workspace/projects/gamilit/docs/README.md
rckrdmrd 608e1e2a2e
Some checks are pending
CI Pipeline / changes (push) Waiting to run
CI Pipeline / core (push) Blocked by required conditions
CI Pipeline / trading-backend (push) Blocked by required conditions
CI Pipeline / trading-data-service (push) Blocked by required conditions
CI Pipeline / trading-frontend (push) Blocked by required conditions
CI Pipeline / erp-core (push) Blocked by required conditions
CI Pipeline / erp-mecanicas (push) Blocked by required conditions
CI Pipeline / gamilit-backend (push) Blocked by required conditions
CI Pipeline / gamilit-frontend (push) Blocked by required conditions
Multi-project update: gamilit, orchestration, trading-platform
Gamilit:
- Backend: Teacher services, assignments, gamification, exercise submissions
- Frontend: Admin/Teacher/Student portals, module 4-5 mechanics, monitoring
- Database: DDL functions, seeds for dev/prod, auth/gamification schemas
- Docs: Architecture, features, guides cleanup and reorganization

Core/Orchestration:
- New workspace directives index
- Documentation directive

Trading-platform:
- Database seeds and inventory updates
- Tech leader validation report

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2025-12-18 07:17:46 -06:00

525 lines
18 KiB
Markdown
Raw Blame History

This file contains invisible Unicode characters

This file contains invisible Unicode characters that are indistinguishable to humans but may be processed differently by a computer. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# 📚 Documentación del Proyecto GAMILIT
**Proyecto:** GAMILIT - Plataforma Educativa Gamificada
**Período:** Agosto 2024 - Noviembre 2025
**Presupuesto Total:** $601,600 MXN (incluye $15,000 USD @ $20/USD)
**Story Points:** 714 SP
**Estado:** ✅ 75% Completado (12/16 épicas completas MVP)
**Última actualización:** 2025-12-18
---
## 🎯 ALCANCE MVP DEFINIDO
### ✅ EN ALCANCE MVP
| Componente | Alcance | Estado |
|-----------|---------|--------|
| **Módulos Educativos** | Módulos 1-3 (15 ejercicios) | ✅ Implementados |
| **Portal Student** | 10 páginas funcionales | ✅ Core completo |
| **Portal Teacher** | 10 páginas funcionales (US-PM-000 a US-PM-006) | ✅ Funcional |
| **Portal Admin** | 7 páginas funcionales (P0+P1: AE-000 a AE-008) | ✅ Funcional |
| **Épicas MVP** | EXT-001 a EXT-006 (100%) | ✅ Completas |
| **Sistema Gamificación** | Rangos Maya, ML Coins, Achievements | ✅ v2.3.0 |
| **Base de Datos** | 16 schemas modulares | ✅ Migrada |
### ✅ RECIENTEMENTE IMPLEMENTADO (2025-11-29)
| Componente | Descripción | Estado |
|-----------|-------------|--------|
| **Módulos 4-5** | Lectura Digital + Producción (8 ejercicios) | ✅ Implementados (revisión manual) |
| **Admin P2** | US-AE-005, US-AE-007 | ✅ Implementados |
### ⏳ EN BACKLOG (Fuera del MVP)
| Componente | Descripción | Estado |
|-----------|-------------|--------|
| **Épicas Parciales** | EXT-007 a EXT-011 (30-50%) | ⏳ Parciales |
| **10 tipos ejercicios** | Mecánicas avanzadas | ⏳ Documentados |
---
