- Configure workspace Git repository with comprehensive .gitignore - Add Odoo as submodule for ERP reference code - Include documentation: SETUP.md, GIT-STRUCTURE.md - Add gitignore templates for projects (backend, frontend, database) - Structure supports independent repos per project/subproject level Workspace includes: - core/ - Reusable patterns, modules, orchestration system - projects/ - Active projects (erp-suite, gamilit, trading-platform, etc.) - knowledge-base/ - Reference code and patterns (includes Odoo submodule) - devtools/ - Development tools and templates - customers/ - Client implementations template 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
24 KiB
ROADMAP: MEJORA DE TEST COVERAGE
Estado: DRAFT Fecha: 2025-11-23 Responsable: Tech Lead Co-responsable: Architecture-Analyst Aprobación requerida: Tech Lead, Product Owner Versión: 1.0 Prioridad: 🔴 CRÍTICA (Gap -74% identificado)
🎯 SITUACIÓN ACTUAL
Gap Crítico Identificado
Origen: Validación de coherencia documentación-código (2025-11-23)
- Actualización de 17 archivos TRACEABILITY.yml con métricas reales
- Gap crítico documentado en GAP-4
Métricas Actuales (2025-11-23):
| Componente | Meta Documentada | Realidad | Gap | Estado |
|---|---|---|---|---|
| Overall | 87% | 13% | -74% | 🔴 CRÍTICO |
| Backend | 89% | 17% | -72% | 🔴 CRÍTICO |
| Frontend | 88% | 8% | -80% | 🔴 CRÍTICO |
| Database | N/A | 0% | N/A | 🔴 CRÍTICO |
Causa raíz: Valores originales eran estimaciones optimistas del inicio del proyecto, no mediciones reales.
Detalle por Módulo
Módulos Core (Críticos)
| Módulo | Epic | Coverage | Riesgo | Prioridad |
|---|---|---|---|---|
| Autenticación | EAI-001 | 18% | 🔴 ALTO | P0 |
| Gamificación | EAI-003 | 25% | 🔴 ALTO | P0 |
| Actividades | EAI-002 | 20% | 🟠 MEDIO | P1 |
| Portal Maestros | EXT-001 | 12% | 🔴 ALTO | P1 |
Módulos con Tests Parciales
| Módulo | Epic | Coverage | Prioridad |
|---|---|---|---|
| Analytics | EAI-004 | 10% | P1 |
| Admin Base | EAI-005 | 15% | P1 |
| Notificaciones | EXT-003 | 15% | P2 |
| Reportes | EXT-005 | 12% | P2 |
Módulos con Tests Mínimos
| Módulo | Epic | Coverage | Estado |
|---|---|---|---|
| Config Sistema | EAI-006 | 8% | P2 |
| Perfiles | EXT-004 | 10% | P2 |
| CMS Contenido | EXT-006 | 10% | P2 |
| LTI Integration | EXT-007 | 5% | P3 |
| White Label | EXT-008 | 3% | P3 |
| Peer Challenges | EXT-009 | 8% | P3 |
| Parent Portal | EXT-010 | 5% | P3 |
Módulos Especiales
| Módulo | Epic | Coverage | Observación |
|---|---|---|---|
| Migración BD | EMR-001 | 92%* | *Scripts de migración, no funcionalidad |
Impacto del Gap
Riesgos actuales:
- 🔴 Regresiones no detectadas: Cambios pueden romper funcionalidad sin alertas
- 🔴 Refactoring peligroso: Difícil mejorar código sin romper features
- 🔴 Onboarding lento: Nuevos devs temen tocar código sin tests
- 🔴 Deuda técnica: Crecimiento acelerado de deuda
Impacto en negocio:
- ⚠️ Bugs en producción más frecuentes
- ⚠️ Tiempo de desarrollo más lento (miedo a cambios)
- ⚠️ Costo de QA manual elevado
- ⚠️ Confianza stakeholders afectada
🎯 OBJETIVO
Meta Global
Alcanzar 88% overall coverage en 12 meses (Q4 2026)
| Fase | Trimestre | Meta Overall | Incremento |
