workspace/projects/gamilit/docs/90-transversal/inventarios-database/inventarios/INVENTORY-MASTER-REPORT.md
rckrdmrd ea1879f4ad feat: Initial workspace structure with multi-level Git configuration
- Configure workspace Git repository with comprehensive .gitignore
- Add Odoo as submodule for ERP reference code
- Include documentation: SETUP.md, GIT-STRUCTURE.md
- Add gitignore templates for projects (backend, frontend, database)
- Structure supports independent repos per project/subproject level

Workspace includes:
- core/ - Reusable patterns, modules, orchestration system
- projects/ - Active projects (erp-suite, gamilit, trading-platform, etc.)
- knowledge-base/ - Reference code and patterns (includes Odoo submodule)
- devtools/ - Development tools and templates
- customers/ - Client implementations template

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2025-12-08 10:44:23 -06:00

18 KiB

Reporte Maestro de Inventario - Base de Datos GAMILIT

Fecha generación: 2025-11-07 Versión: 1.0 Fase: Fase 1 - Inventario y Auditoría Completa Estado: COMPLETADO Sistema: SIMCO (Sistema Indexado Modular por Contexto)


📊 Resumen Ejecutivo

Inventario Completo

Tipo de Objeto Cantidad Real Documentado Gap % Completitud
Schemas 13 10 +3 77%
Tablas 64 48 +16 75%
ENUMs 37 24 +13 65%
Funciones 61 ? ? 0%
Triggers 52 ? ? 0%
RLS Policies 24 ? ? 0%
Índices 74 ? ? 0%
Vistas 16 12 +4 75%
Seeds 47 32 +15 68%

Total de objetos: 388 objetos de base de datos identificados


🚨 Hallazgos Críticos

1. Schema public - Arquitectura Rota (P0 - CRÍTICO)

Problema

El 89% de los ENUMs (33 de 37) están mal ubicados en el schema public, rompiendo la arquitectura modular del sistema.

Objeto En public Deberían estar en schemas específicos
ENUMs 33 Distribuidos por schemas funcionales
Tablas 9 educational_content, social_features
Triggers 21 Distribuidos por schemas
Índices 64 Distribuidos por schemas
Vistas 3 Distribuidos por schemas

Impacto

  • Alto: Rompe la separación de concerns
  • Alto: Dificulta el mantenimiento
  • Alto: Complica el versionado y migraciones
  • Medio: Afecta performance (todos los objetos en un schema)

Recomendación

Plan de migración urgente para redistribuir objetos de public a sus schemas correctos.


2. Duplicación de Objetos (P0 - CRÍTICO)

Tablas Duplicadas

Tabla Schema 1 Schema 2 Acción Requerida
classrooms social_features public Consolidar en social_features
classroom_members / classroom_students social_features public Consolidar en social_features
notifications gamification_system public Consolidar en gamification_system

ENUMs Duplicados

ENUM Schema 1 Schema 2 Acción Requerida
maya_rank gamification_system public (rango_maya) Consolidar, eliminar rango_maya

Triggers Duplicados

Trigger Schema 1 Schema 2
trg_classroom_members_updated_at social_features public
trg_update_classroom_count social_features public
trg_classrooms_updated_at social_features public
trg_schools_updated_at social_features public
trg_teams_updated_at social_features public
trg_feature_flags_updated_at system_configuration public
trg_system_settings_updated_at system_configuration public
21-trg_update_user_stats_on_exercise progress_tracking public
22-exercise_submissions_updated_at progress_tracking public
23-trg_module_progress_updated_at progress_tracking public

Total: 10 triggers duplicados

Impacto

  • Crítico: Riesgo de inconsistencia de datos
  • Crítico: Confusión sobre cuál tabla es la "correcta"
  • Alto: Duplicación de datos
  • Alto: Complejidad de mantenimiento

Acciones Inmediatas

  1. Comparar esquemas de tablas duplicadas
  2. Verificar uso en backend (entities)
  3. Contar registros en cada tabla
  4. Determinar tabla "correcta" (más usada, mejor diseño)
  5. Plan de migración de datos
  6. Actualizar referencias en backend
  7. Deprecar y eventualmente eliminar duplicados

3. Distribución Desequilibrada de Objetos

89% de ENUMs en Schema Incorrecto

public:          33 ENUMs (89%) ⚠️ INCORRECTO
gamification:     1 ENUM (3%)   ✅
auth:             2 ENUMs (5%)  ✅
storage:          1 ENUM (3%)   ✅

86% de Índices en public

public:              64 índices (86%) ⚠️
auth_management:      2 índices (3%)
content_management:   2 índices (3%)
gamification:         4 índices (5%)
progress_tracking:    2 índices (3%)

Recomendación

Redistribuir objetos según arquitectura modular:

  • ENUMs → schemas funcionales que los usan
  • Índices → schemas de sus tablas correspondientes

📋 Inventario Detallado por Tipo

Schemas (13)

# Schema Tipo Estado Doc
1 auth Core
2 auth_management Core
3 gamilit Core/Utils
4 gamification_system Feature
5 educational_content Feature
6 progress_tracking Feature
7 content_management Feature
8 social_features Feature
9 system_configuration System
10 audit_logging System
11 admin_dashboard Admin ⚠️ NO DOC
12 storage System ⚠️ NO DOC
13 public Legacy? ⚠️ NO DOC

Documentación: 01-SCHEMAS-INVENTORY.md


Tablas (64)

Schema Tablas %
auth_management 12 19%
gamification_system 12 19%
public 9 14% ⚠️
social_features 7 11%
audit_logging 6 9%
content_management 5 8%
progress_tracking 5 8%
educational_content 4 6%
system_configuration 3 5%
auth 1 2%

Tablas en public que deberían moverse:

  • assignments (+ 4 tablas relacionadas) → educational_content
  • classrooms, classroom_students → Consolidar en social_features
  • notifications → Consolidar en gamification_system
  • teacher_noteseducational_content o nuevo schema

Documentación: 02-TABLES-INVENTORY.md


ENUMs (37)

Schema ENUMs % Estado
public 33 89% ⚠️ MAL UBICADOS
auth 2 5%
gamification_system 1 3%
storage 1 3%

ENUMs de public que deben moverse:

→ gamification_system:

  • achievement_category, achievement_type
  • maya_rank (duplicado de gamification.maya_rank)
  • rango_maya (duplicado, eliminar)
  • comodin_type, transaction_type

→ social_features:

  • classroom_role, team_role
  • friendship_status, social_event_type

→ educational_content:

  • exercise_type, cognitive_level
  • difficulty_level, module_status
  • progress_status, attempt_status, attempt_result

→ content_management:

  • content_type, content_status
  • media_type, processing_status

→ audit_logging:

  • audit_action, log_level
  • alert_severity, alert_status

→ system_configuration:

  • notification_type, notification_channel, notification_priority
  • setting_type, metric_type
  • aggregation_period

→ auth_management:

  • gamilit_role (ya existe roles tabla)
  • user_status

Documentación: 03-ENUMS-INVENTORY.md (pendiente crear)


Funciones (61)

Schema Funciones %
gamification_system 23 38%
gamilit 13 21%
progress_tracking 7 11%
public 7 11%
auth_management 6 10%
educational_content 2 3%
auth 1 2%
audit_logging 1 2%
social_features 1 2%

Funciones críticas:

  • gamification_system.calculate_user_rank - Cálculo de rangos maya
  • gamification_system.process_exercise_completion - Otorgamiento de XP y ML coins
  • auth_management.verify_user_permission - Autorización
  • progress_tracking.record_exercise_attempt - Tracking de progreso

Funciones en public que deben moverse:

  • is_feature_enabled, update_feature_flagsystem_configuration
  • send_notificationgamification_system o social_features
  • log_system_eventaudit_logging
  • cleanup_old_*audit_logging

Documentación: 04-FUNCTIONS-INVENTORY.md (pendiente crear)


Triggers (52)

Schema Triggers %
public 21 40% ⚠️
gamification_system 7 13%
auth_management 6 12%
social_features 5 10%
educational_content 4 8%
content_management 3 6%
progress_tracking 3 6%
system_configuration 2 4%
audit_logging 1 2%

Patrón común: trg_*_updated_at - Actualiza columna updated_at automáticamente

Triggers duplicados: 10 triggers (ver sección de duplicación)

Documentación: 05-TRIGGERS-INVENTORY.md (pendiente crear)


RLS Policies (24)

Schema Policies %
gamification_system 8 33%
social_features 8 33%
educational_content 2 8%
progress_tracking 2 8%
audit_logging 1 4%
auth_management 1 4%
content_management 1 4%
system_configuration 1 4%

Nota: public NO tiene RLS policies (⚠️ Potencial riesgo de seguridad)

Schemas sin RLS:

  • admin_dashboard (solo vistas, OK)
  • storage (solo ENUMs, OK)
  • gamilit (solo funciones, OK)
  • auth (extendido por auth_management)

Documentación: 06-RLS-POLICIES-INVENTORY.md (pendiente crear)


Índices (74)

Schema Índices %
public 64 86% ⚠️
gamification_system 4 5%
auth_management 2 3%
content_management 2 3%
progress_tracking 2 3%

Problema: 64 de 74 índices (86%) están en public, deberían estar distribuidos por schemas.