## 🗺️ Mapa de Navegación
### Documentación Organizada por Fases
El proyecto está documentado en **4 fases consecutivas** más carpetas de **implementación específica** y **referencia**:
```
docs/
├── 00-vision-general/ (Referencia - Visión y Arquitectura)
├── 01-fase-alcance-inicial/ (Fase 1 - Fundamentos MVP)
├── 02-fase-robustecimiento/ (Fase 2 - BD Modular MVP)
├── 03-fase-extensiones/ (Fase 3 - Features Enterprise MVP)
├── 04-fase-backlog/ (Fase 4 - ⏳ Backlog Futuro)
├── sistema-recompensas/ (Implementación v2.3.0)
├── student-portal/ (Portal Estudiante)
├── database/ (Documentación BD)
├── 90-transversal/ (Documentación Transversal)
├── 95-guias-desarrollo/ (Guías de Desarrollo)
├── 96-quick-reference/ (Referencias Rápidas)
├── 97-adr/ (Architecture Decision Records)
└── 98-standards/ (Estándares del Proyecto)
```
---
## 📂 Fase 1: Alcance Inicial
**Duración:** Mes 1 (Agosto 2024)
**Presupuesto:** $110,000 MXN
**Story Points:** 230 SP
**Épicas:** 5 completas ✅
### 📁 [01-fase-alcance-inicial/](./01-fase-alcance-inicial/)
**Objetivo:** Establecer fundamentos de la plataforma
| Épica | Descripción | Estado | Documentación |
|-------|-------------|--------|---------------|
| **EAI-001** | Fundamentos (Auth, Infraestructura) | ✅ 100% | [📂](./01-fase-alcance-inicial/EAI-001-fundamentos/) |
| **EAI-002** | Actividades (6 mecánicas de ejercicios) | ✅ 100% | [📂](./01-fase-alcance-inicial/EAI-002-actividades/) |
| **EAI-003** | Gamificación (XP, ML Coins, Rangos Maya) | ✅ 100% | [📂](./01-fase-alcance-inicial/EAI-003-gamificacion/) |
| **EAI-004** | Analytics (Métricas básicas) | ✅ 100% | [📂](./01-fase-alcance-inicial/EAI-004-analytics/) |
| **EAI-005** | Admin Base (Panel básico) | ✅ 100% | [📂](./01-fase-alcance-inicial/EAI-005-admin-base/) |
**Resultados Fase 1:**
- ✅ Arquitectura base implementada
- ✅ 6 módulos backend funcionales
- ✅ ~60 componentes frontend
- ✅ 6 schemas de BD
- ⚠️ Test coverage: 18% (vs 88% objetivo)
**📄 Ver detalles completos:** [Fase 1 README](./01-fase-alcance-inicial/README.md)
---
## 📂 Fase 2: Robustecimiento y Migración BD
**Duración:** Mes 2 (Septiembre 2024)
**Presupuesto:** $50,000 MXN
**Story Points:** 80 SP
**Épicas:** 1 técnica ✅
### 📁 [02-fase-robustecimiento/](./02-fase-robustecimiento/)
**Objetivo:** Transformar BD de plana a modular
| Épica | Descripción | Estado | Documentación |
|-------|-------------|--------|---------------|
| **EMR-001** | Migración BD (1 → 14 schemas) | ✅ 100% | [📂](./02-fase-robustecimiento/EMR-001-migracion-bd/) |
**Transformación realizada:**
- **Antes:** 1 schema, 44 tablas, estructura plana
- **Después:** 16 schemas, 123 tablas, arquitectura modular
**Logros destacados:**
-**Zero downtime migration** (blue-green deployment)
- ✅ Performance +65% mejora
- ✅ 185 políticas RLS implementadas
- ✅ 127 índices estratégicos
**Métricas de Performance:**
- Query promedio: 250ms → **87ms** (-65%)
- Joins complejos: 1200ms → **320ms** (-73%)
- Throughput: 100 req/s → **280 req/s** (+180%)
**📄 Ver detalles completos:** [Fase 2 README](./02-fase-robustecimiento/README.md)
---