|---|---|---|---|
| Actual | Q4 2025 | 13% | Baseline |
| Fase 1 | Q1 2026 | 40% | +27% |
| Fase 2 | Q2 2026 | 60% | +20% |
| Fase 3 | Q3 2026 | 75% | +15% |
| Fase 4 | Q4 2026 | 88% | +13% |
Estrategia: Incrementos sostenibles de ~15-20% por trimestre
Metas por Componente
| Componente | Actual | Q1 2026 | Q2 2026 | Q3 2026 | Q4 2026 (Meta) |
|---|---|---|---|---|---|
| Backend | 17% | 45% | 65% | 80% | 92% |
| Frontend | 8% | 35% | 55% | 70% | 87% |
| Database | 0% | 20% | 40% | 65% | 85% |
📅 ROADMAP POR FASES
FASE 1: Q1 2026 - Tests Críticos P0 (Enero-Marzo)
Meta: 40% overall coverage (+27%)
Sprint 1-2 (Enero 2026): Gamificación Core
Módulos:
- ✅ EAI-003: Gamificación (25% → 65%)
Áreas de enfoque:
Backend (45% → 75%):
achievements.service.ts- Tests de lógica de achievementscheck_and_unlock_achievement()- 8 testsaward_achievement()- 5 testsget_user_achievements()- 4 tests
coins.service.ts- Tests de ML Coinsaward_coins()con multiplicadores - 6 testsspend_coins()validaciones - 5 testsget_balance()- 3 tests
ranks.service.ts- Tests de rangos mayasupdate_user_rank()- 7 testsget_rank_multiplier()- 4 testscheck_promotion_eligibility()- 6 tests
Frontend (15% → 60%):
AchievementCard.tsx- Renderizado y estadosRankProgress.tsx- Cálculo de progresoCoinsDisplay.tsx- Formateo y animacionesuseAchievementshook - Lógica de estado
Database (0% → 30%):
check_and_unlock_achievement()function - 8 tests pgTAPaward_ml_coins()function - 6 tests pgTAPupdate_user_rank()function - 7 tests pgTAP- RLS policies de
achievements- 5 tests pgTAP
Esfuerzo: 3 semanas, 2 devs full-time
Sprint 3-4 (Febrero 2026): Autenticación y Progreso
Módulos:
- ✅ EAI-001: Autenticación (18% → 55%)
- ✅ EAI-002: Actividades - Progreso (20% → 50%)
Áreas de enfoque:
Backend Auth (30% → 70%):
auth.service.ts- Flujos de autenticación- Login/Logout - 10 tests
- JWT validation - 8 tests
- Refresh tokens - 6 tests
- Password reset - 8 tests
roles.service.ts- Gestión de roles- Role assignment - 5 tests
- Permissions check - 8 tests
tenant.service.ts- Multi-tenancy- Tenant isolation - 10 tests (crítico)
Backend Progress (30% → 60%):
exercise-attempts.service.ts- Submit attempt - 8 tests
- Calculate score - 6 tests
- Award XP - 5 tests
module-progress.service.ts- Update progress - 7 tests
- Check completion - 5 tests
Frontend (10% → 45%):
LoginForm.tsx- Validación y erroresuseAuthhook - Estados de autenticaciónExerciseSubmission.tsx- Envío de respuestasProgressTracker.tsx- Visualización progreso
Database (0% → 25%):
- RLS policies de
auth.users- 10 tests (crítico) - RLS policies de
exercise_attempts- 8 tests update_module_progress()function - 7 tests- Triggers de auditoría - 5 tests
Esfuerzo: 3 semanas, 2 devs full-time
Sprint 5-6 (Marzo 2026): Portal Maestros
Módulos:
- ✅ EXT-001: Portal Maestros (12% → 45%)
Áreas de enfoque:
Backend (15% → 60%):
assignments.service.ts- Create assignment - 6 tests
- Assign to students - 8 tests
- Grade submissions - 10 tests
classroom.service.ts- Manage students - 7 tests
- Classroom stats - 5 tests
Frontend (10% → 40%):
AssignmentForm.tsx- Creación asignacionesStudentList.tsx- Gestión estudiantesGradingInterface.tsx- Calificación