Tipos de índices encontrados:

  • B-tree (mayoría)
  • GIN (JSONB, arrays)
  • Partial indexes (con WHERE clauses)
  • Unique indexes
  • Composite indexes

Documentación: 07-INDEXES-INVENTORY.md (pendiente crear)


Vistas (16)

Schema/Tipo Vistas %
gamification_system (views) 4 25%
gamification_system (materialized) 4 25%
admin_dashboard 4 25%
public 3 19%
progress_tracking 1 6%

Vistas materializadas:

  • mv_global_leaderboard - Leaderboard global
  • mv_classroom_leaderboard - Leaderboard por clase
  • mv_weekly_leaderboard - Leaderboard semanal
  • mv_mechanic_leaderboard - Leaderboard por mecánica

Admin dashboard views:

  • user_stats_summary - Resumen de estadísticas de usuarios
  • organization_stats_summary - Estadísticas de organización
  • moderation_queue - Cola de moderación
  • recent_admin_actions - Acciones recientes de admins

Nota: Se esperaban 12 vistas, se encontraron 16 (+4)

Documentación: 08-VIEWS-INVENTORY.md (pendiente crear)


Seeds (47)

Environment Seeds %
dev 34 72%
prod 5 11%
staging 5 11%
production 3 6%

Seeds críticos (prod/production):

  • Tenants, system settings, feature flags
  • Auth providers (OAuth)
  • Achievement categories
  • Leaderboard metadata
  • Módulos educativos

Seeds de desarrollo:

  • Demo users, demo progress
  • Test data completo
  • Marie Curie contenido
  • Ejercicios de todos los módulos

Nota: Hay diferencia entre prod y production - ¿consolidar?

Documentación: 09-SEEDS-INVENTORY.md (pendiente crear)


📈 Análisis de Discrepancias

Comparativa: Documentado vs Real

Objeto Docs Original Real Gap Explicación
Schemas 9 13 +4 admin_dashboard, storage, public + 1 error de conteo
Tablas 48 64 +16 9 en public + 7 otras
ENUMs 24 37 +13 33 mal ubicados en public
Vistas 12 16 +4 4 materialized views + 4 admin
Seeds 32 47 +15 Seeds de dev no documentados

Total gap: 52 objetos no documentados


🎯 Plan de Acción Priorizado

Fase 2A: Resolución de Duplicaciones (P0 - Urgente)

Duración: 2-3 días Prioridad: 🔴 CRÍTICA

Tareas:

  1. Comparar tablas duplicadas:

    \d public.classrooms
    \d social_features.classrooms
    -- Comparar estructura, constraints, indexes
    
  2. Verificar uso en backend:

    grep -r "public\.classrooms" apps/backend/
    grep -r "social_features\.classrooms" apps/backend/
    
  3. Contar registros y decidir tabla correcta:

    SELECT count(*) FROM public.classrooms;
    SELECT count(*) FROM social_features.classrooms;
    
  4. Plan de consolidación:

    • Determinar tabla "source of truth"
    • Migrar datos si es necesario
    • Actualizar backend entities
    • Deprecar tabla incorrecta
    • Testing en staging
    • Deploy y eliminación

Entregables:

  • Análisis de duplicaciones (SQL + screenshots)
  • Plan de migración detallado
  • Scripts de consolidación
  • Backend actualizado
  • Validación en staging

Fase 2B: Migración de public Schema (P0 - Urgente)

Duración: 3-5 días Prioridad: 🔴 CRÍTICA

Tareas:

  1. Crear plan de migración por tipo:

    • 33 ENUMs → Distribuir por schemas funcionales
    • 9 tablas → Mover a schemas correctos
    • 21 triggers → Redistribuir
    • 64 índices → Redistribuir
    • 7 funciones → Redistribuir
    • 3 vistas → Redistribuir
  2. Orden de migración (respetando dependencias):

    1. ENUMs (sin dependencias)
    2. Tablas (pueden referenciar ENUMs)
    3. Índices (dependen de tablas)
    4. Funciones (pueden usar tablas)
    5. Triggers (usan funciones)
    6. Vistas (usan tablas + funciones)
    
  3. Actualizar backend constants:

    // apps/backend/src/shared/constants/database.constants.ts
    // Actualizar referencias de schemas
    
  4. Sincronizar ENUMs con backend:

    npm run sync:enums
    

Entregables:

  • Plan de migración completo (SQL migrations)
  • Scripts de migración por tipo de objeto
  • Backend constants actualizados
  • Validación de sincronización
  • Testing completo

Fase 2C: Documentación de Schemas Faltantes (P1 - Alta)

Duración: 1-2 días Prioridad: 🟠 ALTA

Schemas a documentar:

  1. admin_dashboard (4 vistas)
  2. storage (1 ENUM)
  3. public (análisis de legacy vs funcional)

Entregables:

  • docs/03-desarrollo/base-de-datos/schemas/admin_dashboard/README.md
  • docs/03-desarrollo/base-de-datos/schemas/storage/README.md
  • docs/03-desarrollo/base-de-datos/schemas/public/ANALYSIS.md (análisis + plan)