## 📂 Fase 3: Extensiones (MVP)
**Duración:** Mes 3-4 (Octubre-Noviembre 2024)
**Presupuesto:** $141,600 MXN
**Story Points:** 304 SP
**Épicas MVP:** 6 completas ✅
### 📁 [03-fase-extensiones/](./03-fase-extensiones/)
**Objetivo:** Features enterprise-ready para MVP
#### ✅ Épicas MVP (100% Completas)
| Épica | Descripción | Estado | Documentación |
|-------|-------------|--------|---------------|
| **EXT-001** | Portal Maestros (Dashboard completo) | ✅ 100% | [📂](./03-fase-extensiones/EXT-001-portal-maestros/) |
| **EXT-002** | Admin Extendido (Tools avanzadas) | ✅ 100% | [📂](./03-fase-extensiones/EXT-002-admin-extendido/) |
| **EXT-003** | Notificaciones (Multi-canal) | ✅ 100% | [📂](./03-fase-extensiones/EXT-003-notificaciones/) |
| **EXT-004** | Perfiles Avanzados | ✅ 100% | [📂](./03-fase-extensiones/EXT-004-perfiles/) |
| **EXT-005** | Reportería (PDF/Excel) | ✅ 100% | [📂](./03-fase-extensiones/EXT-005-reportes/) |
| **EXT-006** | CMS de Contenido | ✅ 100% | [📂](./03-fase-extensiones/EXT-006-contenido/) |
**Resultados Fase 3 MVP:**
- ✅ Portal maestros funcional (crítico para adopción institucional)
- ✅ Admin tools enterprise
- ✅ Sistema de notificaciones multi-canal
- ✅ 6/6 épicas MVP completadas
**📄 Ver detalles completos:** [Fase 3 README](./03-fase-extensiones/README.md)
---
## 📂 Fase 4: Backlog (Fuera del MVP)
**Estado:** ⏳ Planificación y Diseño
**Épicas:** 5 parciales (30-50%)
**Módulos:** 2 pendientes (Módulos 4-5)
### 📁 [04-fase-backlog/](./04-fase-backlog/)
**Objetivo:** Funcionalidad futura diseñada pero no implementada en MVP
#### ⏳ Épicas Parciales (Backlog)
| Épica | Descripción | Avance | Documentación |
|-------|-------------|--------|---------------|
| **EXT-007** | LTI Integration | ⏳ 40% | [📂](./03-fase-extensiones/EXT-007-lti-integration/) |
| **EXT-008** | White Label | ⏳ 30% | [📂](./03-fase-extensiones/EXT-008-white-label/) |
| **EXT-009** | Peer Challenges | ⏳ 50% | [📂](./03-fase-extensiones/EXT-009-peer-challenges/) |
| **EXT-010** | Parent Notifications | ⏳ 35% | [📂](./03-fase-extensiones/EXT-010-parent-notifications/) |
| **EXT-011** | Parent Portal | ⏳ 35% | [📂](./03-fase-extensiones/EXT-011-parent-portal/) |
#### ✅ Módulos Educativos M4-M5 (Implementados 2025-11-29)
| Módulo | Descripción | Ejercicios | Estado |
|--------|-------------|------------|--------|
| **Módulo 4** | Lectura Digital y Multimodal | 5 | ✅ Implementado (revisión manual por docentes) |
| **Módulo 5** | Producción y Expresión | 3 | ✅ Implementado (revisión manual por docentes) |
> **Nota:** M4-M5 requieren evaluación manual por docentes. Ver [ReviewPanel](../apps/frontend/src/apps/teacher/pages/ReviewPanel/) para el panel de revisión.
#### ✅ Admin Portal P2 (Implementado 2025-11-28)
| User Story | Descripción | Estado |
|-----------|-------------|--------|
| US-AE-005 | Parametrización Gamificación | ✅ Implementado |
| US-AE-007 | Asignación de Grupos a Maestros | ✅ Implementado |
> **Nota:** Ver [Manual Portal Admin](./99-finiquito/Manual_Portal_Administrador_ACTUALIZADO.md) para documentación completa.