Database (0% → 20%):
- RLS policies de
assignments- 8 tests - RLS policies de
classrooms- 6 tests assign_to_students()function - 5 tests
Esfuerzo: 3 semanas, 1 dev full-time
Resumen Q1 2026:
- Coverage: 13% → 40% (+27%)
- Backend: 17% → 45% (+28%)
- Frontend: 8% → 35% (+27%)
- Database: 0% → 20% (+20%)
- Esfuerzo total: 9 semanas-dev
- Inversión: ~2.5 devs full-time x 3 meses
FASE 2: Q2 2026 - Tests Importantes P1 (Abril-Junio)
Meta: 60% overall coverage (+20%)
Sprint 7-8 (Abril 2026): Actividades Educativas
Módulos:
- ✅ EAI-002: Actividades completo (50% → 70%)
- ✅ EAI-004: Analytics (10% → 40%)
Backend Actividades (60% → 80%):
- Validadores de ejercicios
- Multiple choice validator - 8 tests
- True/False validator - 6 tests
- Drag&Drop validator - 10 tests
- Essay validator - 12 tests
exercise.service.ts- Get exercise by type - 5 tests
- Filter by difficulty - 6 tests
- Exercise metadata - 4 tests
Backend Analytics (15% → 50%):
analytics.service.ts- User stats calculation - 10 tests
- Module completion rates - 8 tests
- Time spent analytics - 6 tests
reports.service.ts- Generate reports - 8 tests
- Export functionality - 5 tests
Frontend (35% → 55%):
- Componentes de mecánicas de ejercicios (10 componentes)
AnalyticsDashboard.tsxReportsView.tsx
Database (20% → 45%):
- Validadores de ejercicios functions - 15 tests
- Analytics views - 8 tests
- Aggregation functions - 10 tests
Esfuerzo: 3 semanas, 2 devs
Sprint 9-10 (Mayo 2026): Admin y Notificaciones
Módulos:
- ✅ EAI-005: Admin Base (15% → 50%)
- ✅ EXT-003: Notificaciones (15% → 50%)
Backend (20% → 65%):
admin.service.ts- Gestión sistemanotifications.service.ts- Envío notificacionesnotification-queue.service.ts- Queue management- Email/SMS templates - Tests
Frontend (10% → 45%):
- Admin panels (5 componentes)
- Notification center
- Notification preferences
Database (20% → 50%):
send_notification()function - 8 testsqueue_notification()function - 6 tests- Notification triggers - 10 tests
Esfuerzo: 3 semanas, 2 devs
Sprint 11-12 (Junio 2026): Reportes y Perfiles
Módulos:
- ✅ EXT-005: Reportes (12% → 45%)
- ✅ EXT-004: Perfiles (10% → 45%)
Backend (17% → 60%):
reports.service.tscompletoprofiles.service.ts- Export/Import functionality
- PDF generation tests
Frontend (8% → 40%):
- Report builder
- Profile editor
- Export interfaces
Database (40% → 60%):
- Report generation functions - 12 tests
- Profile RLS policies - 8 tests
- Data aggregation - 10 tests
Esfuerzo: 3 semanas, 2 devs
Resumen Q2 2026:
- Coverage: 40% → 60% (+20%)
- Backend: 45% → 65% (+20%)
- Frontend: 35% → 55% (+20%)
- Database: 20% → 40% (+20%)
- Esfuerzo total: 9 semanas-dev
- Inversión: ~2 devs full-time x 3 meses
FASE 3: Q3 2026 - Tests Avanzados P2 (Julio-Septiembre)
Meta: 75% overall coverage (+15%)
Sprint 13-14 (Julio 2026): Contenido y Config
Módulos:
- ✅ EAI-006: Config Sistema (8% → 40%)
- ✅ EXT-006: CMS Contenido (10% → 45%)
Backend (20% → 70%):
content-management.service.tssystem-config.service.ts- Content versioning tests
- Configuration validation
Frontend (10% → 50%):
- Content editor
- System settings
- Configuration UI
Database (40% → 70%):
