workspace-v1/projects/gamilit/docs/03-fase-extensiones/EXT-007-lti-integration/_MAP.md
Adrian Flores Cortes 967ab360bb Initial commit: Workspace v1 with 3-layer architecture
Structure:
- control-plane/: Registries, SIMCO directives, CI/CD templates
- projects/: Gamilit, ERP-Suite, Trading-Platform, Betting-Analytics
- shared/: Libs catalog, knowledge-base

Key features:
- Centralized port, domain, database, and service registries
- 23 SIMCO directives + 6 fundamental principles
- NEXUS agent profiles with delegation rules
- Validation scripts for workspace integrity
- Dockerfiles for all services
- Path aliases for quick reference

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2025-12-23 00:35:19 -06:00

1.4 KiB

_MAP: EXT-007 - LTI Integration

Épica: EXT-007 Nombre: Integración LTI 1.3 (Learning Tools Interoperability) Fase: 3 - Extensiones (Alcance v2 EXTENSIONES) Presupuesto Total: $18,000 MXN Story Points Total: 45 SP Estado: 🟡 40% IMPLEMENTADA (18 SP impl, 27 SP pend) Última actualización: 2025-11-20

CAMBIOS:

  • 2025-11-20: Documentación inicial creada post validación de alcances
  • Estado Actual: Basic auth + Launch implementados, Deep linking/Grade passback/NRPS pendientes

📋 Propósito

Integrar GAMILIT con sistemas de gestión de aprendizaje (LMS) institucionales mediante el estándar LTI 1.3.

Impacto: ALTO - Crítico para adopción institucional B2B


📁 User Stories (6 total)

ID Título SP Prioridad Estado
US-LTI-001 LTI 1.3 Basic Authentication 9 P1 100%
US-LTI-002 LTI Launch Flow 9 P1 100%
US-LTI-003 Deep Linking 9 P1 📝 Pendiente
US-LTI-004 Grade Passback (AGS) 9 P2 📝 Pendiente
US-LTI-005 NRPS 9 P2 📝 Pendiente
US-LTI-006 Analytics - P3 📝 Backlog

Total: 18/45 SP implementados (40%)


🎯 Implementación

Database: lti_integration schema (3/6 tablas) Backend: apps/backend/src/modules/lti/ (2/5 services) Endpoints: 3/8+ implementados


Generado: 2025-11-20