**📄 Ver detalles completos:** [Fase 4 README](./04-fase-backlog/README.md)
---
## 📂 Sistema de Recompensas (Implementación Detallada)
**Versión:** v2.3.0 (Noviembre 2025)
**Épica origen:** EAI-003 (Gamificación)
**Test Coverage:** 95% backend, 88% frontend
**Estado:** ✅ PRODUCCIÓN
### 📁 [sistema-recompensas/](./sistema-recompensas/)
**Objetivo:** Documentación exhaustiva de la implementación del sistema de recompensas automatizado
Esta carpeta contiene la **implementación v2.3.0** del sistema que gestiona:
- Cálculo automático de XP y ML Coins
- Actualización de estadísticas vía trigger de BD
- Tracking de progreso por módulo
- Performance optimizado (<200ms)
**Documentos clave:**
| Documento | Descripción | Completitud |
|-----------|-------------|-------------|
| [README.md](./sistema-recompensas/README.md) | Índice maestro y quick start | 100% |
| [00-INVENTARIO-CAMBIOS.md](./sistema-recompensas/00-INVENTARIO-CAMBIOS.md) | Trazabilidad de 15 archivos | 100% |
| [01-ARQUITECTURA-SISTEMA.md](./sistema-recompensas/01-ARQUITECTURA-SISTEMA.md) | 6 patrones de diseño | 95% |
| [02-FLUJO-END-TO-END.md](./sistema-recompensas/02-FLUJO-END-TO-END.md) | 12 pasos + timeline | 98% |
| [03-API-ENDPOINTS.md](./sistema-recompensas/03-API-ENDPOINTS.md) | 6 endpoints + JSON | 95% |
| [04-DATABASE-SCHEMA.md](./sistema-recompensas/04-DATABASE-SCHEMA.md) | 3 tablas + SQL trigger | 100% |
| [05-TEST-RESULTS.md](./sistema-recompensas/05-TEST-RESULTS.md) | 10/10 tests passed | 98% |
| [06-SEEDS-Y-DATOS-INICIALES.md](./sistema-recompensas/06-SEEDS-Y-DATOS-INICIALES.md) | 10 usuarios demo | 95% |
**Evolución del sistema:**
| Versión | Fecha | Performance | Test Coverage | Bugs |
|---------|-------|-------------|---------------|------|
| v1.0 | Ago 2024 | 450ms | 25% | 51 bugs |
| v2.0 | Oct 2024 | 250ms | 45% | 24 bugs |
| **v2.3.0** | **Nov 2025** | **85ms** | **95%** | **9 bugs** |
**Resultados v2.3.0:**
- Performance: -86% vs v1.0
- Tests: 10/10 passed (100%)
- Bugs críticos: 0
- NPS: 85 (Excelente)
**🔗 Conexión con EAI-003:**
Ver: [EVOLUCION-SISTEMA-RECOMPENSAS.md](./01-fase-alcance-inicial/EAI-003-gamificacion/implementacion/EVOLUCION-SISTEMA-RECOMPENSAS.md)
---
## 📊 Resumen Consolidado del Proyecto
### Cifras Globales MVP
| Métrica | MVP | Backlog | Total |
|---------|-----|---------|-------|
| **Archivos Markdown** | 145+ | 20+ | 165+ |
| **Épicas Completadas** | 12 (100%) | - | 12 |
| **Épicas Parciales (Backlog)** | - | 5 (30-50%) | 5 |
| **Módulos Educativos** | 3 | 2 | 5 |
| **Story Points MVP** | 614 SP | 100 SP | 714 SP |
| **Schemas BD** | 16 | - | 16 |
| **Tablas BD** | 123 | - | 123 |
| **Endpoints API MVP** | 417 | 20+ | 437+ |
| **Componentes Frontend** | 200+ | 30+ | 230+ |
### Alcance MVP Claro
| Componente | MVP | Backlog |
|-----------|--------|-----------|
| **Módulos Educativos** | M1-M3 (15 ejercicios) | M4-M5 (8 ejercicios) |
| **Épicas** | EXT-001 a EXT-006 | EXT-007 a EXT-011 |
| **Portal Admin** | P0+P1 (7 páginas) | P2 (2 páginas) |
| **Tipos de Ejercicios** | 15 mecánicas | 10 mecánicas |
### Estado de Test Coverage
| Componente | Fase 1 | Fase 2 | Fase 3 | v2.3.0 Sistema Recompensas |
|------------|--------|--------|--------|----------------------------|
| Backend | 18% | N/A | 18% | **95%** |
| Frontend | 18% | N/A | 18% | **88%** |