- Content CRUD functions - 15 tests
- Config validation functions - 10 tests
- Versioning triggers - 8 tests
Esfuerzo: 3 semanas, 2 devs
Sprint 15-16 (Agosto 2026): Integraciones
Módulos:
- ✅ EXT-007: LTI Integration (5% → 35%)
- ✅ EXT-008: White Label (3% → 35%)
Backend (10% → 60%):
lti.service.ts- LTI 1.3 flowswhite-label.service.ts- Branding- OAuth flows tests
- Multi-tenant styling
Frontend (5% → 40%):
- LTI launch components
- White label configuration
- Theme switcher
Database (40% → 75%):
- LTI integration tables tests - 12 tests
- White label config tests - 10 tests
- Tenant isolation RLS - 15 tests
Esfuerzo: 3 semanas, 2 devs
Sprint 17-18 (Septiembre 2026): Features Sociales
Módulos:
- ✅ EXT-009: Peer Challenges (8% → 40%)
- ✅ EXT-010: Parent Portal (5% → 40%)
Backend (13% → 65%):
challenges.service.tsparent-portal.service.ts- Challenge matchmaking
- Parent notifications
Frontend (7% → 45%):
- Challenge interface
- Parent dashboard
- Social features
Database (70% → 85%):
- Challenge functions - 15 tests
- Parent access RLS - 12 tests
- Social features tests - 10 tests
Esfuerzo: 3 semanas, 2 devs
Resumen Q3 2026:
- Coverage: 60% → 75% (+15%)
- Backend: 65% → 80% (+15%)
- Frontend: 55% → 70% (+15%)
- Database: 40% → 65% (+25%)
- Esfuerzo total: 9 semanas-dev
- Inversión: ~2 devs full-time x 3 meses
FASE 4: Q4 2026 - Refinamiento y Meta (Octubre-Diciembre)
Meta: 88% overall coverage (+13%)
Sprint 19-20 (Octubre 2026): Completar Database
Enfoque: Database al 85%
Database (65% → 85%):
- Completar tests de funciones faltantes
- Tests exhaustivos de RLS policies (crítico)
- Tests de triggers y constraints
- Tests de índices y performance
- Tests de migraciones
Áreas críticas:
- All RLS policies (100% coverage)
- Audit logging functions
- Data integrity constraints
- Cascade delete behaviors
Esfuerzo: 3 semanas, 1 dev especializado DB
Sprint 21-22 (Noviembre 2026): Completar Frontend
Enfoque: Frontend al 87%
Frontend (70% → 87%):
- Tests de componentes faltantes
- Tests de hooks personalizados
- Tests de stores (Zustand)
- Tests de integración E2E
- Tests de accessibility
Áreas críticas:
- Flujos críticos de usuario
- Error boundaries
- Loading states
- Form validations
- Responsive behavior
Esfuerzo: 3 semanas, 2 devs frontend
Sprint 23-24 (Diciembre 2026): Completar Backend y E2E
Enfoque: Backend al 92% + E2E completos
Backend (80% → 92%):
- Completar services faltantes
- Edge cases y error handling
- Integration tests entre módulos
- Performance tests
- Security tests
E2E (Cypress):
- Flujo completo estudiante (registro → certificación)
- Flujo completo maestro (asignación → calificación)
- Flujo completo admin (configuración → reportes)
- Tests cross-browser
- Tests de regresión críticos
Esfuerzo: 3 semanas, 2 devs
Resumen Q4 2026:
- Coverage: 75% → 88% (+13%)
- Backend: 80% → 92% (+12%)
- Frontend: 70% → 87% (+17%)
- Database: 65% → 85% (+20%)
- Esfuerzo total: 9 semanas-dev
- Inversión: ~1.5 devs full-time x 3 meses
📊 INVERSIÓN TOTAL
Recursos Requeridos
| Trimestre | Devs Full-Time Equiv. | Semanas | Total Semanas-Dev |
|---|---|---|---|
| Q1 2026 | 2.5 | 12 | 30 |
| Q2 2026 | 2.0 | 12 | 24 |
| Q3 2026 | 2.0 | 12 | 24 |
