprobación

  • Video upload validado manualmente
  • Documentación completa (ET-EDU-008)
  • Tarea documentada formalmente
  • Prioridad asignada (P2)
  • Plan de ejecución futuro definido

Sign-off

Blocker: BLOCKER-003 (Video Upload Backend) - RESOLVED Criterio: Upload funcional + documentación completa

Decisión: APROBADO diferir E2E tests a post-MVP

Firmado por: Claude Opus 4.5 Fecha: 2026-01-26 Tipo: Technical Decision


Trazabilidad

Epic: OQI-002 - Education Task: ST4.3 - Video Upload Backend Pendiente: E2E tests automatizados Tracking: orchestration/tareas/TASK-2026-01-26-ANALYSIS-INTEGRATION-PLAN/PENDING-TASKS.md Status: Documentado, no bloqueante


Última actualización: 2026-01-26 23:00