| BD/Triggers | 0% | 60% | 60% | **100%** |
** Brecha Crítica:** Test coverage general 18% vs 88% objetivo (-70%)
---
## 🎯 Métricas de Éxito
### Completitud de Funcionalidades
| Categoría | Completo | Parcial | Pendiente | Total |
|-----------|----------|---------|-----------|-------|
| **Autenticación** | 100% | - | - | 1/1 |
| **Contenido Educativo** | 100% | - | - | 1/1 |
| **Gamificación** | 100% | - | - | 1/1 |
| **Analytics** | 100% | - | - | 1/1 |
| **Admin Tools** | 100% | - | - | 2/2 |
| **Portal Maestros** | 100% | - | - | 1/1 |
| **Notificaciones** | 100% | - | - | 1/1 |
| **Reportería** | 100% | - | - | 1/1 |
| **CMS** | 100% | - | - | 1/1 |
| **Perfiles** | 100% | - | - | 1/1 |
| **BD Modular** | 100% | - | - | 1/1 |
| **LTI Integration** | - | 🟡 40% | - | 0/1 |
| **White Label** | - | 🟡 30% | - | 0/1 |
| **Peer Challenges** | - | 🟡 50% | - | 0/1 |
| **Parent Portal** | - | 🟡 35% | - | 0/1 |
| **TOTAL** | **12** | **4** | **0** | **16** |
**Completitud Global:** 75% completas + 25% parciales = **87.5% del proyecto**
---
## 🔍 Hallazgos y Recomendaciones
### ⭐ Fortalezas de la Documentación
1. **Estructura Modular Consistente** - Fácil navegación
2. **Trazabilidad Completa** - De requerimientos a implementación
3. **Documentación Técnica Exhaustiva** - BD, APIs, componentes
4. **Narrativas Claras** - Historias de usuario bien escritas
5. **Índices Maestros** - _MAP.md en cada épica
6. **Métricas Documentadas** - Presupuesto, SP, varianzas
7. **Lessons Learned** - Reflexiones post-sprint
### ⚠️ Áreas de Mejora Identificadas
#### 1. 🔴 CRÍTICO: Brecha de Test Coverage
**Problema:** Gap masivo entre estimado y real
- Fase 1: 88% estimado **18% real** (-70%)
- Fase 3: 92% estimado **18% real** (-74%)
- Solo 2 tests de 320 planificados
**Impacto:** Deuda técnica crítica, riesgo de regresiones
**Recomendación:** Plan de testing urgente (2 sprints dedicados)
#### 2. 🟡 MEDIO: Épicas Parciales Sin Roadmap
**Problema:** 4 épicas al 30-50% sin plan de completitud
- EXT-007: LTI Integration (40%)
- EXT-008: White Label (30%)
- EXT-009: Peer Challenges (50%)
- EXT-010: Parent Portal (35%)
**Recomendación:** Roadmap Q1 2025 con recursos asignados
#### 3. 🟡 MEDIO: Documentación Operacional Faltante
**Problema:** Sin runbooks, troubleshooting, scaling procedures
**Recomendación:** Crear guías operacionales antes de producción
#### 4. 🟡 MEDIO: Políticas RLS No Documentadas
**Problema:** 185 políticas sin detalle específico por tabla
**Recomendación:** Matriz de permisos por rol y tabla
---
## 🚀 Próximos Pasos
### Corto Plazo (1-2 semanas)
1. **🔴 Plan de Testing**
- Roadmap de 18% 80%
- Priorizar módulos críticos
- 2 sprints dedicados
2. **🔴 Consolidar Inventario BD**
- Auditoría completa de tablas
- Validar vs producción
3. **🟡 Documentar RLS**
- Listar políticas por tabla
- Matriz de permisos
### Mediano Plazo (1 mes)
4. **🟡 Roadmap Épicas Parciales**
- Q1 2025 para completar 4 épicas
- Recursos y dependencias
5. **🟡 Runbooks Operacionales**
- Troubleshooting
- Scaling
- Rollback plans
### Largo Plazo (2-3 meses)
6. **Performance Baselines**
- SLOs/SLAs
- Monitoring y alertas
7. **Matriz de Dependencias**
- Grafo de épicas
- Facilitar planificación
---
## 📚 Navegación Rápida por Tema
### Por Dominio Funcional
**Autenticación & Autorización**
- [EAI-001: Fundamentos](./01-fase-alcance-inicial/EAI-001-fundamentos/)