| Q4 2026 | 1.5 | 12 | 18 |
| TOTAL | **- | 48 semanas | 96 semanas-dev |
Promedio: 2 devs dedicados a testing durante 12 meses
Presupuesto Estimado
⚠️ A DEFINIR POR TECH LEAD Y PRODUCT OWNER
Estimación preliminar:
| Concepto | Cantidad | Costo Unitario | Total |
|---|---|---|---|
| Desarrolladores (testing) | 2 devs x 12 meses | [TBD]/mes | [TBD] |
| QA Engineer (soporte) | 1 QA x 6 meses | [TBD]/mes | [TBD] |
| Herramientas Testing | |||
| - Jest/Vitest (incluido) | - | $0 | $0 |
| - Cypress Cloud | 12 meses | [TBD]/mes | [TBD] |
| - pgTAP setup | Una vez | [TBD] | [TBD] |
| CI/CD adicional | Compute time | [TBD] | [TBD] |
| Capacitación | Testing best practices | [TBD] | [TBD] |
| Contingencia (15%) | - | - | [TBD] |
| TOTAL ESTIMADO | 12 meses | - | [TBD] |
🛠️ HERRAMIENTAS Y FRAMEWORKS
Backend Testing
Framework principal: Jest
- Unit tests de services
- Integration tests de controllers
- Mocking de dependencies
Herramientas adicionales:
- Supertest (API testing)
- TypeORM test utilities
- Faker.js (test data)
Frontend Testing
Framework principal: Vitest + React Testing Library
- Unit tests de componentes
- Unit tests de hooks
- Unit tests de stores (Zustand)
E2E: Cypress
- Flujos críticos de usuario
- Cross-browser testing
- Visual regression testing
Herramientas adicionales:
- @testing-library/user-event
- MSW (Mock Service Worker)
- Storybook (visual testing)
Database Testing
Framework: pgTAP
- Tests de funciones PostgreSQL
- Tests de triggers
- Tests de RLS policies
- Tests de constraints
Setup:
CREATE EXTENSION pgtap;
-- Ejemplo test
SELECT plan(5);
SELECT has_table('gamification_system', 'achievements',
'achievements table exists');
SELECT has_function('gamification_system', 'check_and_unlock_achievement',
ARRAY['uuid', 'integer'], 'function exists with correct signature');
SELECT finish();
CI/CD Integration:
- Tests ejecutados en pipeline
- Test database separada
- Rollback automático post-tests
📏 MÉTRICAS Y KPIs
Métricas Principales (Semanales)
- Coverage Overall (meta: +2% por semana en promedio)
- Tests Agregados (meta: 50-100 tests nuevos por semana)
- Tests Fallando (meta: < 5% del total)
- Tiempo Ejecución Tests (meta: < 10 minutos total)
Métricas de Calidad (Mensuales)
- Bugs en Producción (meta: -30% vs baseline)
- Bugs Detectados en Tests (meta: +50% vs QA manual)
- Regresiones Detectadas (meta: 100% antes de producción)
- Tiempo Promedio Fix Bug (meta: -40%)
Métricas de Proceso (Trimestrales)
- Velocity Desarrollo (meta: +20% con tests)
- Confianza Desarrolladores (meta: 8/10 en encuestas)
- Tiempo Onboarding (meta: -30%)
- Refactoring Rate (meta: +50%)
🚨 POLÍTICA DE COVERAGE PARA NUEVOS FEATURES
Obligatorio (Enforceable en CI/CD)
A partir de 2026-01-01:
-
Nuevos features: Coverage mínimo 70%
- Backend services: ≥ 80%
- Frontend components: ≥ 70%
- Database functions: ≥ 85%
-
Bug fixes críticos: Test de regresión obligatorio
- Test debe reproducir el bug
- Test debe pasar después del fix
- Test debe agregarse al suite permanente
-
Refactoring: Coverage no puede disminuir
- Si coverage era 60%, debe permanecer ≥ 60%
- Preferiblemente aumentar durante refactoring
-