Fase 2D: Documentación de Objetos Faltantes (P1 - Alta)

Duración: 2-3 días Prioridad: 🟠 ALTA

Crear inventarios documentados:

  • 03-ENUMS-INVENTORY.md (37 ENUMs)
  • 04-FUNCTIONS-INVENTORY.md (61 funciones)
  • 05-TRIGGERS-INVENTORY.md (52 triggers)
  • 06-RLS-POLICIES-INVENTORY.md (24 policies)
  • 07-INDEXES-INVENTORY.md (74 índices)
  • 08-VIEWS-INVENTORY.md (16 vistas)
  • 09-SEEDS-INVENTORY.md (47 seeds)

Actualizar documentación principal:

  • apps/database/README.md (actualizar estadísticas)
  • Diagramas ERD completos
  • Matriz de dependencias actualizada

📊 Métricas de Progreso

Estado Actual (Fase 1 Completada)

Fase Estado Progreso
Fase 1: Inventario COMPLETO 100%
Fase 2: Documentación Pendiente 0%
Fase 3: Consolidación Pendiente 0%
Fase 4: Sincronización Pendiente 0%
Fase 5: Validación Pendiente 0%

Objetos Inventariados vs Documentados

Inventario:    388 objetos  ████████████████████ 100%
Documentación: 200 objetos  ██████████░░░░░░░░░░  52%
Gap:           188 objetos  ░░░░░░░░░░           48% restante

🔗 Referencias SIMCO

Este es el Reporte Maestro del sistema SIMCO (Sistema Indexado Modular por Contexto)

Inventarios Detallados

  • 01-SCHEMAS-INVENTORY.md
  • 02-TABLES-INVENTORY.md
  • 03-ENUMS-INVENTORY.md Pendiente
  • 04-FUNCTIONS-INVENTORY.md Pendiente
  • 05-TRIGGERS-INVENTORY.md Pendiente
  • 06-RLS-POLICIES-INVENTORY.md Pendiente
  • 07-INDEXES-INVENTORY.md Pendiente
  • 08-VIEWS-INVENTORY.md Pendiente
  • 09-SEEDS-INVENTORY.md Pendiente

Scripts de Inventario

  • apps/database/scripts/inventory/list-tables.sh
  • apps/database/scripts/inventory/list-enums.sh
  • apps/database/scripts/inventory/list-functions.sh
  • apps/database/scripts/inventory/list-triggers.sh
  • apps/database/scripts/inventory/list-rls.sh
  • apps/database/scripts/inventory/list-indexes.sh
  • apps/database/scripts/inventory/list-views.sh
  • apps/database/scripts/inventory/list-seeds.sh

Documentación Relacionada

  • Plan Maestro: apps/database/PLAN-ACTUALIZACION-DOCUMENTACION.md
  • Plan de Validación: apps/database/PLAN-VALIDACION-COMPLETO.md
  • Criterios de Validación: apps/database/CRITERIOS-VALIDACION.md

Referencias de Código

  • DDL: apps/database/ddl/schemas/
  • Seeds: apps/database/seeds/
  • Backend Constants: apps/backend/src/shared/constants/
  • Documentación: docs/03-desarrollo/base-de-datos/

Conclusiones

Logros de Fase 1

  1. Inventario completo de 388 objetos de base de datos
  2. Identificación de 3 schemas no documentados
  3. Detección de duplicaciones críticas (tablas, ENUMs, triggers)
  4. Análisis del problema de public schema (130+ objetos mal ubicados)
  5. 8 scripts de inventario automatizados creados
  6. Sistema SIMCO implementado con referencias cruzadas completas

Problemas Críticos Identificados

  1. 🚨 33 de 37 ENUMs (89%) mal ubicados en public
  2. 🚨 10 triggers duplicados entre schemas
  3. 🚨 3 tablas duplicadas (classrooms, classroom_members, notifications)
  4. 🚨 64 de 74 índices (86%) en public en lugar de schemas específicos
  5. 🚨 9 tablas de assignments en public en lugar de educational_content

Próximos Pasos

Inmediato:

  1. Revisar este reporte con el equipo
  2. Priorizar plan de consolidación de duplicados
  3. Aprobar plan de migración de public schema
  4. Iniciar Fase 2A (resolución de duplicaciones)

Esta semana:

  • Completar Fase 2 (documentación + consolidación)
  • Actualizar backend references
  • Testing exhaustivo en staging

Próxima semana:

  • Desplegar cambios a producción
  • Validación final
  • Cierre de Fase 1-2 del plan maestro

Generado por: Sistema de Inventario Automatizado SIMCO Fecha: 2025-11-07 Responsable: Equipo de desarrollo GAMILIT Próxima actualización: Inicio de Fase 2A