**Contenido Educativo**
- [EAI-002: Actividades](./01-fase-alcance-inicial/EAI-002-actividades/)
- [EXT-006: CMS](./03-fase-extensiones/EXT-006-contenido/)
**Gamificación**
- [EAI-003: Gamificación](./01-fase-alcance-inicial/EAI-003-gamificacion/)
- [Sistema de Recompensas v2.3.0](./sistema-recompensas/)
**Analytics & Reportes**
- [EAI-004: Analytics](./01-fase-alcance-inicial/EAI-004-analytics/)
- [EXT-005: Reportería](./03-fase-extensiones/EXT-005-reportes/)
**Administración**
- [EAI-005: Admin Base](./01-fase-alcance-inicial/EAI-005-admin-base/)
- [EXT-002: Admin Extendido](./03-fase-extensiones/EXT-002-admin-extendido/)
**Portal Maestros**
- [EXT-001: Portal Maestros](./03-fase-extensiones/EXT-001-portal-maestros/)
**Infraestructura**
- [EMR-001: Migración BD](./02-fase-robustecimiento/EMR-001-migracion-bd/)
**Comunicaciones**
- [EXT-003: Notificaciones](./03-fase-extensiones/EXT-003-notificaciones/)
**Perfiles de Usuario**
- [EXT-004: Perfiles Avanzados](./03-fase-extensiones/EXT-004-perfiles/)
**Integraciones** (Parciales)
- [EXT-007: LTI Integration](./03-fase-extensiones/EXT-007-lti-integration/) 🟡
- [EXT-008: White Label](./03-fase-extensiones/EXT-008-white-label/) 🟡
**Social Features** (Parciales)
- [EXT-009: Peer Challenges](./03-fase-extensiones/EXT-009-peer-challenges/) 🟡
- [EXT-010: Parent Portal](./03-fase-extensiones/EXT-010-parent-notifications/) 🟡
---
## 🏗️ Arquitectura del Proyecto
### Stack Tecnológico
**Backend:**
- NestJS (Node.js + TypeScript)
- 13 módulos
- 417 endpoints REST
- JWT Authentication
- OAuth (5 proveedores)
**Frontend:**
- React 18 + TypeScript
- Zustand (state management)
- 200+ componentes
- Vite (build tool)
**Base de Datos:**
- PostgreSQL
- 16 schemas modulares
- 123 tablas
- 127 índices
- 185 políticas RLS
- 213 funciones
- 90 triggers
- 208 foreign keys
**Fuente de métricas BD:** Ver inventarios en `orchestration/inventarios/` (validación física 2025-11-11)
**Testing:**
- Jest (unit tests)
- Supertest (integration)
- React Testing Library (frontend)
### Schemas de Base de Datos
| Schema | Tablas | Propósito |
|--------|--------|----------|
| `auth` | 1 | autenticación estándar (sistema) |
| `auth_management` | 11 | Gestión autenticación |
| `educational_content` | 8 | Contenido educativo |
| `gamification_system` | 12 | Gamificación |
| `progress_tracking` | 10 | Tracking progreso |
| `admin_dashboard` | 6 | Dashboard admin |
| `content_management` | 7 | Gestión contenido |
| `social_features` | 8 | Features sociales |
| `storage` | 5 | Archivos |
| `audit_logging` | 6 | Logs auditoría |
| `system_configuration` | 4 | Configuración |
| `lti_integration` | 5 | Integración LTI (EXT-007) |
| `gamilit` | 10 | Schema principal |
| `public` | 2 | Público (mínimo) |
---
## 📞 Contacto y Soporte
**Equipo de Desarrollo:**
- Backend: backend@gamilit.com
- Frontend: frontend@gamilit.com
- Base de Datos: database@gamilit.com
**Documentación:**
- Issues: [GitHub Issues](https://github.com/gamilit/gamilit/issues)
- Wiki: [GAMILIT Wiki](https://wiki.gamilit.com)
- API Docs: [Swagger](http://localhost:3006/api/docs)
---
**Última actualización:** 2025-12-18
**Versión del índice:** 1.1
**Generado por:** Equipo GAMILIT + Claude Code
**Actualización:** Módulos M4-M5 implementados, Admin Portal P2 completado