Pull Requests:
- CI/CD bloquea merge si coverage disminuye > 2%
- Excepción requiere aprobación de Tech Lead
- Comentario obligatorio justificando excepción
Recomendado (Best Practices)
-
TDD para lógica compleja
- Gamificación (cálculos de XP, rangos)
- Validadores de ejercicios
- Lógica de negocio crítica
-
Tests de integración para flujos críticos
- Login/Logout
- Envío de ejercicio
- Asignación de tareas
-
E2E para happy paths
- Registro → Completar módulo → Certificación
- Maestro crea asignación → Estudiante completa → Calificación
CI/CD Configuration
# .github/workflows/test-coverage.yml
name: Test Coverage Check
on: [pull_request]
jobs:
coverage:
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v3
- name: Run tests with coverage
run: npm run test:coverage
- name: Check coverage thresholds
run: |
npm run coverage:check
# Fails if:
# - Overall < 70% (nuevos features)
# - Coverage decreased > 2%
- name: Comment PR with coverage
uses: codecov/codecov-action@v3
with:
files: ./coverage/coverage-summary.json
🎓 CAPACITACIÓN Y SOPORTE
Capacitación Inicial (Enero 2026)
Workshop: Testing Best Practices (2 días)
Día 1: Backend Testing
- Jest fundamentals
- Mocking strategies
- Integration testing
- Database testing con pgTAP
Día 2: Frontend Testing
- Vitest + React Testing Library
- Component testing patterns
- Hooks testing
- E2E con Cypress
Materiales:
- 📚 Guía interna de testing
- 🎥 Videos de referencia
- 💻 Ejemplos de código (repo samples)
- 📋 Checklists de testing
Soporte Continuo
Office Hours: Semanal (1 hora)
- Tech Lead disponible para consultas
- Revisión de tests complejos
- Pair programming si necesario
Code Reviews:
- Enfoque en calidad de tests
- Feedback constructivo
- Compartir best practices
Knowledge Sharing:
- Lightning talks mensuales
- Compartir casos interesantes
- Documentar patterns comunes
⚠️ RIESGOS Y MITIGACIONES
Riesgos Identificados
| Riesgo | Probabilidad | Impacto | Mitigación |
|---|---|---|---|
| Resistencia del equipo | Media | Alto | Capacitación, pair programming, celebrar wins |
| Tiempo desarrollo aumenta | Alta | Medio | Inicial sí, luego disminuye. Medir velocity |
| Tests frágiles (flaky) | Media | Medio | Code review estricto, retry logic, stability checks |
| Mantenimiento tests costoso | Media | Medio | DRY principles, factories, buenos naming |
| CI/CD lento | Media | Alto | Paralelización, caching, tests selectivos |
| Coverage inflation | Baja | Alto | Reviews manual, medir calidad no solo cantidad |
| Recursos insuficientes | Media | Alto | Priorizar P0/P1, hiring anticipado, contractors |
Plan de Contingencia
Si se retrasa Q1:
- Extender Q1 a 4 meses (Abril)
- Posponer Q2 un mes
- Ajustar meta final a 85% (realistic)
Si resistencia del equipo es alta:
- Sesiones 1-on-1 con Tech Lead
- Incentivar contributions
- Mostrar beneficios concretos (menos bugs)
Si CI/CD se vuelve muy lento (> 15 min):
- Implementar test sharding
- Caching agresivo de dependencies
- Tests selectivos (solo archivos cambiados)
📊 DASHBOARD DE PROGRESO
Métricas en Tiempo Real
Herramienta: Codecov / SonarQube
Dashboard incluye:
- 📈 Coverage overall trend (semanal)
- 📊 Coverage por módulo (comparación)
- 🎯 Progreso vs meta trimestral
- 🐛 Tests fallando actualmente
- ⏱️ Tiempo ejecución tests
- 📝 Tests agregados/eliminados por semana
Acceso: Público para todo el equipo
Reportes Mensuales
Responsable: Tech Lead
Contenido:
- Estado actual vs meta
- Módulos con mayor progreso
- Módulos retrasados (y por qué)
- Bugs detectados por tests vs QA manual
- Velocity antes/después de tests
- Próximas prioridades
Audiencia: Tech Lead, Product Owner, Equipo de desarrollo
🎯 CRITERIOS DE ÉXITO
Por Fase
Q1 2026 Exitoso si:
- ✅ Coverage overall ≥ 40%
- ✅ Módulos críticos (auth, gamificación) ≥ 65%
- ✅ Database coverage ≥ 20%
- ✅ Zero regresiones críticas en producción
Q2 2026 Exitoso si:
- ✅ Coverage overall ≥ 60%
- ✅ Backend ≥ 65%
- ✅ Frontend ≥ 55%
- ✅ Bugs en producción -20% vs baseline
Q3 2026 Exitoso si:
- ✅ Coverage overall ≥ 75%
- ✅ Database ≥ 65%
- ✅ Todos los módulos core ≥ 70%
- ✅ Velocity desarrollo +15%
Q4 2026 Exitoso si:
- ✅ Coverage overall ≥ 88% (meta alcanzada)
- ✅ Backend ≥ 92%
- ✅ Frontend ≥ 87%
- ✅ Database ≥ 85%
- ✅ Política de 70% para nuevos features enforced
Métricas de Negocio
Al finalizar 2026:
- 📉 Bugs en producción: -50% vs 2025
- 📈 Velocity desarrollo: +25% vs inicio
- ⏱️ Tiempo promedio fix bug: -40%
- 👥 Satisfacción equipo: 8/10
- 💰 Costo QA manual: -30%
📎 REFERENCIAS
Documentación Interna
- Gap Analysis: REPORTE-COHERENCIA-DOCUMENTACION-CODIGO-2025-11-23.md
- Gap-4 Detail: REPORTE-ACTUALIZACION-TEST-COVERAGE-GAP4-2025-11-23.md
- 17 TRACEABILITY.yml: Métricas actualizadas con coverage real
Best Practices
- Jest Best Practices: https://jestjs.io/docs/tutorial-async
- React Testing Library: https://testing-library.com/docs/react-testing-library/intro/
- pgTAP Documentation: https://pgtap.org/documentation.html
- Cypress Best Practices: https://docs.cypress.io/guides/references/best-practices
Herramientas
- Codecov: https://about.codecov.io/
- SonarQube: https://www.sonarqube.org/
- Cypress Cloud: https://www.cypress.io/cloud
🔄 CHANGELOG
[1.0] - 2025-11-23
Creado por: Architecture-Analyst + Tech Lead (pendiente)
Contenido inicial:
- Situación actual documentada (gap -74%)
- Roadmap 12 meses (Q1-Q4 2026)
- Metas por fase definidas
- Inversión estimada (96 semanas-dev)
- Política de coverage para nuevos features
- Herramientas y frameworks especificados
- Métricas y KPIs establecidos
- Riesgos identificados con mitigaciones
Referencias:
- GAP-4: Test coverage metrics incorrectos
- REPORTE-ACTUALIZACION-TEST-COVERAGE-GAP4-2025-11-23.md
- 17 TRACEABILITY.yml con métricas reales
Estado: DRAFT - Pendiente de aprobación por Tech Lead y Product Owner
✅ PRÓXIMOS PASOS INMEDIATOS
- Tech Lead: Revisar y aprobar roadmap
- Tech Lead + Product Owner: Definir presupuesto y priorizar vs otros proyectos
- Tech Lead: Asignar 2 devs para Q1 2026 (Enero inicio)
- Architecture-Analyst: Programar capacitación (Workshop 2 días - Enero)
- Tech Lead: Configurar CI/CD con thresholds de coverage
- Tech Lead: Crear dashboard de progreso (Codecov/SonarQube)
Versión: 1.0 DRAFT Próxima revisión: Tras aprobación de Tech Lead Aprobación pendiente: Tech Lead, Product Owner Prioridad: 🔴 CRÍTICA
FIN DEL ROADMAP